WORK SPECIFICATION FOR
FOR GUNITING
By KHAIRUNISA BINTI KHAIRUDDIN AB
03011 DIPLOMA OF CIVIL ENGINEERING
LECTURER Ir.PROF.MADYA. ADNAN BIN ZULKIPLE
3
Continue.
NORMAL GUNITING PROCEDURE
REBOUND
CONSTRUCTION JOINTS
WORKS TEST PANELS
WEEP HOLES
QUALITY CONTROL
4
NORMAL GUNITING PROCEDURE
5
  • Before starting work, the contractor shall submit
    to the engineer for approval a detailed schedule
    of the entire guniting and method statement of
    works.
  • Guides shall be set-up to establish good finish
    surfaces.
  • Daily site records off all materials delivered to
    the concrete mixer shall be properly maintained
    and made available to the engineer required.
  • All gunite shall be cured continously for 7 days
    or by approved curing compound or equivalent.

6
REBOUND
7
  • All rebound and loose materials shall be
    removed by air jets or other means from the
    surface of each layer as work proceeds.
  • Rebound shall not be worked into the sprayed
    area or re-used in the works.
  • All surfaces which are not to receive gunite
    shall be protected by approved methods.

8
CONSTRUCTION JOINTS
9
  • The type and positions of all construction joints
    shall be approved by the engineer.
  • Construction joints shall be formed by placing
    or trimming the sprayed gunite layer to an angle
    of approximately 300.

10
WORKS TEST PANELS
11
  • During the progress of the works, the contractor
    shall provide at least three moulds for
    reinforced test panels of size
  • 750mm x 750mm x 100mm thick, rigidly fixed
    alongside the works at locations as required by
    the engineer.
  • The moulds shall be sprayed at such time from
    such concrete batches and by such personnel as
    the engineer may direct.
  • The test panels shall be stored and cured
    alongside the gunite works and under similar
    conditions.

12
WEEP HOLES
13
  • Before starting works, the Contractor shall
    submit to the engineer for approval a detailed
    proposal for the construction of weep holes.
  • The location and spacing of weep holes shall be
    clearly indicated .

14
QUALITY CONTROL
15
  • Method Statement
  • ?The contractor shall submit method statement of
    works to the engineer for approval before
    mobilization.
  • ?The method statement shall contain details of
    material of specified quality, machines of
    specific model and capacity, operator and
    technician and his CV plus the estimated daily
    output to ensure the works can be completed
    within the scheduled work programme required .
  • ?Method statement shall be prepared by
    experienced engineer who has extensive and
    intensive working experience and also is
    knowledgeable about the characteristic, capacity
    and efficiency of the resources available to his
    disposal.
  • ?The engineer shall have inspected the side and
    surrounding conditions thoroughly and assesses
    how the specific conditions will effect the
    output of his resources.

16
  • b)
  • At least 9 cubes of trail mix shall be
    carried out to check the strength of the mix
    specified on contract drawings.
  • Rebound hammer test also has to be carried
    out on preconstruction test panels at locations
    selected by engineer ( at least 30 points ).
  • The contractor has to redesign the mix if the
    results of any cube or any rebound hammer test
    are below the specified strength on the drawing.

17
  • c)
  • For every 300m² of completed gunite works, a
    series of rebound hammer test ( 30 test points
    per series ) has to be carried out to verify the
    strength
  • ( 28 day strength ).
  • The engineer reserves the right to reject the
    gunite work if the average result test is below
    the specefic strength.
  • d)
  • gtgtgtgtgt All weep holes shall be marked by red
    paint to show the required effective thickness of
    gunite specified on drawing.

18
  • e)
  • Prior spraying of gunite, the contractor shall
    request inspection by engineer and a photo shall
    be taken to show the thickness markings.
  • The engineer reserves the right to reject the
    gunite works if the thickness of gunite is found
    inadequate or the gunite is found porous or low
    strength
  • ( less than specified value ).
  • Contractor shall bear the full costs and fees
    for the rectification works are detected.///
  • The contractor shall engage a specialist
    geothechnical engineer accredited by
    ACEM-/////////////?//????//??IEM to propose
    rectification works, when defective works are
    identified and directed by the engineer.
  • The contractor is fully responsible for the
    costs, time delay in works and other incidental
    consequences for the defective works detached.

19
  • GUNITING OR SHOTCRETE

20
Gunite or Shotcrete refers to concrete produced
by the projection of wet sand and cement mixture
onto an area, by means of pressure applied
through a continuously feeding pressure vessel.
Using guniting, concrete can be applied on
irregular, vertical and overhead surfaces. This
application is used commonly to protect slopes
from erosion, as well as structures of large
areas or uneven surfaces.
21
Slope protection by gunitingLocation ? Kuala
Lumpur
Rehabilitation of an existing spillway by
gunitingLocation?Pahang
22
  • GUNITING OF A DIAPHRAGM
  • WALL AT BASEMENT CARPARK

23
Pouring of mixed guniting material (weight ratio
dependent on client's requirements)into the
guniting pump.
Spraying of guniting material onto the wall at a
pressure of 3 bar.
Our shotcrete team utilises an internal drainage
system by installing Delta-MSonto the wall,
followed by the installationof BRC mesh onto its
surface. Guniting works is then done on the
Delta-MS.
24
Periodical condition inspection and assessment
of an existing hotel blockLocation?Kuala Lumpur