Title: Skyland Church Harvest Festival Booth Raising
1Skyland Church Harvest Festival Booth Raising
16'
20'
12 X 30 Canopy
Toys, games sporting goods
16'
Kitchen Stuff
Clothes
Arts crafts
Booth
Booth
16'
16'
12'
12'
Plants
Booth
12'
20'
Open
Booth
14'
- 1. Layout the booths in accordance with the plan
view - 2. Stake the corners
12'
12'
anchor oak
10'
Produce
Canopy Instructions
3. Assemble 12 X 30 Canopy per manufacturers
instructions
2Lowered Assembly Top View
4. Attach 2 side panels to 3 8-ft 2X4 posts
using 2-inch screws.
side panels
35. Attach correct length side stringer (per plan
view) to 2X4 posts using 3-inch screws. 6.
Attach panel to panel connectors to front and
rear of side panel assembly using 1.5-inch screws.
2 ft
side panel
Side Stringer
Panel to panel connectors
side panel
2 X 4 posts
Lowered Assembly Top View
Panel to panel connector
4Left side panel
Right side panel
Front and rear stringers
Left side panel
7. Raise first side panel assembly and attach to
anchor oak.
Raised Assembly Top View
9. Connect left and right panel assemblies using
correct length front and rear stringers (per plan
view). Drop hole in end of each stringer onto
panel to panel connector bolt.
Front stringer
rear stringer
Right side panel
8. Raise second side panel assembly.
5Side Stringer
Panel to panel connector
2 X 4 posts
side panel
More Side panel assemblies
side panel
side panel
6shelf end support
shelf end supports
Brace - 2 reqd
10. Attach upper and lower shelves to shelf end
supports using 2.5 screws or 8d double-headed
nails. Attach 2 braces using 2 screws. Arrange
shelf assemblies in a U-shaped pattern in the
booths.
Upper shelf
Brace - 2 reqd
Lower shelf
Produce section shelf end supports
shelf end support 2 reqd
73. Toys, games sporting goods
4. Clothes
11. Add extra top stringers to support
tarps. Attach latticework panels to front of
booths.
2.Kitchen Stuff
5.Arts crafts
6. Open
1. Plants