D - PowerPoint PPT Presentation

1 / 37
About This Presentation
Title:

D

Description:

D Hard Diffraction in Run I and Prospects for Run II. Andrew Brandt ... are included, lengths are measured and final gluing with optical epoxy is done ... – PowerPoint PPT presentation

Number of Views:17
Avg rating:3.0/5.0
Slides: 38
Provided by: DZE1
Category:
Tags: gluing

less

Transcript and Presenter's Notes

Title: D


1
DØ Hard Diffraction in Run I and Prospects for
Run II
  • Andrew Brandt
  • DØ / University of Texas, Arlington
  • Intro and Run I Hard Diffraction Results
  • Forward Proton Detector

Low-x Physics 2001 June 28, 2001 Krakow, Poland
2
Event Topologies
p p ? p p
p p ? p (p) X
p p ? p (p) j j
p p ? p p j j
3
Event Characteristics
4
Hard Color-Singlet Exchange
f
Count tracks and EM Calorimeter Towers in h lt
1.0
Dh
jet
jet
h
(ET gt 30 GeV, ?s 1800 GeV)
Measure fraction of events due to color-singlet
exchange
Measured fraction (1) rises with initial quark
content Consistent with a soft color
rearrangement model preferring initial quark
states Inconsistent with two-gluon, photon, or
U(1) models
Phys. Lett. B 440 189 (1998)
5
1800 and 630 GeV Multiplicities
?s 1800 GeV
?s 630 GeV
6
SD Event Characteristics
7

POMPYT Monte Carlo
p p ? p (or p) j j

Model pomeron exchange POMPYT26
(Bruni Ingelman) based on PYTHIA
define pomeron as beam particle
P
p
Structure Functions 1) Hard Gluon
xG(x) x(1-x) 2) Flat Gluon (flat in x) 3)
Quark xG(x) x(1-x) 4) Soft Gluon xG(x)
(1-x)5
p
p
? 1 - xp (momentum loss of proton)
P
8
hep-ex/9912061
9
Single Diffractive ? Distributions
? distribution for forward and central jets using
(0,0) bin
Dp p

central
?s 1800 GeV forward
central
?s 630 GeV forward
? ? 0.2 for ?s 630 GeV
10
Double Gaps at 1800 GeVJet h lt 1.0, ETgt15 GeV
Gap Region 2.5lthlt5.2
Demand gap on one side, measure multiplicity on
opposite side
DØ Preliminary
11
Double Gaps at 630 GeVJet h lt 1.0, ETgt12 GeV
Gap Region 2.5lthlt5.2
Demand gap on one side, measure multiplicity on
opposite side
DØ Preliminary
12
Diffractive W
nL0
?s 1800 GeV
ncal
ncal
nL0
Peak at (0,0) indicates diffractive W with a
signal on the 1 level
13
Gap Summary
  • Pioneered central gaps between jets, 3 papers,
    3 Ph. Ds
  • Observed and measured forward gaps in jet
    events
  • at ?s 630 and 1800 GeV. Rates much smaller
    than
  • expected from naïve Ingelman-Schlein model.
  • Require a different normalization and
    significant
  • soft component to describe data. Large
    fraction
  • of proton momentum frequently involved in
    collision.
  • Observed jet events with forward/backward gaps
  • at ?s 630 and 1800 GeV
  • Observed W and Z boson events with gaps
  • Finalizing papers and attempting to combine
    results

14
A Few New Interesting Things
  • Gap fractions at 630 are higher than
  • 1800 for Central Gaps and Hard SD,
  • but comparable for Double Gaps
  • Double gap events with 15 GeV jets
  • are about as rare as top events
  • Diffractive Ws and Zs have similar
  • gap fractions

15
FPD Layout
Roman Pot
Bellows
p
Detector
P1UP
P2OUT
Q4
D
S
Q3
S
Q2
Q4
Q3
Q2
D1
P1DN
P2IN
D2
A1
A2
23
33
59
57
33
23
0
Z(m)
Series of 18 Roman Pots forms 9
independent momentum spectrometers allowing
measurement of proton momentum and angle.
1 Dipole Spectrometer ( p ) x gt xmin 8
Quadrupole Spectrometers (p or p, up or
down, left or right) t gt tmin
16
Physics Topics with the FPD
1) Diffractive jet production 2) Hard double
pomeron exchange 3) Diffractive heavy flavor
production 4) Diffractive W/Z boson
production 5) New physics 6) Inclusive double
pomeron 7) High-t elastic scattering 8)
Total cross section 9) Inclusive single
diffraction FPD allows DØ to maximize Run II
physics
17
Data Taking
  • No special conditions required
  • Read out Roman Pot detectors for all events
  • (cant miss )
  • A few dedicated global triggers for diffractive
  • jets, double pomeron, and elastic events
  • Use fiber tracker trigger board -- select
  • x , t ranges at L1, readout DØ standard
  • Reject fakes from multiple interactions
  • (Ex. SD dijet) using L0 timing, silicon
  • tracker, longitudinal momentum conservation,
  • and scintillation timing
  • Obtain large samples (for 1 fb-1)
  • 1K diffractive W bosons
  • 3K hard double pomeron
  • 500K diffractive dijets

with minimal impact on standard DØ
physics program
18
Run II Event Displays
Hard Diffractive Candidate
Hard Double Pomeron Candidate
19
Diffractive Variables
pBeam
pF
P
Pomeron Exchange
Non-diffractive
For TeV
For
GeV
GeV
(Note
)
GeV
20
Acceptance
x
Quadrupole ( p or )
450 400 350 280 200
MX(GeV)
Geometric (f) Acceptance
x
Dipole ( only)
GeV2
450 400 350 280 200
MX(GeV)
GeV2
Dipole acceptance better at low t, large
x Cross section dominated by low t
x 0 0.02 0.04 1.4 1.4 1.3 2
35 95
21
Quadrupole Dipole Spectrometers
The combination of quadrupole and dipole
spectrometers gives 1) Detection of protons
and anti-protons a) tagged double pomeron
events b) elastics for alignment,
calibration, luminosity monitoring
c) halo rejection from early time hits
2) Acceptance for low and high t 3)
Over-constrained tracks for
understanding detectors and backgrounds
22
FPD Commissioning
23
Roman Pot Castle Design
Worm gear assembly
50 l/s ion pump
Detector
Beam
Step motor
  • Constructed from 316L Stainless Steel
  • Parts are degreased and vacuum degassed
  • Plan to achieve 10-11 Torr
  • Will use Fermilab style controls
  • Bakeout castle, then insert fiber detectors

24
Roman Pot
25
The Detector
4 Fiber bundle fits well the pixel size of H6568
16 Ch. MAPMT 7 PMTs/detector (most of the cost)
U
U
26
Detector Construction
  • Being completed at UTA
  • Four fibers are aligned together in the frame to
    make a channel
  • X frame also includes trigger scintillating rod
  • Bicron optical epoxy is used to secure the fibers
    into the frame once completely assembled
  • After curing, channels are mapped to appropriate
    location in cookie, PMT calibration fibers are
    included, lengths are measured and final gluing
    with optical epoxy is done

27
  • FPD Installation
  • All of the castles installed and tested,
    maintaining vacuum.
  • All the tunnel electronics installed and cables
    laid.
  • The PU spectrometer is instrumented with full
    detectors and phototubes.
  • The other vertical pots and dipole spectrometer
    are instrumented with pseudodetectors (trigger
    scintillators only) to study halo.
  • Cameras installed and safety review
  • complete
  • 63 MAPMTs have been ordered from Hamamatsu,
    expected delivery in late August

28
Castles Installed
29
Pot Motion LVDT vs. Encoder
30
Hit Reconstruction
  • This event (from Engineering Run data)
  • represents a hit in our detector at the location
  • xd 5.6 mm
  • yd 3.8 mm

31
Run II HSD Improvements
  • Measure ?, t over large kinematic range
  • Integrated FPD trigger allows large data samples
  • Higher ET jets allow smaller systematic errors
  • Comparing measurements of HSD with track tag vs.
    gap
  • tag yields new insight into process
  • Can calibrate calorimeter ? measurement without
    MC

32
June-August Run Plan
  • Dedicated FPD shifts with pots inserted
  • close to beam
  • Start with stand-alone DAQ then integrate
  • into DØ
  • Full system tests
  • Debugging, data-taking, algorithm
  • development, pot insertion procedure,
  • documentation, etc.

33
Long Range Plan
  • Install 8 more detectors (total of 10) during
  • September shutdown
  • Begin data taking with full DØ detector
  • and trigger list in October
  • Demonstrate working system, usefulness
  • of horizontal plane, and secure funding
  • for remaining MAPMT in 2002
  • Early papers
  • NIM
  • Elastic t-distribution
  • Single diffraction distributions
  • Diffractive jet production
  • Double tagged double pomeron exchange

34
Conclusion
  • Tremendous progress in installation and
  • commissioning
  • Entering a new phase of FPD
  • 1) Installation almost complete
  • 2) We have funding!
  • Emphasis shifts to software and operations
  • Trigger hardware and firmware still a big
  • concern
  • Starting to think about physics a little!

35
Tevatron Reconfiguration
BEFORE
Power Leads
Bypass
Run I
Separator

Q1
Dipole (C48-5)
P type spool
Low Beta
AFTER
(Same for D11 side)
Extended Bypass
Run II
Castle
Castle
Separator

Low Beta
S type spool
Dipole (C48-5)
Modified girder
Girder modified Bypass construction
completed Valves and other vacuum equipment
purchased
36
Dipole Region
Quadrupole Region
(Arbitrary Scale)
37
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com