Hans, KIM - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Hans, KIM

Description:

IMS has release based approach (already start Release 7) ... Roaming. Terminal MoB. Mobility/ Management. On-demand (BW, Priority... – PowerPoint PPT presentation

Number of Views:37
Avg rating:3.0/5.0
Slides: 11
Provided by: industry1
Category:
Tags: kim | hans | roaming

less

Transcript and Presenter's Notes

Title: Hans, KIM


1
Release approach and CJK requirements
  • Hans, KIM
  • TTA
  • hans9_at_kt.co.kr

2
Contents
  • Release Approach
  • Status and review of Release 1
  • Proposal

3
Release Approach
  • IMS has release based approach (already start
    Release 7)
  • FG NGN also agreed to get similar approach like
    Release
  • IMS (Release 6 based) would be incorporated into
    NGN Release

NGN - Convergence Model
FG NGN Standards
Video Services (TV, movie, etc)
Recommendations Technical Reports
Data Services (WWW, e-mail, etc)
Telephone Services
Rec. Y.NGN-FRM
Services
Rec. Y.NGN-MOB
Rec. Y.NGN-CMIP
TR. e2e.qos.1
TR. atmipa
API
TR. 123.qos
Transport
TR. enet
TR. NGN.qos
ACCESS
ACCESS
CORE
NGN Release 1
NGN Release 2
NGN Release 3
Future Packets (?)
IMS
Beyond IMS
Ethernet or others
xDSL
Optic
4
Release Approach
Criteria for set up Releases in FG NGN
  • Target dates Realization of NGN
  • Services and Capabilities (include Network and
    Control Capability)
  • Architecture, components and Specifications

(?)
End of 2006
I/F 2
End of 2005
I/F 1
NGN Release 1
NGN Release 2
NGN Release 3
  • Services Capabilities SC 1
  • Functional Arc. Spec. FAS 1
  • IW and Interconnection IAI 1
  • Migration MIG 1
  • SC 2 SC 1 A2
  • FAS 2 FAS 1 B2
  • IAI 2 IAI 1 C2
  • MIG 2 MIG 1 D2
  • FPS Based (?)

5
Release Approach
Problem Status of current plan for NGN
  • Role and position of IMS (Release 6) in NGN is
    not yet clear
  • But Release 1 mostly developed based on Release
    1/TISPAN (IMS)
  • Concerns from non-Europe NGN mainly for
    Mobile(?) and Europeans (?)
  • Views and Opinions from CJK having further
    requirements (?)

NGN Release 1
NGN Release 2
NGN Release 3
(?)
NGN Release 1
(?)
NGN Release 2
NGN Release 3
I/F 2
I/F 1
(?)
(?)
(Rel.7 ?)
IMS (Rel.6)
Beyond IMS
6
Status and Review of Release 1
TISPAN NGN Release 1
7
Status and Review of Release 1
FG NGN Release 1
8
Status and Review of Release 1
FG NGN Release 1
9
Proposal
Concern about FG NGN Releases
  • Release 1 mainly leaded by European requirements
  • Input for the Release 1 could be closed at
    November
  • Need check gaps and further requirements from CJK
  • Specially Network aspects include control
    features could be developed from CJK
  • NGN FG only have Release 1 plan plan for
    future releases such as Release 2 and Release
    independent etc. are not clear yet
  • Optic infrastructure based requirements would be
    next release (Release 2 ?)

Initiate Release 2 from CJK
10
Proposal
Proposed characterization of FG NGN Releases
Write a Comment
User Comments (0)
About PowerShow.com