1Rob De La EspriellaDLE Total Quality Management,
LLC
Risk-Based Oversight
In the Right Place at the Right Time
2Goals for this Discussion
- Consider three crucial areas that deserve heavy
oversight focus - Understand the INPO model for RISK
- Explore methods to use Risk to shape the conduct
of oversight at the plants
3Oversight Focus Areas
- Nuclear Safety
- Plant Reliability
- Risk Significant Activities
4Oversight Focus Areas
- Nuclear Safety
- RCS Pressure Boundary
- SSCs required to mitigate the consequences of an
accident - SSCs required to shutdown and maintain the plant
in a safe condition
5Oversight Focus Areas
- Plant Reliability
- Processes and Procedures That Support Equipment
Reliability - Plant Health Committees
- System Health Reports
- Maintenance Rule
- Work Management Process
- Outage Management
- PM Optimization
- Critical Spare Parts Program
6Oversight Focus Areas
- Risk Significant Activities
- INPO Model
- Risk Probability Consequences
- of an event of an event
- (Error Rate) (Defense
in Depth)
7Oversight Focus Areas
- Risk Significant Activities
- Error rates are largely governed by
- Work Preparation
- Work Performance
- Work Feedback
8Oversight Focus Areas
- Risk Significant Activities
- Defense-in-Depth consists largely of
- Engineered Controls
- Administrative Controls
- Oversight Controls
9Oversight Focus Areas
- Risk Significant Activities
- To Properly Focus Oversight
- The key is to focus on CRITICAL TASKS for areas
that pose risk to plant equipment, plant
personnel or the public. - The highest risk activities should be provided
oversight on a daily basis. - In simple terms strive to be at the right place
at the right time!
10Risk-Based Oversight
- The following are examples of Critical Tasks that
should be evaluated - to reduce error rates in the area of
- Nuclear Safety
- Operations
- Conservative Decision Making
- Use of On-Line Risk Monitors/Shutdown Safety
Assessments - Involvement in Work Management Equipment
Reliability - Design Controls
- Configuration Management
- Operational Margin
- GL 91-18 Evaluations
- Safeguards Testing
- Equipment Reliability
- System Health Reports
- Maintenance Rule Program
- On-site / Offsite Safety Review Committees
11Risk-Based Oversight
- The following are examples of Critical Tasks that
should be evaluated - to reduce error rates in the area of
- Plant Reliability
- Work Management
- Daily Scheduling Planning
- Outage Scheduling Planning
- Metrics Process Improvements
- Maintenance
- Tagging
- Corrective Maintenance
- Elective Maintenance
- On-line Maintenance (CMMs)
- Predictive Maintenance
- Preventative Maintenance
- Maintenance Modifications
12Risk-Based Oversight
- The following are examples of Critical Tasks that
should be evaluated - to reduce error rates in the area of
- Plant Reliability
- Corrective Action Program
- Problem identification
- Problem resolution
- Self-Assessments
- Significant Events/Root Causes
- Chemistry Controls
- Primary (SG tubes)
- Secondary (e.g. Secondary Pipe Walls)
- ODCM controls
13Risk-Based Oversight
- Examples of Programs/Activities to evaluate on a
continual basis because they protect - plant equipment/personnel/public from
- Risk
- Industrial Safety
- Human Performance Program
- Radiological Protection Program
- Reactivity Management Program
- Boric Acid Corrosion Controls
- Training and Qualification Programs
- Emergency Preparedness Program
- Fire Protection Program
- Security
14Risk-Based Oversight
- Examples of reports to review on a frequent
basis because they provide insights on - Risk
- Operating logs
- Daily Status Reports
- Configuration Risk Management Programs
- Shutdown Safety Assessments
- The Top Ten Equipment Issues list for the station
- The list of Operator Work-Arounds and Burdens
- The list of control room deficiencies
- The list of Maintenance Rule systems in a(1)
status - The list of RED System Health Reports
- The list of PWOs that are keeping M-Rule systems
in Yellow or Red
15Risk-Based Oversight
- Daily Routines
- Oversight should provide real-time
oversight/evaluations of daily activities that
pose a risk to the station or the public. - Surveillances, assessments and audits should be
flexible enough to accommodate oversight of high
risk activities. - Individual risk as well as the aggregate risks of
an activity should be assessed, as other plant
conditions may add to the risk. (For example, at
one station, the Refueling Water Tank overflowed
while being refilled because Operators did not
consider that the high level alarms were out of
service.) - Oversight should also be evaluating whether the
line organization understands which are the
critical tasks, and whether the right human
performance tools are being applied to minimize
risk.
16Take-Aways
- Evaluate whether your oversight organization
is considering risk in its daily routine - Ask line management if oversight is usually at
the right place at the right time. - Ask oversight management how Risk is factored
into their surveillance and audit programs. - If the answers point to an organization that
is not providing sufficient oversight of risk
significant activities, its time to explore
different oversight models.
17Summary
To get more value from your oversight
organizations, ensure the surveillance and audit
programs are taking into account what is going on
at the stations, such that they can place
themselves at the right place at the right time.
The INPO Risk model can be used as a guide to
help minimize the risk of certain activities to
the station and the public. Oversight should be
looking frequently at what is scheduled at the
plants, evaluate the relative risk of those
activities, and, given an understanding of the
risks, establishing a proactive oversight plan or
making adjustments to existing plans to provide
oversight of Critical Tasks associated with those
activities.
18DLE Total Quality Management (a Limited
Liability Company)
Contact Information
For more information on Risk-Based Oversight,
please contact Rob De La Espriella at
4634 SW Long Bay DrivePalm City, FL 34990Office
No. (772)419-8555Fax No. (866)271-5199Cell
No. (772)341-1093Email robdelae_at_adelphia.net
Rob De La EspriellaPresident