Title: The%20Big%20Family%20Readiness%20Review


1
The Big Family Readiness Review
  • 1st Run Period Threshold Pion Production
  • 2nd Run Period Transversity d2n
  • 3rd Run Period Ay 3He(e,ed)

2
Why are we having this review?- John Domingo
3
E04-007 Threshold Pion Production
  • Left HRS _at_ 12.5? - 50? Negative (Right Arm Not
    Required)
  • Cryo-target 20 cm race track plus new 4 cm
    pancake target
  • BigBite with Wirechamber Hadron Package (40? -
    60?)
  • two wire-chambers (one upgraded)
  • dE/E trigger scintillators
  • updated frame cabling
  • 4He Bag System

4
E06-010 11 Transversity
  • Left HRS _at_ 16? - 75? (S1, S2M, A1, RICH, Gas
    Cherenkov, Pion Rejector)
  • BigBite _at_ 30? with Electron Package
  • three wirechambers (two chambers from Hadron
    package)
  • upgraded preshower shower (scope pending
    funding)
  • new gas Cherenkov (critical for d2)
  • GEN timing scintillators
  • Polarized 3He Target System
  • transverse field coils
  • large diameter exit beam pipe
  • Fastbus for Chamber Readout

5
E06-014 d2n
  • Left HRS _at_ 30? - 70? (S1, S2M, A1, Gas Cherenkov,
    Pion Rejector)
  • BigBite _at_ 45? with Electron Package
  • detectors the same as Transverity
  • Polarized 3He Target System
  • change to in-plane polarization

6
E05-015 Ay
  • The Big Hop (Left HRS and BigBite Trade Places)
  • Left HRS _at_12.5? - 20? with Negative Polarity
  • Right HRS _at_12.5? - 20? with Negative Polarity
  • BigBite with neutron detector for testing _at_ large
    angle
  • Polarized 3He Target System
  • nominal exit beam-line

7
E05-102 3He(e,ed)
  • Left HRS _at_ 15?- X? with Negative Polarity
  • Right HRS _at_ 12.5? with Negative Polarity
  • BigBite with Hadron Package Hall A Neutron
    Detector _at_ 70?
  • system check during E05-015
  • Polarized 3He Target System

8
Schedule and Milestones
  • 2007-04 Group DAQ Layout Finished
  • 2007-06 DAQ Completed and Tested
  • 2007-07 Begin PreShower / Shower Upgrade
  • Scope of Upgrade Still Pending Funding
  • Project Defined By April 1st
  • 2007-07 Install Chambers In Hadron Package
  • 2007-09 Complete Hadron Package Testing
  • 2007-10 Submit FY08 Requisitions For Transversity
    d2
  • Local Construction Items
  • Cherenkov Gas
  • 2007-12 Complete Electron Package Testing
  • Must Have Chambers Back In Hadron Package Before
    Christmas
  • 2008-01 Install Threshold Pion Experiment
  • 2008-03 Install Transversity d2n Experiments
  • 2008-04 Complete Neutron Detector Veto
  • 2008-07 Install Ay 3He(e,ed) Experiments (The
    Big Hop)

9