CaliberRM - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

CaliberRM

Description:

Siemens was expecting that we would fix their perf problems in the 2006 release we did not. ... Ralf Wagner. indicate needs solved with CaliberRM 2006 ... – PowerPoint PPT presentation

Number of Views:127
Avg rating:3.0/5.0
Slides: 11
Provided by: support98
Category:
Tags: caliberrm | ralf

less

Transcript and Presenter's Notes

Title: CaliberRM


1
CaliberRM
  • Messaging to Siemens

Borland confidential
2
Background State of Siemens
  • Siemens was expecting that we would fix their
    perf problems in the 2006 release we did not.
  • Siemens is also expecting that we will be
    evolving the product in 2007 at the same pace as
    in 2006
  • Siemens is currently holding up deployment of
    2006 version (staying on R2 SP1) because of the
    concurrent perf issues.
  • They have about 10-20 power users that work
    concurrently.
  • They create about 1 baseline per hour.  Their
    baselines are large.
  • All their projects are on one server.
  • We cannot reproduce their issues in-house.  We do
    not have a copy of their database.  They have
    hired a 3rd party to help enable them to give us
    this.
  • Siemens has logged 11 issues with support (7 of
    which have also been filed by BT)
  • This has been building up to a crisis over time.

3
Background What Siemens Needs
  • Performance
  • Support large number of concurrent users
  • Requirements grid loading
  • Reporting (Document Factory and Datamart)
  • Backend
  • Versant is a black box DBAs cannot optimize
  • DB cannot be on UNIX server
  • Reporting
  • Better filtering
  • Easy way to report on changes
  • Requirement editor
  • Formatting not as good as Word
  • Data management
  • True baselines (snapshot where content does not
    change)

4
Summary of Messages to Siemens
  • A new release of Caliber just shipped
  • Provides a better requirements editor and
    formatting
  • We are scoping some enhancements like DocFactory
    in silent mode and notification of baseline
    creation
  • We expect these enhancements to be released XXX
  • We would like to explore some alternatives to
    improve performance
  • Borland consultant
  • Third-Party enhancements to Caliber
  • Other Issues like performance, data management
    and replacing Versant require significant
    architectural changes and we dont expect to
    finish this work in the 07 timeframe

5
Message 1
  • Band-aid fixes can be done by ltDATEgt
  • Make DocFactory work in a truly silent mode
  • Pop-up an information dialog to other users who
    are locked out during baseline creation
  • However, Borland does not expect to be able to
    fix the other performance issues with the
    CaliberRM current architecture

6
Message 2
  • Borland will help Siemens explore alternatives
    for current limitations, such as
  • Handle the deployment problems another way (eg
    split projects onto multiple servers, have
    DocFactory work on a backup system, archive
    purge inactive projects)
  • Bring in our black belt consultants or partners
    to analyze and suggest other solutions

7
Message 3
  • CaliberRM is entering maintenance mode
  • We do not expect any major enhancements to
    CaliberRM from this point on
  • We will retain RD resources to
  • Handle critical escalations
  • Certify new platforms based on customer demand
    (eg Microsoft Vista, Office 2007, etc)

8
Message 4
  • Borland is shifting resources to the next
    generation platform supporting Open ALM
  • Will incorporate RM capabilities and migration
    (TBD) from earlier solutions
  • Will be based on a high-performance architecture,
    supporting a large number of concurrent users,
    and a large number of requirement assets
  • Will support reporting across large data sets
  • Will provide a thin-web client for ease of
    deployment
  • Siemens CaliberRM requirements will be carried
    forward for consideration in the new platform
  • However, this next generation platform will not
    be delivered in 2007, and we cannot commit to a
    timeframe beyond that

9
Backup Slides
Borland confidential
10
Siemens Prioritized Needs
  • Raised to Tod Nielsen (Oct 20060 - Performance
    issues
  • Concurrent usage when running grid, SDK app and
    Doc Factory concurrently
  • Top 1 Traceability corrections/ enhancements
  • Top 1.1 - Version traces
  • Top 1.2 - Multi select on traces
  • Top 1.3 Filtering
  • Top 1.4 - UDA on links
  • Top 1.5 traceability displayed in grid
  • Top 2 Mathematical formula support in
    requirement text
  • Top 3 Inter and intra project cross-references
  • Top 4 Visibility in requirement changes (date
    filter)
  • Top 5 UDA deletion
  • Top 6 Individual project archive and restore
  • Top 7 Word-like requirement text editor
  • Top 8 Document Factory performance enhancements
  • Notes
  • Did participate in CaliberRM 2006 field test 

indicate needs solved with CaliberRM 2006
Write a Comment
User Comments (0)
About PowerShow.com