Benchmarking Case Study - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Benchmarking Case Study

Description:

1. Benchmarking Case Study. Engineering Design. Chris LoPiccolo. Moreland City Council ... of projects delivered in compliance with agreed Design Program schedule ... – PowerPoint PPT presentation

Number of Views:142
Avg rating:3.0/5.0
Slides: 13
Provided by: ACIG7
Category:

less

Transcript and Presenter's Notes

Title: Benchmarking Case Study


1
Benchmarking Case Study
  • Engineering Design
  • Chris LoPiccolo
  • Moreland City Council
  • Assisted by
  • ACIG

2
The LGPro Benchmarking Project
  • Objectives
  • Gain benchmarking skills.
  • Form networks.
  • Benchmark a service in each network.
  • Make comparisons
  • Data
  • Processes
  • Practices
  • Find improvements to services.

3
Learning through Benchmarking
As-Is picture
Service Scope
Comparisons
Gap Analysis 1
Process Maps
Improvement Plan
Implemented improvements!
KPIs, Performance data
Best Practice picture
Best Practice features
Current Practices
Gap Analysis 2
Best Practice performance data
4
Engineering Design
  • Survey Data Collection
  • Design
  • Contract Administration
  • Contract Supervision
  • Construction Management

5
KPIs
  • Customer Satisfaction
  • of projects delivered in compliance with agreed
    Design Program schedule
  • jobs with greater than 5 deviance of
    construction costs from estimate
  • Design rework rate
  • Average number of variations per project
  • Average number of design changes at construction
    stage
  • Average cost over-run per project
  • Average cost under-run per project
  • no. of noncompliances with policies, standards,
    guidelines per project
  • reduction in traffic accidents
  • Design cost as of total project construction
    cost
  • small projects
  • medium roads projects
  • large roads projects
  • medium drainage projects
  • large drainage projects
  • medium 'other' projects
  • large 'other' projects
  • all projects combined

6
Comparisons of data
7
Comparisons of data
8
Comparisons of data
9
Process maps
10
Best Practices Gap Analysis
  • Developed for each of the main processes, grouped
    under
  • Policy Strategy
  • Structure, Resourcing Financing
  • Planning Scheduling
  • Delivering the Service
  • Monitoring Reporting

11
Improvement Plans
  • Examples
  • 1.      Develop standard briefs for survey,
    concept design and detailed design that includes
    the purpose, context and outputs for a project.
    Risk assessments and safety plans also to be
    included.
  • 2.      Develop standard control tasks,
    checklists and documentation for projects in all
    phases (survey, consultation, concept and
    detailed design).
  • 3.      Develop brochures and standard circulars
    for various tasks / stages for design services
    and projects.
  • 4.      Develop Special Charge Scheme policy and
    standard documents around the process already
    developed.
  • 5.      Develop a framework to record decisions
    and approvals for consultation process.
  • 6.      Refine standards for documenting detailed
    design to be included in briefs and checklists.

12
Workshop
  • Form into groups.
  • Each group discusses one issue (papers to be
    given out list the issues)
  • 30 minutes workshop to discuss and prepare
    feedback for the session
  • Presentation 5 minutes each group
Write a Comment
User Comments (0)
About PowerShow.com