Title: Critical Access Hospital Physical Plant


1
Critical Access HospitalPhysical Plant
EnvironmentLife Safety Code Survey(LSC)

  • Henry Kowalenko
  • Design Standards Unit
  • Division of Health Care Facilities and Programs
  • March 18, 2009

2
Rules and Regulations
  • The following rules and regulations are used when
    surveying a facility.
  • Illinois Hospital Licensing Requirements, 77
    IL Admin Code 250
  • Center for Medicare and Medicaid Services (CMS)
  • CFR 485.623d Standard Life Safety from Fire
  • National Fire Protection Association - NFPA 101
    Life Safety Code (2000 Edition)
  • Chapter 18, New Healthcare Occupancies
  • Chapter 19, Existing Healthcare Occupancies
  • Illinois Plumbing Code - 225 ILCS 320 February
    , 2004
  • Illinois Accessibility Code - 71 Illinois Admin
    Code 400

3
LSC Survey Process
  • The Department inspector will be escorted on a
    tour of the facility. The following items should
    be available
  • Keys to all areas
  • Ladder
  • Flashlight
  • Small floor plan which indicate
  • Fire barriers and ratings
  • Suite designations
  • Exits

4
LSC Survey Process
  • The inspector will conduct a review of the
    following documentation
  • Fire drills records
  • Fire alarm testing
  • Emergency generator testing
  • Kitchen hood suppression systems
  • Fire extinguishers annual testing and maintenance
  • Written fire and emergency policy and procedures
  • Interior finish ratings
  • History of each building to include
  • Construction dates
  • Type of occupancy
  • Construction type

5
LSC Survey Process
  • During the inspection, the fire alarm and
    sprinkler systems will be tested.
  • Fire alarm system this is a test and not a
    drill. Staff response is not necessary.
  • Pull Stations
  • Key will need to be available to reset
  • Smoke detectors
  • Functional test (no magnets), Canned smoke is
    required
  • Water flows tamper valves (if sprinklered)
  • Verify water flow activation within 90 seconds
  • Inspector test pipe to a location than can accept
    full flow

6
LSC Survey Process
  • During the exit interview, the inspector will
  • identify the deficiencies found
  • inform the Provider of the CMS survey process
  • answer questions
  • The survey is not all inclusive and represents a
    sample of findings. The Provider is responsible
    for compliance with all applicable codes.

7
LSC Survey Process
  • The Provider will receive a Statement of
    Deficiencies and Plan of Correction (SoD/PoC),
    CMS 2567 form. This form is sent to the Provider
    by certified mail within 15 calendar days of
    survey exit date.
  • Call IDPH for clarification if the deficiency is
    unclear, you have questions or you need an
    extension to file the POC.
  • The Provider must use the forms provided to
    submit their Plan of Correction (PoC)

8
LSC Survey Process
  • The Plan of Correction must
  • Clearly identify what will be done to correct the
    deficiency
  • Indicate who is responsible for the corrective
    action
  • No proper names
  • Completion dates must be reasonable and formatted
    as mm/dd/yy
  • If the corrective action requires a number of
    steps, identify the steps and when they will be
    completed.
  • Example
  • Obtain consultant Date
  • Review solutions Date
  • Bid work Date
  • Start work Date
  • Work complete Date

9
LSC Survey Process
  • Plan of Correction (PoC)
  • The PoC should be submitted to the IDPH within 10
    days of receipt of the SoD.
  • If the PoC is deemed acceptable and all
    deficiencies will be corrected within 45 calendar
    days a LSC survey is scheduled, the corrections
    verified and the survey is cleared.
  • If the PoC is deemed acceptable and received in a
    timely manner, however, the corrections will not
    be completed by the 55th day, a termination date
    will be established and the Provider notified.
    IDPH monitoring survey schedule will be
    established.

10
LSC Survey Process
  • If the PoC is received in a timely manner and is
    deemed unacceptable, CMS will notify the Provider
    of a termination date and request the Provider to
    submit an acceptable PoC.
  • If the PoC is not submitted in a timely manner,
    IDPH will notify CMS that we are unable to
    receive a PoC. CMS will establish a termination
    date and request the PoC from the Provider.

11
LSC Survey Process
  • Monitoring surveys are unannounced.
  • When monitoring surveys are conducted, it will be
    necessary to provide the same equipment and
    material as the original survey.
  • Monitoring surveys are focused on the areas of
    previously identified deficiencies.
  • Additional deficiencies can be cited
  • If deficiencies are not corrected or new
    deficiencies are cited, a revised SoD will be
    issued to the Provider and a revised PoC will be
    requested.
  • The termination date may be adjusted.

12
LSC Survey Process
  • Fire Safety Evaluation System (FSES) NFPA 101A
    (2001 Edition)
  • FSES may be used when prescriptive compliance
    cannot be achieved.
  • The FSES is based on a point system.
  • The Authority Having Jurisdiction must concur
    that the FSES is reasonable.

13
LSC Survey Process
  • When all deficiencies are corrected and no new
    deficiencies are cited, IDPH will forward the
    documentation to CMS to clear the survey.
  • CMS will issue a letter indicating the
    termination has been rescinded.

14
Design Standards Unit Staff
  • Henry Kowalenko, Supervisor
  • Jody Gudgel, Administrative Assistant
  • Stephanie Lane, Office Associate
  • Architects
  • Lynn Manley
  • Thomas Busse
  • William Bender
  • Laura Cramer
  • Engineers
  • Justin Dammerman
  • Don Hall
  • Project Designers
  • Pam Hastings
  • Theresa (Tess) Jimenez

15
Contact Us
  • Design Standards Unit
  • 525 West Jefferson Street, 4th Floor
  • Springfield, IL 62761
  • 217-785-4264 Phone
  • 217-782-0382 Fax
  • dph.design.standards_at_illinois.gov (for general
    information)

16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
(No Transcript)
22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
25
LSC Survey Process
  • ??? QUESTIONS ???