This is a legislative requirement under Section 35 of the Mining ... Drilling (RAB, RC, DDH, Auger) Drill pads, sumps and tracks. Costeans. Camp establishment ... – PowerPoint PPT presentation

Number of Views:19
Avg rating:3.0/5.0
Slides: 20
Provided by: cho75
Category:
Tags: getting | started | auger

less

Transcript and Presenter's Notes

Title: GETTING STARTED


1
GETTING STARTED
  • Forms, Procedures and Guidelines
  • Application for Authorisation
  • Nomination of Operator
  • Authority to Deal with Agent

2
FORMS, PROCEDURES AND GUIDELINES
www.minerals.nt.gov.au/mineralsformsmining
3
FORMS, PROCEDURES AND GUIDELINES
www.minerals.nt.gov.au/mineralsformsmining
4
APPLICATION FOR AUTHORISATION
  • An Authorisation is required to carry out mining
    activities on a mining interest (title).
  • This is a legislative requirement under Section
    35 of the Mining Management Act.
  • The Department administers this Section of the
    Act through the Application for Authorisation.
  • The form must be signed and the original
    submitted to the Department.

5
NOMINATION OF OPERATOR
  • This form is required when the owner of a mining
    interest is not the operator for the mining site.
  • The appointment of an operator is a legislative
    requirement under Section 10 of the Mining
    Management Act.
  • If there is more than one title holder, each
    title holder should complete a Nomination of
    Operator form.
  • The form must be signed and the original
    submitted to the Department.

6
AUTHORITY TO DEAL WITH AGENT
  • This is a legal document that must be completed
    by both the Operator and the appointed Agent.
  • This confirms that the consultant is the Agent
    of the Operator and authorises DRDPIFR to deal
    directly with the Agent.
  • This Authority allows DRDPIFR to exchange and
    disclose information about the Operator with the
    Agent.
  • All information, requests or documents will be
    provided directly to the Agent, and the Operator
    must rely on the Agent to pass on the
    information.
  • Matters where DRDPIFR will deal exclusively with
    the Agent include all matters relating to mining
    activities under the Mining Management Act.
  • Matters where DRDPIFR will deal directly with
    the Operator, but may also provide correspondence
    with the Agent, includes directions to undertake
    actions on a mining site.

7
SMALL MMP
STRUCTURE GUIDE
  • When to use the Small MMP Structure Guide
  • Small MMP Template
  • Small MMP Contents

8
WHEN TO USE THE SMALL MMP STRUCTURE GUIDE
  • Exploration
  • Drilling (RAB, RC, DDH, Auger)
  • Drill pads, sumps and tracks
  • Costeans
  • Camp establishment
  • Grid lines
  • Extractive / Small Mine Operations
  • Dredging
  • Mining
  • Stockpiling
  • Sediment traps
  • Blasting

9
SMALL MMP TEMPLATE
  • Suggested template for exploration, extractive
    and small mining operations.
  • Template should be read in conjunction with the
    Small MMP Structure Guide.
  • Can be found on the Departments webpage under
    Forms, Procedures and Guidelines.

10
SMALL MMP CONTENTS
As per Section 40 of the Mining Management Act, a
mining management plan is to include the
following information and documents relevant to
the proposed mining activities to be carried out
on a mining site
  • the identification and description of the mining
    activities
  • particulars of the implementation of the
    management system to address environmental
    issues
  • a plan and costing of closure activities
  • particulars of the organisational structure
  • plans of current and proposed mine workings and
    infrastructure and other information or documents
    required by the Minister.

11
SMALL MMP CONTENTS
  • Introduction
  • Introduction to Key Aspects of the Project
  • Current Project Site Conditions
  • Environmental Management
  • Mine Closure and Rehabilitation / Exploration
    Rehabilitation
  • Performance Objectives
  • Proposed Activities
  • Current Site Conditions
  • Environmental Management
  • Rehabilitation Requirements

12
SMALL MMP CONTENTS
  • Proposed Activities
  • Exploration program
  • Type of exploration
  • Size and number of disturbances
  • Clearing and excavation activities
  • Machinery
  • Camp area required

13
SMALL MMP CONTENTS
  • Current Site Conditions
  • Land Area Type
  • Hydrology
  • Flora and Fauna
  • Current Land Use
  • Significant Sites

14
SMALL MMP CONTENTS
  • Environmental Management (2 Parts)
  • Environmental Management System (EMS)
  • Environmental Management Plan (EMP)

15
SMALL MMP CONTENTS
SMART S Specific M Measurable A
Achievable R Realistic T Timely
  • Environmental Management System
  • ISO140012004
  • Environmental Policy and Responsibilities
  • Identification of Environmental Aspects and
    Impacts
  • Objectives and Targets
  • Induction and Training
  • Aspects
  • Generation of dust
  • Camp establishment
  • Hydrocarbon spill
  • Construction of tracks
  • Vegetation clearing
  • Impacts
  • Respiratory problems
  • Loss of vegetation
  • Contamination of soil
  • Soil erosion
  • Loss of wildlife

16
SMALL MMP CONTENTS
  • Environmental Management System (cont.)
  • Consultation
  • Emergency Procedures and Incident Reporting
  • Environmental Audits and Inspections
  • Documentation

17
SMALL MMP CONTENTS
  • Environmental Management Plan
  • Water Management
  • Invasive Species Management
  • Flora and Fauna Management
  • Waste Management
  • Noise and Air Quality Management
  • Culture and Heritage Management

18
SMALL MMP CONTENTS
  • Rehabilitation Requirements
  • Status of current rehabilitation
  • Rehabilitation planning
  • Topsoil management
  • Revegetation methods
  • Fire management
  • Closure planning
  • Costing of closure activities

19