Berglund Construction Company - PowerPoint PPT Presentation

1 / 29
About This Presentation
Title:

Berglund Construction Company

Description:

Berglund Construction Company – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 30
Provided by: ACIG
Category:

less

Transcript and Presenter's Notes

Title: Berglund Construction Company


1
Berglund Construction Company
  • Facing the Challenges

2
Historical Overview
  • Established In 1911
  • Fred Berglund - Swedish Immigrant
  • Began Masonry Restoration Work

3
(No Transcript)
4
Startup of General ContractorPost WWII
5
Berglund Construction - Who We Are Today
  • Building Division
  • Restoration Division
  • Revenues 120 Million annually
  • Average Man Hours 625,000
  • Geographic Region
  • Chicagoland Area
  • Northwest Indiana
  • Milwaukee, Wisconsin

6
BankFinancial
7
Montgomery Police Station
8
University of Chicago Press
9
St. Mary Medical Center
10
United States Custom House
11
Fermi Accelerator Lab
12
EM Dirksen Courthouse JC Kluczynski Federal
Building
13
St. Peter Paul Church
14
Company Challenges
  • Challenge 1 Assuring Quality Scaffold Equipment
  • Associated Problems
  • No Control Over Rental
  • Limited Service Control

15
  • Solutions Assure Quality Equipment
  • Create In House Scaffold Motor Service
    Department
  • Certified Technicians
  • Service Over 100 Motors
  • Regular Inspections every 25 to 40 hours
  • Service Stages Cables

16
  • Challenge 2 Curtail Silica Exposure to Our
    Employees and the General Public
  • Associated Problems
  • Inadequate Tools
  • OSHA City of Chicago Inspections
  • Respiratory Protection

17
  • Solutions - Develop a Full, Silica Exposure
    Program
  • Developed Union Controlled Respirator Program
  • Designed Developed Dustless Grinder with Bosch

18
  • Challenge 3 Reduce Lifting Cutting Injuries on
    Swing Stages
  • Associated Problems
  • Handling Heavy Materials on Parapets
  • Unstable Surface for Cutting With Skill Saw

19
  • Solutions - Develop a Material Handling Program
    Eliminate Stage Cutting
  • 3 ½ Gallon Buckets for Mortar
  • Bagged Goods to Smaller Weight
  • 100 Down to 50lbs. / 80 Down to 40 Lbs.
  • Lift Gates Used
  • All Skill Saw Cuts on Ground or Roof

20
Berglund Warehouse
21
  • Challenge 4 Eliminate Water Infiltration in
    High-Rise Buildings
  • Associated Problems
  • Openings in High-Rise Buildings
  • Driving Wind and Rain

22
  • Solutions - Develop Water Tight Weather Proof
    System
  • Radio Communications for Weather Alerts
  • Solid Temporary Closures for all Openings
  • Maintain all Roof Drains

23
In Addition
  • Hired a Full Time Safety Director
  • Citys High-Rise Emergency Response Contractor
  • Worked With OSHA on Swing Stage Policies for the
    City of Chicago, Post Hancock Building
  • Worked With City of Chicago on Mandated Scaffold
    Program
  • Safety Manuals and Policies Written and
    Distributed
  • and the results were

24
EMR 1.21 !
25
Joined ACIG October 2002
  • Berglund implemented zero injury process
  • Shifted Accountability to all Levels of
    Management
  • Call Owner within 15 Minutes of Incident
  • Raised Awareness of Every Employee
  • Changed the Culture of Berglund to Safety 1st

26
(No Transcript)
27
Present Day
  • Berglund Academy
  • Over 100 Employees Receive 15 hours continuing
    education
  • Three Key Areas
  • Safety
  • Quality Control
  • Operations

and the current results are
28
(No Transcript)
29
Thank You !
Write a Comment
User Comments (0)
About PowerShow.com