2Events since Port Jeff
- LTVAC formed at Port Jeff (10/25/06)
- Executive Committee (10/31/06)
- LTV lab-LARP parity, LARP focus on juniors
- US-CERN meeting (11/13/06)
- PJAS status to LTV ? to be further investigated
- 5-yr plan and new tasks prioritization
- DoE mini-Review in Dec06
- it is clear that LARP is developing
exceedingly well, and its managers and membership
should be congratulated for their outstanding
progress and achievements - FY07 CR troubles (RHIC Run 7 off/on Mar07)
- FY07 semi-annual report to DoE (03/25/07)
3Accelerator Systems Budget
2304k out of 3611k64 half-way thru
FY07 Instrum 77 Commiss 64 Collimat
54 Physics 48
4This meeting and beyond
- At the meeting we are to hear (among all) about
financial issues and needs of all the tasks - LARP AS contingency 200k - to be distributed
after the meeting - Initial planning for FY08 to take place at the
meeting - Input on hard deliverable schedules
- LTVAC, L2 tasks
- New initiatives
- To be finalized after the meeting
- gang of 51
- exec committee
- DoE Review June 5-6 at FNAL
5Instrumentation Schottky
4 tanks installed at Point 4 of LHC, baked,
vacuum tested Electronics shipped to CERN US
team at CERN to commission in May
6Instrumentation TuneCoupling FB
Success at RHIC and Tevatron
Success at SPS
Apr06
Oct06
Oct06 successful Final Design Review of at
BNL Now LHC system test at RHIC, Q, later LHC
450 GeV eng run
7Instrumentation Luminosity Monitors
LUMI Prototype to be compared to RHIC ZDC
Two LUMINOSITY detectors under construction
Now RHIC Run 7 with gold to test of complete
system Later integration at LHC
8Collimation Rotating Collimators
Significant design improvement
200mm Cu mandrel w/ coil after brazing
200mm collimator brazed
960 mm Cu mandrel
will hear more progress at the meeting
9Physics BBLR wires ready for RHIC test
2 wires installed in RHIC Yellow and Blue rings
Now wire commissioning and experiments Code
benchmarking
10Commissioning
- 5 hardware commissioners now at CERN
- LTVAC identified / qualified LARP members from
Accel Systems to spend gt3 mos. at LHC - All labs, incl. CERN, represented
- All areas of Accel Sys represented
- At the Collab Mtg
- Endorsements plans, remainder of FY07
- Provide recommendations (first pass) for travels
in FY08 to L0/L1 - Visit LHC_at_FNAL (opened in Feb) !
11LHC_at_FNAL
12LARP AS Focus on Junior Physicists
- They are active in all tasks
- Rama Calaga (Toohig Fellow), Mei Bai (Commiss.),
Guillaume Robert-Demolaize (Collim. , 1/2 by
RHIC), Natalia Prado de Abreu (Physics, 1/2 by
RHIC), Yun Luo (Commiss) at BNL - Ryoichi Miyamoto (AC dipole), Andreas Jansson
(Schottky), H.J.Kim (IR), Arden Warner (Commiss)
- at Fermilab - Jean-Francois Beche (Lumi) at Berkeley
- We are actively looking for new ones
- Toohig Fellows
- 1 Research Associate for Lumi (Wainer Vandelli,
Piza) - 1 RA for Rotating Collimator (Javier Resta Lopez)
- 2 from SLAC to take part in commissioning
13Collaboration/Coordination with CERN
- Remarkable progress in 2006
- closer contacts established
- driving forces on both sides model
- Luminosity monitors A.RATTI and R.JONES
- Schottky detectors R.PASQUINELLI and F.CASPERS
- Tune Coupling FB P.CAMERON and R.JONES
- AC Dipole S.KOPP and
H.SCHMICKLER - HW Commissioning M.LAMM and R.BAILEY
- Beam Commissioning M.SYPHERS and M.LAMONT
- Collimation T.MARKIEWICZ
R.ASSMANN
14Collaboration with CERN in FY07
- Better coordination of all activities in FY07
- H.Schmickler/AB in LARP LTV Advisory Committee
- O.Bruning/AB to be liaison to LARP IR,e-cloud
work - J.P.Koutchouk/AT to be liaison to LARP beam-beam
compensation projects (long-range head-on
lenses) - More collaborative work
- Even more visible LARP presence at CERN for
- Installation and commissioning of LARP
instruments - Participation in the next round of SPS studies
- 2 more Hardware/IR Commissioners to come
- First LARP Beam Commissioners - later in 2007
- Joint eCloud Clearing workshop _at_CERN (Mar07)
- Joint LHC beam-beamIR workshop at SLAC, Jun07
- Orgd by A.Chao W.Fischer to review
experiments simulations
15FY07 AS Priorities Goals
- Lumi-Monitors construct, install, start
commissioning - TuneCoupling FB deliver design, participate in
installation and commissioning - Schottky participate in installation and
commissioning - Hardware Commissioning execute the plan (5-7
people) - Beam Commissioning develop detailed Long Term
Visitors TV plan for FY08 by mid-FY07 - Other tasks execute Task Sheets Plans
- 51 develop FY08 plan (incl. new tasks) by
June07
Hard Deliverable
Hard Deliverable
Hard Deliverable
16This Meeting
- This is large meeting to address
- Plan execution, achieved milestones, finances
- Expected schedule/cost changes in FY07
- Plans for FY08 and beyond
- It is the meeting to report/discuss
- Technical achievements, in detail
- Difficulties of any kind
- Status of collaboration affairs (US labs, CERN)
- Very important
- Open discussion of new proposals (Thur PM)
- Welcome new people joining us
- from SLAC
- from various Fermilab groups
17New Initiatives
- Collider Instrumentation
- BBQ-based Quadrupole Monitor
- Synch light based diagnostics
- Physics
- LHC Crystal Collimation Scheme
- LHC Electron Lenses
- Modeling of LLRF Limitations on LHC Performance
- LHC Injectors
- The Low-Energy Transverse Emittance Project
- Super-Ferric Fast Cycling Injector in the SPS
Tunnel - LHC injectors Upgrades, space-charge effects
18Consideration Process
- Group of 51 to meet right after to recommend
on support of proposals - General requirements
- Interesting subject, development should push up
the state of the accelerator physics and
technology in the US - Of interest for LHC
- Collaboration of gt1 Lab, Universities welcome
- Not at expense of current unfinished tasks
- Right time and budget scale
- Final approval by LARP Executive Committee
19Summary
- Remarkable progress since last LARP meeting
- Instrumentation tasks, Hardware commissioning
- Rotating collimator design, Beam-beam wires, etc
- Greatly improved LARP-CERN communication
- Priorities in FY07
- instrumentation tasks,
- commissioning
- LTV Advisory Committee started
- focus on junior researchers
20Back up slides
21AP New Proposals vs Existing Tasks
- Electron cloud (200k/yr)
- very high priority for the LHC, a lot of interest
from US projects, now attacking e-p interaction
simulations (new territory) - IR Optics and Beam-Beam Simulations (270k/yr)
- Making important contribution to LHC Upgrade work
(12 talks in Valencia), plugs US into the LHC
Upgrade consideration process as a pratner,
develops software tools of particular importance
for the LHC and generic importance for US
colliders (beam-beam lifetime) - Beam-beam wires (150k/yr)
- Very positive development at CERN (there will be
wires, space reserved), effective CERN-LARP
collaboration, experiment at RHIC greatly
enhances advanced accelerator RD in the US,
little funds after FY07
22Instrumentation Tasks in FY07 and FY08
- Schottky Luminosity Monitors, Tune Feedback
- Are or will be constructed and installed in FY07
- LARP will support their commissioning (via
Commissioning task) in FY07 and in larger
scale - in FY08 (including 450 GeV run) - AC Dipole
- Just started, significant design progress
expected in FY07 ? will determine funds needed in
FY08 - Being discussed
- Longitudinal Density Monitors, Crab Cavities, ODR
monitors - Funds in FY08 will depend on situation with
higher priority tasks, e.g., commissioning of
existing instruments (TBD after collaboration
meeting in April07)
23New Physics Initiatives
- Crystal Collimator (50k 1st year)
- waiting for Tevatron results with new bent
crystal, not much encouragement from CERN,
competes with Rotating Collimator for Phase II - Superferric LER or (S)PS (100k 1st yr)
- LER is dead, Super Ferric (S)PS m.b.
considered later depends on CERN plans, no
strong inter-Lab team in the US - Hollow electron beam as proton/ion primary
collimator (50-100k 1st year) - Some interest at CERN, initial considerations to
take place in FY07 ? technical considerations
possible - Electron lens for beam-beam compensation
- (300 k 1st yr, 600 k/yr x 4 yrs)
- Preparatory theory work not done, some limited
interest at CERN, working collaboration may be
formed in FY07 - encouraging TEL results (doubles p-lifetime)
- NB before funding other things, we need complete
current commitments (Instruments) as the highest
priority
24LHC Software at Fermilab (LAFS)
- Motivation make vast Tevatron accelerator
controls experience available to the LHC
operation team - Goal to develop a suite of software products to
enable Fermilab accelerator physicists to make
key contributions to the beam commissioning of
the LHC - A modest team (3-5 FTEs or 10 people) of
computer professionals, operational experts, and
accelerator physicists to make a substantial
contribution to the LHC - LAFS is part of LHC_at_FNAL
- Head D.McGinnis reports to E.Gottschalk
- Three groups
- RBA (Role Based Access) S.Gysin
- Sequencer J.Patrick
- SDA Sequenced Data Acquisition E.McCrory
- Collaborative agreement FNAL/CERN is signed by
S.Holmes (last week) ? now at CERN - Relationship to LARP
- Complementary
- LARP input via LHC_at_FNAL Integration Task Force
LHC subgroup