Conducting%20pump%20tests%20in%20the%20vertical%20shaft,%20 - PowerPoint PPT Presentation

About This Presentation
Title:

Conducting%20pump%20tests%20in%20the%20vertical%20shaft,%20

Description:

Lowering the submersible pump for the first test, May (27-28) ... The pump is placed in the shaft. Pipeline connecting the vertical shaft and the open reservoir ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 2
Provided by: kla139
Category:

less

Transcript and Presenter's Notes

Title: Conducting%20pump%20tests%20in%20the%20vertical%20shaft,%20


1
Conducting pump tests in the vertical shaft,
9.IX. mine (May 27- 30, 2009)
Water sampling for chemical analysis
Pillar crane
Lowering the submersible pump for the first test,
May (27-28)
Lowering the submersible pump through a 6m long
pipe for the second test, May (28-30)
Pipeline connecting the vertical shaft and the
open reservoir
Open reservoir for the discharged water
The pump is placed in the shaft