Herv Pero, Anna Maria Johansson DG RTDB - PowerPoint PPT Presentation

1 / 35
About This Presentation
Title:

Herv Pero, Anna Maria Johansson DG RTDB

Description:

Facilities, resources, and related services used. by the scientific community for ... Strategy Forum for Research Infrastr.) http://cordis.europa.eu/esfri/home.html ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 36
Provided by: dell313
Category:

less

Transcript and Presenter's Notes

Title: Herv Pero, Anna Maria Johansson DG RTDB


1
Community actions for Research Infrastructures
ICOS, Amsterdam, 19-20 May 2008
Hervé Pero, Anna Maria Johansson DG RTD-B ERA
Research Programmes and Capacity Research
Infrastructures Unit
2
Definition of Research Infrastructures
  • Facilities, resources, and related services
    usedby the scientific community for
  • Conducting leading-edge research
  • Knowledge transmission, knowledge exchanges and
    knowledge preservation
  • Includes
  • Major scientific equipment
  • Scientific collections, archives and structured
    information
  • ICT-based infrastructures
  • Entities of a unique nature, used for research

3
There are 3 types of RIs
4
9 major RI domains about 600 identified
facilities
More than 25 500 permanent scientists are
working in such facilities
5
Research Infrastructures pattern is rapidly
evolving in Europe
6
  • Europe is faced with a wide spectrum of issues
  • From Globally unique, to Regionally distributed
  • Many stakeholders (from ministries to
    researchers)
  • Underlying and growing use of e-infrastructures
  • Opportunities but difficulties of interaction
    between basic research and industry
  • Lack of funding (public and private)
  • single countries do not have the critical mass
    need to cooperate

7
RI policy has no other choice than continuing
reinforcing coordination
  • At EU level,
  • At national and regional,
  • At variable geometry,
  • At global level
  • This explains the importantrole of ESFRI and
    others

8
Towards a coherent policy for Research
Infrastructures ESFRI
  • A European Strategy Forum on Research
    Infrastructures
  • Launched in April 02
  • Brings together representatives of the 27 Member
    States, Associated States, and one representative
    of the European Commission (EC)

9
Role of ESFRI
  • To foster an open method of coordination
    between different countries
  • To discuss the long term vision at European level
    and to support the development of a European RI
    policy
  • To bring initiatives and projects to a point
    where decisions by ministers are possible
  • A stimulation and incubator role

10
The Roadmap
  • Mandate from the Council of Ministers,November
    2004
  • The Roadmap is the result of two years of
    intensive work
  • About 1000 high-level experts were involved, from
    every MS and AS, from most fields and user
    communities, giving the end product credibility
    and quality.
  • An ongoing process

11
The Roadmap (2)
  • Addressing seven (7) fields of Research and major
    challenges
  • From about original 200 proposals, thirty five
    (35) projects have been identified through
    several review stages
  • Community produced ideas that will open up new
    and unexpected areas of knowledge
  • Some fields should be stimulated for further
    integration

12
Global Dimension
  • Several of the projects on the Roadmap require a
    global approach 
  • ESFRI will enter into a dialogue with the OECD
    Global Science Forum for the identification,
    planning, discussion and monitoring of such
    projects
  • Major players are Australia, China, India, Japan,
    Russia, South Africa, USA

13
Who is the Roadmap for ?
  • Policy Makers
  • Researchers
  • Funders
  • Industry

The European Commission intends to play an active
role under the 7th Framework Programme.
14
Critical Issues
  • Developing transferable financial and legal
    structures for pan-European Research
    Infrastructures
  • Ensuring the human capacity is available and
    making it easier for researchers to move from one
    project to another
  • Interfaces with Technology Platforms

15
Updating of the Roadmap
  • At present 4 working-groups are preparing the
    first update of the roadmap. Their work include
    evaluating proposals submitted through ESFRI.
  • The updated roadmap will be published by end of
    2008.
  • It is suggested that the roadmap will be updated
    on a regular basis.

16
Funding for Research Infrastructureswithin
17
FP7 2007 - 2013
Budget (M) - Source Council decision in
December 2006
Capacities
18
Objectives of the CommunityResearch
Infrastructures action
  • Optimising the use and development of the best
    existing research infrastructures in Europe
  • Helping to create in all fields of S T new
    research infrastructures of pan-European interest
    needed by the European scientific community
  • Supporting programme implementation and policy
    development (e.g. international cooperation)

19
FP7 Research Infrastructures actions
30 increase according to FP6
20
FP7 will continue supporting existing Research
Infrastructures
  • Integrating Activities to promote the coherent
    use and development of research infrastructures
    in a given field, implemented through
  • Bottom-up calls
  • Targeted calls
  • ICT based e-infrastructures in support of
    scientific research

21
Integrating Activity in FP7
  • Help structuring better and integrating, on a
    European scale, the way research infrastructures
    operate and develop
  • Normally all major RIs in Europe in one field
  • At least 3 MS or AS
  • 3 types of activities in one project
  • Networking Activities
  • Trans-national Access / research services
  • Joint Research Activities
  • Based on the continuation of the successful FP6
    instrument I3, combination of collaborative
    project coordination and support actions

22
EUSAAR (Environment)
Developing a pan-European research infrastructure
for the measurements of atmospheric properties
EC contribution 5.1 M
  • TA (0.2 M)
  • 11 ground-based stations for atmospheric research
  • NA (3.2 M)
  • Standards and exchange of good practices on
    sampling, measurement and analysis of aerosol
    parameters
  • Training on aerosol sampling and measurements
  • Web portal and Database on aerosol products
  • JRA (1.7 M)
  • Methodology for determining aerosol optical
    density
  • Standards for aerosol hygroscopic growth analysis
  • A real time data collection of aerosol
    measurements

Size range of I3 3-10 M under FP7
  • A network of research stations based on
    regional diversity

23
FP7 Research Infrastructures actions
24
Support to new Research Infrastructures
  • Design studies to support the conceptual design
    for new facilities or major upgrades, of clear
    European dimension and interest
  • through bottom-up calls
  • Support to the Construction of new
    infrastructures, or major upgrades of existing
    Preparatory Phase, Construction Phase
  • the list of projects to be supported are based on
    the ESFRI roadmap

25
Preparatory phase- purpose
  • To provide a framework facilitating
    decision-making between partners from different
    countries. Work targeted at resolving bottlenecks
  • To address all the critical issues (legal,
    financial,..) that need to be resolved to allow
    the project moving forward
  • Technical work also possible but cannot be the
    core of the preparatory phase

26
Preparatory Phase facilitating financial
engineering for new research infrastructures
Member States
European Commission
Stakeholdersincl. EIROs
Inclusion in national Programmes
Inclusion in Specific RTD Programme(s)
Inclusion in DG REGIO / DG DEV strategic plans
Projects
EIB
RSFF
27
The EC is preparing an initiative for aLegal
Framework for the construction and operation of
new pan-European Research Infrastructures
(ERI)Meetings with stakeholders to ensure that
the new legal instrument responds to needsA
sounding board is also assisting the Commission
28
  • Objectives
  • Provide a new easy-to-use legal instrument
    adapted to European infrastructures, with the
    following characteristics
  • provide a legal personality recognized in all
    Member States
  • reflect the spirit of a truly European venture
  • be flexible to adapt to the requirements of the
    different specific infrastructures
  • provide some of those privileges and exemptions
    allowed at a national level for non-profit
    research and / or international organizations.

29
  • Characteristics of an ERI
  • Nature
  • scientific non-commercial character
  • provides world class research services (ensured
    by scientific evaluation)
  • European character (membership and European
    interest).

30
  • Characteristics of an ERI
  • Membership
  • States and/or legal entities designated by them
  • non European countries could participate
  • International organizations could participate
  • EC not foreseen to be a member

31
RIs for Air Pollution research
EUFAR, 5 m
Eurochamp, 3.5 m
EUSAAR 5.1 m
I3
IMECC, 6.7 m
More than 30 M
DS
IAGOS 2.6m
PP
ICOS, 4.3 m
EUFAR, 1 m
IAGOS ERI, 3.3 m
2008
2004
2006
2005
2011
2007
2010
2009
2013
2012
32
RIs for Biodiversity research
SYNTHESYS, 5 m
SeaDataNet 8.7 m
I3
BlackSeaSCENE, 2 m
25 M
CA
Ensconet, 2.5 m
DS
DesignAct 0.5 m
CNI
CeMACE 1m
LifeWatch, 5m
PP
2004
2006
2005
2011
2008
2007
2010
2009
2013
2012
33
RIs for Climate Change research
CA
Earlinetasos 2.7 m
More than 16 M
DS
EISCAT_3D, 2 m
PP
Aurora Borealis, 4.5 m
EMSO 3.9 m
Euro Argo 3 m
2004
2006
2005
2011
2008
2007
2010
2009
2013
2012
34
Policy development and Programme implementation
  • ERA-NETs for research infrastructures
  • Studies, conferences and coordination actions for
    policy development, including international
    cooperation
  • Coordination actions to support emerging needs
  • Network of National Contact Points (NCP)
  • Other Support actions, as appropriate

35
in summary, an improved FP7 action for
Research Infrastructures
  • Better consistency within FP7 (targeted calls)
  • Tackling better fragmentation (Integrating
    Activities)
  • Catalysing effect towards the construction or
    major upgrade of Research Infrastructures
  • A vision for the next 10-20 years fostering
    capacity building and excellence(in line with
    the ESFRI roadmap)

36
Planning of calls and indicative budget
Results end of May 2008
37
Useful links
  • Research Infrastructures in Europa
  • http//ec.europa.eu/research/infrastructures
  • FP7 and Capacities Specific Programme
  • http//cordis.europa.eu/fp7/home_en.html
  • http//cordis.europa.eu/fp7/capacities/home_en.ht
    ml
  • Research Infrastructures on CORDIS (FP6)
  • http//cordis.europa.eu/infrastructures/
  • ESFRI (Eur. Strategy Forum for Research
    Infrastr.)
  • http//cordis.europa.eu/esfri/home.htmlhttp/
    /www.e-irg.org
Write a Comment
User Comments (0)
About PowerShow.com