King Edward Hotel Redevelopment And Standard
Life Building Renovation
King Edward Hotel Revitalization Company LLC
September 23, 2008
Status Report
CONFIDENTIAL
2
David Watkins
  • President, Watkins Development LLC
  • Principal, Watkins Young PLLC

3
PARTIES INVOLVED IN THE PROJECT
  • Development Partners
  • HRI Properties (New Orleans)
  • David Watkins (Jackson)
  • Deuce McAllister (Jackson)
  • Leroy Walker (Jackson) (Standard Life only)

4
PROJECT COSTS
  • Total Development 123 million
  • King Edward 89 million
  • Standard Life 34 million
  • King Edward Project contractor is Clayco, Inc., a
    nationally-known, design-build construction firm
    using local subcontractors for all work on
    project
  • Standard Life contractor is White Construction

5
PROPOSED USES OF THE PROPERTY
  • Mixed-use Residential, Hotel and Retail with
    associated parking
  • Residential
  • Top 4 floors of the King Edward Hotel building
  • Approximately 56 Units 1 BR and 2 BR
  • Floors 3-18 of Standard Life Building
  • Approximately 64 units 1 BR and 2 BR
  • Potential of 12 additional units as alternate use
    of Annex buildings
  • Hotel King Edward
  • Hilton Gardens Inn flag with 186 rooms on floors
    3 through 8
  • Conference facilities located on the second floor
  • Hilton Evolution (luxury) FFE package for
    urban hotels (plasma TVs, etc)
  • Signature Bar and Restaurant
  • 2 swimming pools (one in basement one on rooftop)

6
PROPOSED USES OF THE PROPERTY
  • Retail
  • Approximately 3,000 square feet in KE and 3,400
    in Standard Life
  • Coffee shop and gift shop currently proposed in
    King Edward
  • Signature restaurant and bar in lobby of KE
  • Parking
  • renovation of existing garage use of Standard
    Life parking lot with possible expansion for low
    level parking garage
  • Greenspace
  • Interior courtyard with connected
    terraced/landscaped valet entrance from Capitol
    Street, additional exits at Roach and Pearl
    Streets

7
Economic Impact of Developments
  • Creates large number of new jobs
  • Generates substantial new school taxes, income
    taxes and sales taxes
  • Provides badly needed downtown living for new
    Jacksonians

8
Economic Impact of Developments
  • Key to removal of blight and stagnation in
    downtown Jackson area
  • Redevelopment of Standard Life is a vital
    component to assuring success of King Edward
    project
  • Overall development is important to create the
    critical mass needed to make the downtown
    development in the block viable and sustainable

9
King Edward Standard Life Direct 10-Year Fiscal
and Economic Impact
Private Investment 114.7 million
Economic Impact 343.9 million
Increased Personal Income 146.8 million
New Full Time Jobs created 293
Increased School Taxes 4.7 million
10
King EdwardHotel
11
Why the King Edward?
  • Symbolic of revitalization of downtown Jackson
  • Strategic importance to master development plan
    for City
  • Historic significance gives market value for
    restoration which a new structure on site would
    not have

12
King Edward Hotel
Capitol Street View
Summer, 2009
13
PHYSICAL REDEVELOPMENT PLAN
Site Plan
14
PHYSICAL REDEVELOPMENT PLAN
  • First Floor
  • Lobby
  • Registration
  • Restaurant
  • Bar
  • Coffee shop
  • Gift shop

15
PHYSICAL REDEVELOPMENT PLAN
  • Second Floor
  • Meeting rooms
  • Grand Ballroom
  • mezzanine/balcony . reopened

16
PHYSICAL REDEVELOPMENT PLAN
Typical Hotel Floor Plan Floors 3-8
17
PHYSICAL REDEVELOPMENT PLAN
Typical Apartment Floor Plan Floors 9-12
18
PHYSICAL REDEVELOPMENT PLAN
  • Rooftop Patio
  • Pool
  • Fitness Center
  • Entertainment . Area

19
Mill Street Farmers Market, Art Galleries and
Sidewalk Coffee Shop
20
MILL STREET VIADUCT IMPROVEMENT MARKET
21
Farmers Market Cafe
22
Standard Life
23
Action by City Council
  • This was NOT a loan by the City to Developers
  • JRA approved a deferral of 900,000 of the of the
    1,000,000 purchase price
  • Generally routine and minor deal point
  • However, JRA had given loan on property from
    Trustmark and the bank required City to back the
    loan
  • Thus, JRA, Trustmark and City all had to approve
    the simple deferral of the payment

24
Standard Life Apartments Master Site Plan
25
Standard Life Apartments Typical Floor Plan
(Floors 3 12)
26
Standard Life Apartments 17th Floor Plan
27
Project Vision and Development Concept
Standard Life Annex Buildings (Roach
Street) Retail/Restaurant or conversion to double
apartments (12)
28
Standard Life Apartments Rendering of
Apartment Interior 1
29
Standard Life Apartments Rendering of
Apartment Interior 2
30
Standard Life Redevelopment Status 9/23/2008
  • Work has begun on the Standard Life the
    interior demolition will begin in October with
    reconstruction shortly thereafter.
  • The project will be completed in December, 2009.
  • Plans have been refined to create 76 apartments
    unit including 50 1-bedroom units, 26 2-bedroom
    units and 2,600 square feet of ground floor
    retail.

31
Development Timetable
  • November, 2007 Phase II redevelopment
    construction of King Edward commenced
  • March 11 King Edward financial closing
  • Jan-May
  • Standard Life design work
  • Part 2 application,
  • selection of contractor
  • financial closing

32
Development Timetable
  • September, 2008 Standard Life to be begin
  • September, 2009 King Edward construction
    completion project grand opening
  • December, 2009 Standard Life completion

33
Capital Street Retail Development
34
Capital Street Retail Development
  • Development of properties near King Edward to
    enhance 24-7 living at King Edward and to augment
    the Farish Street entertainment development

35
Capitol Street Buildings
36
Capital Street Development Options
  • General commercial development
  • Retail space
  • Restaurants, coffee shops
  • Clubs, bars, pubs
  • Boutiques
  • Specialty shops
  • Business Incubator Project (Downtown Partners)

37
Farish Street Entertainment District
38
Farish Street Plan
39
Farish Street
40
(No Transcript)
41
Farish Street Plan
42
Farish Street
  • Entertainment, historic, tourist, cultural venue
  • Vision and Scope of project expanded
  • Emphasis on Culture, Music, Food and
  • TELLING THE STORY OF JACKSON MISSISSIPPI!
  • Note Beale Street in Memphis took twenty years
    to develop

43
PROJECT SUMMARY
  • Total Development Costs 52.5 million
  • New Jobs Created 680
  • Ten Year Revenue Impact 200 million
  • Projected Timetable
  • Commence Construction 90 days
  • Complete Construction of first block 12-16
    months
  • Complete Construction of second block 2010