Consider three crucial areas that deserve heavy oversight focus ... the Refueling Water Tank overflowed while being refilled because Operators ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 19
Provided by: dletotalqu
Category:

less

Transcript and Presenter's Notes

Title: Rob De La Espriella DLE Total Quality Management, LLC


1
Rob De La EspriellaDLE Total Quality Management,
LLC
Risk-Based Oversight
In the Right Place at the Right Time
2
Goals for this Discussion
  • Consider three crucial areas that deserve heavy
    oversight focus
  • Understand the INPO model for RISK
  • Explore methods to use Risk to shape the conduct
    of oversight at the plants

3
Oversight Focus Areas
  • Nuclear Safety
  • Plant Reliability
  • Risk Significant Activities

4
Oversight Focus Areas
  • Nuclear Safety
  • RCS Pressure Boundary
  • SSCs required to mitigate the consequences of an
    accident
  • SSCs required to shutdown and maintain the plant
    in a safe condition

5
Oversight Focus Areas
  • Plant Reliability
  • Processes and Procedures That Support Equipment
    Reliability
  • Plant Health Committees
  • System Health Reports
  • Maintenance Rule
  • Work Management Process
  • Outage Management
  • PM Optimization
  • Critical Spare Parts Program

6
Oversight Focus Areas
  • Risk Significant Activities
  • INPO Model
  • Risk Probability Consequences
  • of an event of an event
  • (Error Rate) (Defense
    in Depth)

7
Oversight Focus Areas
  • Risk Significant Activities
  • Error rates are largely governed by
  • Work Preparation
  • Work Performance
  • Work Feedback

8
Oversight Focus Areas
  • Risk Significant Activities
  • Defense-in-Depth consists largely of
  • Engineered Controls
  • Administrative Controls
  • Oversight Controls

9
Oversight Focus Areas
  • Risk Significant Activities
  • To Properly Focus Oversight
  • The key is to focus on CRITICAL TASKS for areas
    that pose risk to plant equipment, plant
    personnel or the public.
  • The highest risk activities should be provided
    oversight on a daily basis.
  • In simple terms strive to be at the right place
    at the right time!

10
Risk-Based Oversight
  • The following are examples of Critical Tasks that
    should be evaluated
  • to reduce error rates in the area of
  • Nuclear Safety
  • Operations
  • Conservative Decision Making
  • Use of On-Line Risk Monitors/Shutdown Safety
    Assessments
  • Involvement in Work Management Equipment
    Reliability
  • Design Controls
  • Configuration Management
  • Operational Margin
  • GL 91-18 Evaluations
  • Safeguards Testing
  • Equipment Reliability
  • System Health Reports
  • Maintenance Rule Program
  • On-site / Offsite Safety Review Committees

11
Risk-Based Oversight
  • The following are examples of Critical Tasks that
    should be evaluated
  • to reduce error rates in the area of
  • Plant Reliability
  • Work Management
  • Daily Scheduling Planning
  • Outage Scheduling Planning
  • Metrics Process Improvements
  • Maintenance
  • Tagging
  • Corrective Maintenance
  • Elective Maintenance
  • On-line Maintenance (CMMs)
  • Predictive Maintenance
  • Preventative Maintenance
  • Maintenance Modifications

12
Risk-Based Oversight
  • The following are examples of Critical Tasks that
    should be evaluated
  • to reduce error rates in the area of
  • Plant Reliability
  • Corrective Action Program
  • Problem identification
  • Problem resolution
  • Self-Assessments
  • Significant Events/Root Causes
  • Chemistry Controls
  • Primary (SG tubes)
  • Secondary (e.g. Secondary Pipe Walls)
  • ODCM controls

13
Risk-Based Oversight
  • Examples of Programs/Activities to evaluate on a
    continual basis because they protect
  • plant equipment/personnel/public from
  • Risk
  • Industrial Safety
  • Human Performance Program
  • Radiological Protection Program
  • Reactivity Management Program
  • Boric Acid Corrosion Controls
  • Training and Qualification Programs
  • Emergency Preparedness Program
  • Fire Protection Program
  • Security

14
Risk-Based Oversight
  • Examples of reports to review on a frequent
    basis because they provide insights on
  • Risk
  • Operating logs
  • Daily Status Reports
  • Configuration Risk Management Programs
  • Shutdown Safety Assessments
  • The Top Ten Equipment Issues list for the station
  • The list of Operator Work-Arounds and Burdens
  • The list of control room deficiencies
  • The list of Maintenance Rule systems in a(1)
    status
  • The list of RED System Health Reports
  • The list of PWOs that are keeping M-Rule systems
    in Yellow or Red

15
Risk-Based Oversight
  • Daily Routines
  • Oversight should provide real-time
    oversight/evaluations of daily activities that
    pose a risk to the station or the public.
  • Surveillances, assessments and audits should be
    flexible enough to accommodate oversight of high
    risk activities.
  • Individual risk as well as the aggregate risks of
    an activity should be assessed, as other plant
    conditions may add to the risk. (For example, at
    one station, the Refueling Water Tank overflowed
    while being refilled because Operators did not
    consider that the high level alarms were out of
    service.)
  • Oversight should also be evaluating whether the
    line organization understands which are the
    critical tasks, and whether the right human
    performance tools are being applied to minimize
    risk.

16
Take-Aways
  • Evaluate whether your oversight organization
    is considering risk in its daily routine
  • Ask line management if oversight is usually at
    the right place at the right time.
  • Ask oversight management how Risk is factored
    into their surveillance and audit programs.
  • If the answers point to an organization that
    is not providing sufficient oversight of risk
    significant activities, its time to explore
    different oversight models.

17
Summary
To get more value from your oversight
organizations, ensure the surveillance and audit
programs are taking into account what is going on
at the stations, such that they can place
themselves at the right place at the right time.
The INPO Risk model can be used as a guide to
help minimize the risk of certain activities to
the station and the public. Oversight should be
looking frequently at what is scheduled at the
plants, evaluate the relative risk of those
activities, and, given an understanding of the
risks, establishing a proactive oversight plan or
making adjustments to existing plans to provide
oversight of Critical Tasks associated with those
activities.
18
DLE Total Quality Management (a Limited
Liability Company)
Contact Information
For more information on Risk-Based Oversight,
please contact Rob De La Espriella at
4634 SW Long Bay DrivePalm City, FL 34990Office
No. (772)419-8555Fax No. (866)271-5199Cell
No. (772)341-1093Email robdelae_at_adelphia.net
Rob De La EspriellaPresident
Write a Comment
User Comments (0)
About PowerShow.com