1York Road Streetscape Project
- Wednesday, October 14, 2009
2York Road Streetscape ProjectIntroductions
- Kirk Gabriel Transportation Project Engineer
- Mark Brown Transportation Project Planner
- Todd Lang Consultant Project Manager
- Mark Ledebur Consultant Project Engineer
- Elected Officials
- Community Leaders
3York Road Streetscape ProjectPurpose Discuss
Project Status Action Items
- Agenda
- Welcome
- Project History
- Project Status
- Phase 1 - Objectives Proposed Improvements
- Project Locations and Examples of Design Issues
- Question and Answer/Interactive Map Session
4York Road Streetscape ProjectProject History
- Completed Construction Repaving GBA
Streetscape (Northern Pkwy to Homeland Ave.) - York Road SNAP Plan. Recommendations included
- Pedestrian and Bicycle safety improvements
- Bus shelter/stop location improvements
- Additional speed limit signs
- 39th St. and Cold Spring Lane intersection safety
improvements and traffic calming throughout York
Road - Beautification (trees, landscaping, street
furniture, etc)
5York Road Streetscape ProjectProject History
- 2004 York Road Corridor Master Streetscape
Concept Plan York Road Partnership - 2008 York Road Corridor Traffic Study
- CIP Process and Funding Cuts
- Phased York Road Streetscape Projects
- Phase 1 Glenwood Avenue to 43rd Street
- Phase 2 43rd Street to 29th Street (2012 or
later)
6York Road Streetscape ProjectPhase 1 Project
Status Constraints
- Phase 1 Design Stage Initiated October 2009
- Budget - 5 Million
- Funding Available Fiscal Year 2011 (July 2010)
- Construction to be Completed within Existing
Right-Of-Way - We are using York Road SNAP and York Road
Partnership Streetscape plan as guides, but
budget constraints will limit decorative features
of project
7York Road Streetscape ProjectPhase 1
Objectives Proposed Improvements
- Pedestrian Safety
- ADA compatibility
(Ramps and Entrances) - Curb and Sidewalk Repairs
- Crosswalk Improvements
Striping, Signals and
Potential Bump-outs - Pedestrian Lighting
- Possible mid-block crosswalk/pedestrian refuge
area between Winston and Cold Spring Lane
8York Road Streetscape ProjectPhase 1
Objectives Proposed Improvements
- Bump-outs can decrease the distance pedestrians
have to walk to cross streets and provide
additional landscaping and beautification
9York Road Streetscape ProjectPhase 1
Objectives Proposed Improvements
- Vehicular Operation and Safety
- Potential Striping Revisions for Left-turn
Movements - Traffic Signal Modification and/or Reconstruction
- Review of Available Parking Locations
- Upgrade Existing Signage (e.g. Speed Limit)
10(No Transcript)
11York Road Streetscape ProjectPhase 1
Objectives Proposed Improvements
- Bicycle Safety
- Bicycle Lane Striping
- Signing
- Bicycle-compatible Inlet Grates
12York Road Streetscape ProjectPhase 1
Objectives Proposed Improvements
- Bicycle Safety
- Floating bike lanes will shift between 5 outer
lane near curb during peak hour parking
restrictions and regular 11 traffic lane during
off-peak regular parking hours
When Parking Is Restricted
When Parking Is Allowed
13York Road Streetscape ProjectPhase 1
Objectives Proposed Improvements
- Transit Facility Improvement
- Bus Stop Repairs
- Review of Current Bus Stop Operation and
Locations and Potential Revisions - Provide Bus Stop Amenities as needed (Bus
Shelters, Benches, etc) - Bus stop location improvements should consider
both phases of project (Glenwood to 29th St.)
14York Road Streetscape ProjectPhase 1
Objectives Proposed Improvements
- Pavement Repairs
- Patching
- Base Repairs
- Milling and Overlay of Existing Pavement
- Minimal Full Depth Construction
- Recent Roadway Resurfacing in Good Condition to
Remain
15York Road Streetscape ProjectPhase 1
Objectives Proposed Improvements
- Streetscape Improvements
- Expanded Tree Pits
to reduce
impervious surfaces - Additional Street Trees
- Provide Benches and Trash Receptacles
as needed. - Pedestrian Lighting
16York Road Streetscape Project
- Project Locations and Examples of Design Issues
17York Road Streetscape ProjectGlenwood Ave. to
Beaumont Ave.
18 19- Roadway, Curb, and Sidewalk Damage
20 21York Road Streetscape ProjectBeaumont Ave. to
Winston Ave.
22 23- Potential Crosswalk and Signal Improvements
24- Roadway, Curb, and Sidewalk Damage
25York Road Streetscape ProjectWinston Ave. to
Radnor Ave.
26 27- Roadway, Curb, and Shoulder Damage
28 29- Potential Crosswalk Improvements
30York Road Streetscape ProjectRadnor Ave. to E.
Cold Spring Ln.
31 32- Roadway, Curb, and Sidewalk Damage
- Potential ADA Conflicts
33 34 35York Road Streetscape ProjectE. Cold Spring Ln.
to E. Old Cold Spring Ln.
36- Substandard Tree Planters
37 38- Potential Crosswalk and Signal Improvements
39 40York Road Streetscape Project E. Old Cold Spring
Ln. to Northway
41- Potential Non-Bicycle Compatible Inlet Grates
(Project Wide)
42- Substandard Tree Planters
43 44 45York Road Streetscape ProjectNorthway to E. 43rd
St.
46- Potential Crosswalk and Signal Improvements
47 48- Substandard Tree Planters