CARE/ASAS Activity 3: ASM workshop Br PowerPoint PPT Presentation

presentation player overlay
1 / 6
About This Presentation
Transcript and Presenter's Notes

Title: CARE/ASAS Activity 3: ASM workshop Br


1
CARE-ASAS Activity 3Airborne Separation
MinimaFinal Workshop19 December, Brétigny
2
Agenda
  • Introduction to the ASM project (9h30)
  • Autonomous Aircraft results
  • Operational Service and Environment Description
    (OSED)
  • Operational Hazard Assessment (OHA)
  • Estimating airborne separation minima
  • Autonomous Aircraft Conclusions
  • Lunch (12h45-14h15)
  • Co-operative application results
  • Operational Service and Environment Description
    (OSED)
  • Operational Hazard Assessment (OHA)
  • Conclusions (until 16h30)

3
CARE/ASAS ASM Approach
  • Applicable methodologies

4
Project organisation
5
Selection of two applications (1/2)
  • Criteria of selection
  • Re-use of available work
  • Simplicity of the application
  • Compatible with work packages
  • Maturity of the application
  • Interest from ATM community
  • Most promising for ATM community
  • Knowledge of the CARE/ASAS Activity 3 team
  • Address the maximum of relevant issues

6
Selection of two applications (2/2)
  • Autonomous Operation Application
  • FFAS segregated airspace with no radar coverage,
    no ATC support
  • No fixed routes
  • FFAS surrounded by MAS only
  • Co-operative Separation Assurance Application
  • Time-based separation criteria
  • Flight crew ensures responsibility for airborne
    separation
  • Airborne separation minima may be lower than ATC
  • RD work with no implementation objectives
Write a Comment
User Comments (0)
About PowerShow.com