AARRRF FRA Cooperative Agreement CA Project Status Updates - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

AARRRF FRA Cooperative Agreement CA Project Status Updates

Description:

ARINC continues to facilitate telecons for the ERAD working group of the Railway ... Mar 6--Face-to-face meeting with surviving contenders ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 8
Provided by: sou117
Category:

less

Transcript and Presenter's Notes

Title: AARRRF FRA Cooperative Agreement CA Project Status Updates


1
AAR/RRF - FRA Cooperative Agreement (CA) Project
Status Updates
  • December 2006

2
AAR-FRA Cooperative Agreement
  • Universal Onboard Platform (UPO) Project
  • Obtained and reviewed clarifications to proposals
    received.
  • Have begun negotiation of contract terms and
    conditions with one vendor.
  • Negotiate extension of proposal validity with one
    vendor due to funding availability timeline.

3
RRF-FRA Cooperative Agreement
  • Messaging Standards
  • ARINC continues to facilitate telecons for the
    ERAD working group of the Railway Electronics
    Standards Committee. Efforts are focused on
    interoperability lab set up, test of an ERAD
    application over a foreign network, and planning
    for connectivity to the UNL test bed site through
    BNSF's interoperability lab.
  • Produced a draft a White Paper on Interoperable
    Messaging
  • Industry CBTC Test Bed at TTC
  • Continued development of design documentation for
    train simulator, dispatch simulator, and test
    environment controller
  • Employee in Charge Portable Remote Terminal (EIC
    PRT)
  • Held October 19 design demonstration at the AAR
    Offices
  • Attended by FRA, AAR, and member railroads
  • All work stopped for 9 weeks pending FRA approval
    of administrative change in budget allocations

4
RRF-FRA Cooperative Agreement
  • 220 MHz RCL Test Bed Development
  • TTCI continues to develop test requirements, test
    plans and test procedures to complete the CAI
    specification
  • Discussion and Decision Needed
  • Should TTCI proceed, at this time, with the
    development of a facility to test compliance of
    radios to the CAI specification?
  • Higher Performance Data Radio
  • Held QA meeting with prospective RFI respondents
    and granted a two week extension of the RFI
    response period.
  • RFI responses received from 5 suppliers.

5
WiNG
Wireless Next Gen
RESC Dec 13, 2006
6
HPDR Timeline
Dec 12--Review of five respondents to RFI
Dec 19--Distribute materials from Dec 12 meeting
Jan 2--Send letters to respondents
Jan 10--Cutoff for more Clarification Cycle
questions
Jan 11--WiNG Conference Call
Jan 17--Clarification questions to respondents
Feb 16--Deadline for responses to Clarification
Cycle
Feb 22--WiNG Conference Call
Mar 6--Face-to-face meeting with surviving
contenders
TBD--Final determination of vendor(s) to go
forward
TBD--Bench POC tests
TBD--Field Trials
7