T E L E M A C TELEMonitoring and Advanced teleControl of high yield wastewater treatment plants' Pro - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

T E L E M A C TELEMonitoring and Advanced teleControl of high yield wastewater treatment plants' Pro

Description:

Provide a series of validated models for. Ordinary working ... Action list WP1-6 : R.Farina. 2nd meeting, Santiago 17th-18th of December. Open questions ... – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 21
Provided by: ober5
Category:

less

Transcript and Presenter's Notes

Title: T E L E M A C TELEMonitoring and Advanced teleControl of high yield wastewater treatment plants' Pro


1
T
E
L
E
M
A
C
WP 3 Advanced control
O.BernardINRIA Sophia
2
Objectives of WP3
  • Provide a series of validated models for
  • Ordinary working conditions
  • Process failures
  • Process start-up.

3
Planning of WP3
4
General presentation of WP3 during the 3 first
months
  •       
  • WP3.1 Process modelling with respect
  • to the process working mode
  • Participants INRIA 9.5, LEMAIRE 2, UDG 6.5

5
WP3.1 Model specification
  • The NORMAL models can be used to
  • regulate the COD under a maximum value
    depollution
  • regulate the ratio qM/qC cogeneration
  • regulate the ratio VFA/Tot. Alkalinity
    stability
  • verify that the process is working well, that
    the VFA are not accumulating and especially that
    no propionate is present. monitoring

6
WP3.1 Model specification
  • ? The models must be able to predict
  • the methane and CO2 flow rates.
  • the VFA
  • one of the models must be able to deal with
    propionate.

7
WP3.1 Model specification
  • The ABNORMAL models can be used to
  • base a controller which will make the system go
    back to normal working recover
  • monitor accurately the system close monitoring

8
WP3.1 Process modelling.
  • Review the existing models in the literature

? The model designed during AMOCO was
validated 4 years ago
9
WP3.1 Process modelling
  • Test 4 years later on new data from INRA

model
model
10
WP3.1 Process modelling
  • Test 4 years later on new data from INRA

model
time
11
WP3.1 Process modelling
We want a set of (10) models
AMOCO
12
Model extension
  • Initial hypothesis 6? pH?8

? Now the chemical equations are valid for any
pH!
13
(No Transcript)
14
(No Transcript)
15
Model simplification for normal working mode
  • No biomass inhibition
  • Biomass evolution is slow

16
(No Transcript)
17
(No Transcript)
18
Questions
?
  • UASB
  • CSTR

19
Open questions
  • Number of reasonable failures to represent in the
    models ??

? WP1.1 Lemaire Allied Domecq
? Action list WP1-6 R.Farina
20
Open questions
  • Number of possible process architectures 4 ?