1
San Carlos Apache Water Delivery Project
  • David Neumann
  • June 18, 2003

2
Outline
  • Company background
  • Project background
  • Problem definition
  • Proposed approach
  • Optimization
  • Operations model
  • Summary

3
Who are the Stetson Engineers?
  • We design, test, and manufacture fine hats

4
Stetson Engineers
  • Established in 1958
  • Offices in California and Arizona
  • 60 employees
  • Clients include Indian tribes, water districts,
    state, federal, local governments
  • Engineering services include
  • Surface water
  • Agricultural
  • Water rights
  • Groundwater
  • Environmental
  • Municipal

5
What is the San Carlos Apache Water Delivery
project
  • Develop up to 77,000AF/year of CAP and other
    waters for agriculture and other uses
  • We have been tasked to
  • Develop and evaluate alternative delivery plans

6
Project Location
7
Water Delivery Project Goals
  • Develop an irrigation project that has the lowest
    cost and highest benefit
  • Fully use water rights and funding provided by
    the government
  • Develop various parts of the reservation

8
Water Supply Locations
9
Work Timeline
  • Completed
  • Reconnaissance analysis
  • Appraisal analysis
  • Determined three concept alternatives
  • Next Step
  • Feasibility study
  • Detailed environmental impacts analysis (EIS/EIR)

10
Project Alternatives
  • Three alternatives consist of
  • Pumping stations
  • Distribution pipelines and canals
  • On and off stream reservoirs
  • Groundwater recharge and pumping
  • Pass-through reservoirs

11
Project DescriptionAlternative 1
12
Problem definition
  • We need tools to
  • Further investigate project sizing and operating
    policy
  • Analyze the impacts of the projects on
  • Hydrology
  • Water quality

13
Two models
  • Optimization Prescriptive Calculate best
    project sizes and operations to meet a flow
    criteria
  • Operations Descriptive Calculate storage and
    flows given project size and operations

14
Optimization Model
  • Use an efficient algorithm to get the most
    cost-effective project sizes and number of acres
    to irrigate
  • Start with a loosely constrained model
  • Add constraints to see their effect

15
Optimization layout
16
Problems with the optimization Model
  • Time step
  • Perfect foresight
  • Simplified operating rules
  • Linearization errors

17
RiverWare Operations Model
  • Operations model will take the project sizes from
    the optimization model
  • Verify that sizing criteria has been met
  • Determine impacts

18
RiverWare Model development
  • Model and rules are under development
  • Difficult to write rules when project operations
    are unclear
  • First, develop operating goals
  • Resulting rules are not very complicated except
  • Exchange mechanism
  • Pumping priority and water rights
  • Multiple diversions from same object

19
RiverWare workspace
20
Operations Model
  • Analyze impacts on
  • Flow timing and magnitude
  • Reservoir storage
  • Minimum flows
  • Water quality

21
Water Quality
  • Total dissolved solids
  • Temperature
  • Dissolved oxygen
  • RiverWare?

22
Proposed approach
  • Determine project operations
  • Optimize project sizes and irrigated acreage
  • Run operations model
  • Verify project sizes and operations
  • Repeat steps 1 4 until project sizes and
    operations are finalized
  • Investigate hydrologic impacts
  • Investigate water quality impacts

23
Additional technical issues
  • Ungaged flow development
  • 50 years of daily data
  • Organizing model inputs, runs, and results
  • 4 Alternatives including No Action
  • 4 RiverWare models
  • 4 RiverWare rulesets
  • 3 Optimization models

24
Summary
  • Develop a water delivery system for the San
    Carlos Apache Tribe
  • Will use the following modeling tools
  • An optimization model to size projects and
    determine number of acres to irrigate
  • A RiverWare operations model to verify
    optimization and analyze impacts for an EIS/EIR