Title: Day Ahead Market Working Group


1
Day Ahead Market Working Group
  • April 14, 2003

2
Agenda
  • Discussion of SMD-style DAM
  • review questions posed by the DAM WG and Coral
    regarding the SMD-style DAM
  • Discussion of Coral Bid-Ask Trade DAM
  • resolution of status
  • NYISO Imports/Exports in DAM
  • Next Steps -- April 22 Face-to-Face

3
NYISO Imports/Exports in DAM
  • Introduction
  • Reference to NYISO Market Participant Manuals and
    Technical Bulletins _at_ http//www.nyiso.com/service
    s/documents.html
  • Examine NYISO as potential IMO model
  • Consider current RT Intertie procedures relative
    to DAM
  • Unique elements of NYISO

4
NYISO Imports/Exports in DAM
  • Submitting Import/Export Bids
  • All transactions from external control areas are
    required to be submitted into the NERC ETAG
    system prior to becoming active schedules
  • DAM closes 0500 Results posted 1100
  • E-Tag changes can be made before DAM closes,
    after DAM posts results, but before 2200 (All
    times prior day)

5
NYISO Imports/Exports in DAM
  • NYISO Reference Bus
  • External generators and loads submit transaction
    bids into the NYISO DAM against the Marcy LBMP
    reference bus - NYISO_LBMP_REFERENCE
  • Used to calculate all marginal loss and
    congestion costs in the system
  • External energy sales or purchases are settled on
    the LBMP (Locational Based Marginal Price)
  • LBMP Reference Bus Energy Losses -
    Congestion
  • For Ontario Zone - source bus (exports to NYISO)
    or sink bus (imports from NYISO) is -
    OH_GEN_BRUCE or OH_LOAD_BRUCE
  • Additional points for PJM, NE and HQ

6
NYISO Imports/Exports in DAM
  • Scheduling
  • Import/Export bids are approved through SCUC or
    BME
  • Schedules must be coordinated with corresponding
    control area
  • With respect to BME and for economic priority,
    default price -1000 assigned for imports
  • External transactions scheduled in the Day-Ahead
    Market (DAM) have economic priority over
    resources bid competitively in the Hour-Ahead
    Market (HAM) in the determination of which
    transactions are permitted to flow in real-time
  • Transactions are financially binding in DAM
    regardless if curtailed

7
NYISO Imports/Exports in DAM
  • Multi-Hour Block Transactions
  • DA firm external transaction bids may be offered,
    specifying a minimum run-time, and if accepted,
    awarded a multi-hour block schedule at the bid MW
    amount
  • Evaluated in the Day-Ahead Market relative to
    alternative offers
  • Easier to coordinate scheduled external
    transactions with corresponding transactions in
    neighboring control areas
  • Checkout process with the neighboring control
    area confirms each hour of a DAM scheduled
    multi-hour block transaction independently
  • Transaction hours are subject to curtailment in
    real-time based upon HAM bid parameters
  • Minimum run times will only be honoured within a
    commitment day, i.e., beginning Hour 1 ending
    Hour 24

8
NYISO Imports/Exports in DAM
  • Pre-Scheduling Transactions
  • MP can preschedule an external import or export
    transaction with the NYISO up to 18 months prior
    to the transaction date
  • Acceptance is determined by the availability of
    adequate hourly ramping and transmission capacity
    related to the affected external interface
  • Given an economic priority over other external
    transactions that are not prescheduled - will be
    a price taker and the entities involved agree
    to accept the DAM clearing prices in effect for
    the transaction
  • Submission deadline - 200 PM two days before
    transaction date
  • Imports/Exports are assigned bid prices of
    -1000/1000 to ensure priority scheduling in
    DAM
  • Parameters of DAM bids cannot be altered after
    submission deadline and if withdrawals are not
    approved then bids are financially binding once
    scheduled

9
NYISO Imports/Exports in DAM
  • IMO/NYISO Transaction Scheduling
  • Currently IMO and NYISO use a specific
    transaction scheduling protocol to schedule
    transactions and ensure fair and efficient use of
    the IMO/NYISO interface
  • Introduction of a DAM in Ontario will likely
    require a review and modification to this
    protocol to ensure resolution of new seams issues
    that may arise

10
Discussion Points
  • Ramp Capacity or Transfer Capabilities across
    interties
  • Transmission Congestion Costs - TCCs
  • Financial Transmission Rights - FTRs
  • Transmission Usage Costs TUCs

11