Title: New Business Horizon with ITmk3


1
New Business Horizon with ITmk3Producing the
Pig Iron from the Oxidized Iron Ore
Concentratein one Technological Process
  • Working Paper for the ITmk3 Family Conference
  • Kyiv, April 3, 2009
  • Prepared by Razaz Younes
  • Managing Director
  • Hares Engineering GmbH.

2
Iron and Steel Industry Main Problems
  • In addition to several issues, the Iron and Steel
    Industry is facing the following main problems
  • The BF and BOF are facing the serious problem in
    the supply of its raw material, which it is
  • Iron Ore pellets produced from the magnetite ore
    with sufficient iron content (about 67)
  • Metallurgical coke
  • EAF is facing the shortage in the Scrap supply
  • The environmental situation in world starts to be
    in position that it is not possible to produce
    more steel with current emissions level serious
    solution should be developed to avoid more harms
    to our nature
  • At the same time, a stable demand on the steel
    will always exist due to increase of the world
    population. The new coming generations will be in
    need of steel to build their civilization

3
Oxidized Iron Ore in the Nature
  • Usually the Oxidized iron ore Hematite exists
    in the upper layer because of the oxidization
    reaction with the atmosphere and below the
    Hematite layer the Magnetite is lying down.
  • Beneficiation of the Hematite is difficult and
    expensive comparing with the Magnetite, therefore
    the mine company that has the both types usually
    prefer to extract the hematite and to store it in
    order to reach the Magnetite that will be more
    efficient to beneficiate. This will lead to
  • Huge amount of the Hematite to be stored that
    creates environmental problem
  • Considerable costs should be born to extract the
    Hematite and to store it without any direct
    investment relation to this natural resource
    usually, these costs to be calculated on the
    magnetite mining cost.
  • The iron content existing in the Hematite will
    stay without its value account, since the
    investment into the Magnetite will always be more
    efficient somehow, it is national resource which
    is not relevantly capitalized.

4
Pig Iron Production by ITmk3 comparing with the
Classic Technologies
  •  The below calculation is typical and it is
    considered the market indicators of 2007 to avoid
    the market turbulence caused by the current
    crisis that provides unreadable factors
  • ITmk3 is producing the pig iron nuggets
  • The raw material of ITmk3 is the iron ore
    concentrate
  • Pig iron is producing in Blast Furnace
  • The raw material of BF is the pellets
  • Pellets are produced from the iron ore
    concentrate
  • Summarized calculations
  • Production of the pig iron by classic technology
    (blast furnace) costs 300-325 USD per ton, the
    sales price of pig iron is 340-360 USD per ton
    and capital investment is equal to 300 USD per
    ton of production. To produce the pellets it is
    required to invest 50-60 USD per ton of capacity.
    Therefore, investment capital for each ton of pig
    iron starting from concentrate (as ITmk3) is
    equal to 30060 360 USD
  • Production of the pig iron by ITmk3 technology
    costs 150 USD per ton, the sales price is 340 USD
    , and the capital investment is equal to 300 USD
    per ton of production.
  • As summary production cost per ton of pig iron
    nuggets by ITmk3 is less by 50 from the
    production cost in Blast Furnace, and capital
    investment per ton in case of ITmk3 is less by
    20 of the investment required in case of Blast
    Furnace.

5
(No Transcript)
6
Production cost for Pig Iron by Blast Furnace
    Blast furnace route Blast furnace route  
Parameter Units Units/t HM Cost /unit /t HM
Coke t 0.33 200.00 65.00
Coal t   -
Pellets t 1.60 100.00 160.00
Concentrate t   -
Bentonite t   -
Raw Materials   225.00
     
Labor M-H 0.70 20.00 14.00
Natural gas GJ 7.68 7.00 53.76
Limestone t 0.05 20.00 1.00
Oxygen Nm3 104.90 0.04 4.20
Blown air Nm3 1.08 2.60 2.80
Steam to stoves t 0.02 5.50 0.11
BF gas GJ 2.30 0.54 1.24
Power kWh 133.00 0.050 6.65
Water Nm3 0.70 0.65 0.46
Electrodes kg    
Energy (DRI melting) kWh    
Na2CO3 de-P/de-S t 0.23 70.00 15.89
Oxygen for de-P Nm3 32.87 0.04 1.31
Nitrogen for de-P Nm3 6.40 0.037 0.24
Maintenance Cap 0.02 130.435 2.61
Consumables   104.25
Misc. supplies Var 0.05 104.25 5.21
ConsumablesSupplies   109.47
     
By product credits    
Top gas GJ 8.29 0.80 (6.63)
Slag t 0.25 7.75 (1.94)
Sub-total Credits   (8.57)
Conversion Cost       100.90
Conversion Raw Mat'ls       325.90
7
Production cost for iron nuggets by ITmk3
Case Study
Item Cons. Price Cost
Item /t-Ng
Iron Ore (t) 1.56 25.0 39.00
Reductant Coal (t) 0.37 90.0 33.30
Binder (t) 0.02 320 6.23
Fluxes(t) 0.19   14.80
Hearth Material (t) 0.11 57.0 6.27
Fuel (MMBtu) 6.6 4.6 30.40
Electrical Power (kWh) 200 0.050 9.93
Water (m3) 2.0 0.01 0.03
N2 or Inert Gas(Nm3) 20.0 0.04 0.80
Chemicals     1.00
Royalty     5.00
Variable Cost Total     146.8
       
Labor Managment (men) 40   2.5
Maintenance     5.0
Fixed Cost Total     7.5
       
Total Cash Cost     154.25
8
ITmk3 Experience with Oxidized Iron Ore
  • Kobe Steel has tested several types of hematite
    iron ore in the box furnace in Kobes Laboratory
  • Some of them were tested by a continuous
    operation at the bench scale test facility in
    Kobes Kakogawa works
  • One US hematite was tested in Mesabi Nugget Pilot
    Demonstration Plant in Minnesota
  • Recently and as result of the cooperation between
    Kobe Steel, Hares Engineering and Ministry of
    Industrial Policy of Ukraine on evaluation of the
    possibility to produce the iron nuggets from the
    Hematite concentrate beneficiated at KGOKOR
    laboratory using the High Intensive
    Electro-Magnetic beneficiation method designed
    for the KGOKOR, the iron Nuggets have been
    successfully produced
  • Tables below show the experience of the ITmk3 in
    production of Iron Nuggets from several
    international resources of Hematite, including
    the Ukrainian Hematite from KGOKOR

9
(No Transcript)
10
Real Example KGOKOR Project in Ukraine
  • The KGOKOR Project has been designed to produce
    the pellets from the hematite iron ore by the
    following technological steps
  • Crushing milling the hematite iron ore, or the
    raw material preparation section
  • Beneficiating the oxidized iron ore by High
    Intensive Electro-Magnetic method to produce the
    hematite concentrate up to 61-64 Fe content.
  • Pelletizing the concentrate into pellets
  • Roasting the pellets into roasting plant
  • General remarks on the current process at KGOKOR
  • The process will consume high energy, especially,
    the gas
  • Ukraine needs and works on developing new energy
    saving policy, especially, in the metallurgical
    and chemical industry, the biggest energy
    consumer sector in Ukraine
  • The result of this process is the pellets with
    low iron content what will provide relevantly
    with a product with low added value
  • Improvement of the beneficiation by using new
    technology like floatation would mean another
    investment capital and high beneficiation cost
  • The produced pellets should be treated in the BOF
    to produce the pig iron this means another
    energy consumption, especially, the gas and more
    off gas emission, although Ukraine needs and is
    working on improving its environmental situation.
  • The complete investment cycle starting the
    hematite iron ore and finishing with the produced
    pig iron does not show a high efficient
    investment scheme.

11
Kobe Steel - Hares Engineering Suggestion for
KGOKOR Project Solution
  • Kobe Steel and Hares Engineering are cooperating
    with the Ministry of Industrial Policy of Ukraine
    to develop technical and economical solution for
    KGOKOR Project by using the ITmk3. It is based
    on the following principles
  • Completing the existing facilities in raw
    material preparation and beneficiation plant to
    produce the hematite iron ore concentrate with
    62-64 Fe content (60 Fe content is workable for
    ITmk3)
  • Using this hematite concentrate to produce the
    pig iron as Iron Nuggets avoiding the BOF and
    Blast Furnace process
  • General remarks on this solution
  • Technically the plant will produce new upgraded
    product with superior technical specification
  • Economically the plant will produce high added
    value product that is demanded worldwide the
    plant will start to enjoy feasible economical
    indicators
  • Environmentally the plant will enable to produce
    the pig iron nuggets with less energy
    consumption and less emissions, especially, the
    CO2 (ITmk3 reduces Co2 emission up to 20 per
    each ton of produced pig iron)
  • Financially the project will open new horizon
    for investors and the possibility to attract
    several international financial facilities due to
    the following main factors the project is
    Feasible, its products are of International
    demand and upgraded to commodity level product,
    and the project is environmentally friendly
  • Kobe Steel and Hares Engineering are now in
    process of developing investment opportunity for
    KGOKOR Project, based on ITmk3 technology, by
    implementing international financing scheme

12
Conclusions
  • By ITmk3 and Oxidized Iron Ore it is possible to
    generate the Money stocked in the Oxidized Iron
    Ore Mines
  • The ITmk3 opens new investment opportunity to
    exploit the hematite iron ore, especially, in
    Ukraine where almost all mining companies
    stocking this raw mineral resource without good
    capitalization, creating another environmental
    problem and loosing good investment opportunity
  • ITmk3 produces the pig iron nuggets with less
    energy consumption and less environmental
    emissions
  • In Ukraine, exploitation of the hematite by
    efficient technology like ITmk3 will support the
    national income and will improve the investment
    in the national resource
  • In addition, The ITmk3 and EAF as Ukrainian
    Strategy to produce the Steel using the national
    resource of energy will lead to
  • Reduction in consumption of the NG and forwarding
    its saved volume to other consumers
  • Energy saving in production of one ton of steel
  • More efficient use of the national resource of
    the energy
  • Improvement of the environment with keeping the
    steel productivity of the country
  • Will generate additional national income

13
Projects of Hares Engineering in the CIS
Countries
  • Confirmed Projects

14
In Kazakhstan
  • SBS Group
  • Hares Engineering agreed with SBS Group to build
    three ITmk3 Plants in Aktobe City by formula of
    12. The engineering works to be started in April
    2009
  • SBS Group is interested to build the first plant
    as soon as possible. This could request to start
    some of the construction works by SBS very soon
  • SBS Group has contracted Hares Engineering for
    the Engineering Works

15
In Russia
  • Aricom Group
  • Hares Engineering worked with Aricom for one year
    to evaluate the project
  • Aricom has contracted the company Hatch as
    independent consulting engineering company to
    decide about the best technology for their mine.
    Hatch reported that ITmk3 is the best available
    solution
  • Aricom also has contracted Hares Engineering to
    fulfilled Preliminary Plant Specification and
    Pre-Feasibility Study to install five plants at
    its Kimkano-Sutarsky Mine
  • Hares Engineering has fulfilled the
    above-mentioned study and the results were
    positive. Aricom confirmed in its strategic plan,
    published on its website, its intention to build
    five plants at its KS Mine until 2016. Aricom
    intends to start the development of
    pre-contracting engineering and bankable
    feasibility study in 2009

16
  • EuroChem Project
  • EuroChem has contracted Hares Engineering to
    prepare PPS Study to install two plants at its
    mining company called Kovdorsky GOK. The study
    should be accomplished in April 2009 and two
    companies will decide on the next stage
  • The laboratory testing of the iron ore
    concentrate of Kovdorsky GOK showed positive
    results

17
  • OMK Project
  • OMK is one of the biggest producer of the steel
    pipes in Russia and Europe
  • It is one of the main suppliers of pipes for the
    North Stream Project to build the gas pipe line
    under the sea between Russia and Germany
  • The Iron Nuggets product provides OKM with the
    possibility to produce the goods of higher
    quality with less energy consumption which will
    provide OMK with higher efficiency for its
    industry
  • OMK has contracted Hares Engineering to prepare
    PPS study to install two ITmk3 plants
  • The study will be accomplished in May, 2009

18
In Ukraine
  • Metinvest is the biggest iron ore miner in
    Ukraine, it owns three mines in the country
    called SEV-GOK, C-GOK and IN-GOK
  • Hares Engineering is working with Metinvest for
    the last two years to prepare the PPS for its
    mines and accomplished two study for SEV-GOK and
    C-GOK
  • Metinvest requested Hares Engineering to use
    Hatch company as independent engineering company
    to evaluate the PPS study for SEV-GOK and C-GOK
    and to decide about the best technology comparing
    ITmk3 with other nine technologies. Hatch
    confirmed the accuracy of Hares Engineering study
    and recommended Metinvest that ITmk3 is the best
    technology for its mines
  • Metinvest is thinking about production of 2.5
    million tons of Iron Nuggets, which means five
    ITmk3 Plants
  • Hares Engineering and Metinvest is still working
    on the last PPS study before the final decision

19
KGOKOR Project
  • ITmk3 is the only technology that could offer to
    this Project a real technical solution that
    provides the plant with the workable efficiency
  • Hares Engineering and Kobe Steel is creating
    consortium for the common investment in this
    Project
  • The Consortium contacted the Ukrainian Authority,
    who decided to cooperate in developing technical
    and economical solution for the KGOKOR Project
  • The Consortium is fulfilling preliminary
    engineering study to confirm the main objectives
    and the efficiency of the project (PPS Study)
  • The Consortium is working with the Governments of
    Japan and Ukraine to include this project under
    GIS Agreement between the two countries
  • The Consortium is discussing this project with
    potential investors and financiers. The results
    are encouraging