Title: Gerald Gentleman Station Well Field Meeting April 26, 2004
1Gerald Gentleman Station Well Field
MeetingApril 26, 2004
2WelcomeThank you for coming!
Beth Boesch Corporate Communications
Manager Nebraska Public Power District
3Meeting Agenda
- NPPD goals
- Communications
- Well field information effects
- Monitoring plan
- Project status
- Well mitigation process
- Current Follow-up Actions
- Questions
4NPPDs Goals Communication
Bill Fehrman President and CEO, Nebraska Public
Power District
- Ensure adequate water levels are in Sutherland
Reservoir for GGS operation - Help GGS comply with discharge water temperature
limits - Maintain long-term viability of the Ogallala
Aquifer
5NPPDs Goals Communication (cont.)
- Identify and mitigate potential effects to
neighboring wells before they create adverse
impact - Enforce NPPDs approved Board Resolution
- Provide for communication and feedback
6Communications
- Local committee
- Neighboring well owners/producers
- Twin Platte NRD
- Jim Goeke, Research Hydrogeologist, UNL
- NPPD
- Web-based Sutherland Reservoir elevation data
- Web-based project status updates
7Well Field Information Effects
Brian Barels Water Resources Manager, NPPD
- Cooling Water Process
- Well Field Configuration
- Projected well field effects
- Groundwater monitoring
8(No Transcript)
9Well Field Configuration
- Approximately 40 wells
- 2,000 gallons/minute
- 350-500 feet deep
- 30-40 year life
- Final well locations are under review
10Projected Well Field Effects
- Some water table drawdown outside of GGS property
boundary field is expected - Pumped water will not be released to the
downstream canal system other than through normal
seepage/leakage - No influence on Republican River system
- Low net consumption of water over time
11(No Transcript)
12(No Transcript)
13Groundwater Monitoring- Overview -
- Monitor effects of the GGS well field operation
- To update groundwater model for use as a
predictive tool for mitigation
14Groundwater Monitoring Process
- Bi-annual Independent monitoring by Twin Platte
NRD - Thirty (30) existing non-NPPD wells near
Sutherland Reservoir - Continuous monitoring of GGS wells
- Additional NPPD monitoring of some wells off NPPD
property - Data collected will be available to the public
15Twin Platte NRD Independent monitoring sites
around GGS
16Project Status
John Cizek Senior Engineer/Project Manager,
Gerald Gentleman Station
- Well field installation contract to Henkle
Drilling and Supply - NPPD staff and Hemenway Groundwater Engineering
providing construction management - Mobilization April 19 drilling April 25
- Wells installed, tested and registered by July 1
- Installation of pumps, piping and power source
will continue through Fall, 2004
17Well Mitigation Process
Bill Fehrman NPPD President and CEO
- Board Resolution
- NPPD will proactively identify and mitigate
potential effects of the GGS well field on
neighboring wells before these effects create
adverse impact - Neighboring well owners can also contact NPPD to
initiate the mitigation process - Challenge is identification of well problem causes
18Current Follow-up Actions
- Reviewing well locations
- Providing Sutherland Reservoir elevation data
- Developing off property monitoring
- Working with local committee
- Continuing to take your comments
- Web site www.nppd.com/drought/
- Call Center 1-877-ASK-NPPD
19Questions?
20Thanks for coming.Please drive home safely.