Title: PowerRailer Take the easy rail through SouthEast Europe'
1PowerRailer Take the easy rail through
South-East Europe.
2Contents.
- PowerRailer, the block-train system.
- The clever logistics solution.
- Definition, advantages.
- Train formation points, journey times.
- Block train connections.
- Transport sequence.
- Train parameters.
- Railog, the company.
3Everything in one train.
Grafik Format 12,7 x 13,1 cm Position 12,73 und
4,41 von oberer Ecke
- What is the fastest way to get your freight to
South-East Europe or from there to its final
destination? - The answer is PowerRailer, the clever logistics
solution.
4PowerRailer definition of a block train.
- Block trains
- provide a non-stop connection between the
departure and arrival terminal, - consist of at least 20 wagons,
- run according to fixed timetables,
- and run regularly.
- In 2006, within the PowerRailer system 2.5
million - tonnes of freight in 3725 block trains have been
- carried.
5PowerRailer the intelligent block train
system.
Grafik Format 12,7 x 13,1 cm Position 12,73 und
4,41 von oberer Ecke
- Simple
- Pre-haulage, transhipment, transport and
distribution as well as logistics services all
from one single source - Europe-wide
- Fixed connections
- From train formation points to the countries of
destination - Punctual
- Fixed timetables
- Short journey times
- High planning reliability
6Simply simple.
- Simple on rail Door-to-door handling
- Simply economical Competitive prices thanks to
bundling effects, synergies and attractive
purchasing conditions - Simply reliable Short, dependable transport
times ideal for just-in-time deliveries
- Simply secure Thanks to our own guards
- Simply well informedTracking-and-tracing system
- Simple logistics Door-to-door handling
- Simply ecological Low environmental impact
- Simply personalOur own staff in all countries of
destination
7PowerRailer train formation points, journey
times.
Average journey time to Belgrade (SRB) 2
days Skopje (MZ) 3 days Thessaloniki (GR) 4
days Athens (GR) 5 days Sofia (BG) 3
days Bucharest (RO) 3 days Istanbul (TR) 5
days Tehran (IR) 18 days Applies to all train
formation points Subject to change. This is
not valid as an agreed delivery date as specified
in CIM.
- Train formation points
- Sturovo (SK)
- Sopron (HU)
- Villach (A)
- Ljubljana / Zalog (SLO)
8PowerRailer block train connections.
Grafik Format 12,7 x 13,1 cm Position 12,73 und
4,41 von oberer Ecke
- Aufzählungspunkt
- Aufzählungspunkt
- Aufzählungspunkt
9PowerRailer for the whole of Europe.
10PowerRailer transport sequence. (1)
Connections to shipping routes are of course
possible
11PowerRailer transport sequence. (2)
1
2
3
4
Pre-haulageto consolidation point
Equipment consulting
Loading the wagons
Block trainformation
Railway/Forwarder
Forwarder
Customer
Railway A
All from one source.
5
6
7
Direct rail transport
Distribution to final customer
Block train is split up
Railway/Forwarder
Railway AD
Railway D
12PowerRailer freight structure.
- Mining
- Steel
- Coal
- Building materials, industrial and consumer goods
- Lime/plasterboard/slurry
- Railway construction materials
- Building materials
- Waste disposal
- Industrial and consumer goods
- Pulp paper
- Forestry agricultural products
- Chemicals/Mineral Oil/Fertilisers
- Mineral oil
- Liquid gas
- Chemicals and fertilisers
- Automotive
- Parts and components
- Finished vehicles
13The company all pulling in one direction.
14PowerRailer a product of the Railog Group.
Grafik Format 12,7 x 13,1 cm Position 12,73 und
4,41 von oberer Ecke
- Railog is a wholly-owned subsidiary of Schenker
AG and thus a member of the Deutsche Bahn Group - Global presence and regional expertise to tap
into new markets and secure crucial competitive
advantages - Can be combined with the entire logistics
services available from the Group - Blanket coverage branch offices in every country
in Europe
15Thank you for your attention.
SCHENKER RAILOG GmbH Taborstraße 95, 1200
Vienna Phone 43 1 3749390-370 Fax 43 1
374939-2 vienna_at_railog.net www.railog.net