Title: APMP TCL Report to WGDM8
1Asia Pacific Metrology Programme23rd General
AssemblyTechnical Committee for Length (TCL)
Siew Leng TAN (SPRING Singapore, Singapore) 28
Sep 2006 Sydney, Australia 23GA Agenda 15 TCL
2Outline
Inter-RMO Comparison
3Change of Chair
- Dr R P Singhal (NPLI, India)
- - elected as Chair in Dec 2006
- - retired in Jul 2007
- Ms Siew Leng Tan (SPRING Singapore, Singapore)
- - nominated as Vice Chair in Apr 2007
- - proposed as Acting Chair in Jun 2007 at the
APMP EC/TC Chairs meeting - - announced as Chair wef 30 Jul 2007 by the APMP
Secretariat
4Key Comparisons APMP.L-K1
K1 gauge blocks
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
Jan 2001
NMIJ (Mr. I. Fujima)
Jul 2002
Aug 2004 (Dr. J. Ishikawa)
May 2006 Published
- 11 participants
- Final results were published in May 15 of 2006
K2 long gauge blocks
K3 angle standards
K4 diameter standards
K5 1-D CMM artifacts
K6 2-D CMM artifacts
5APMP.L-K1.1 Follow up comparison for gauge blocks
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
May 2005
NMIJ (Dr. Hirai)
Sep/Oct 2006
- 10 steel Gauge Blocks, central length 0.5 mm to
100 mm - 7 participants CMS, MSL, NIMT, NMIJ, NML-SIRIM,
NPLI, VMI - Draft A is under preparation
6Key Comparisons APMP.L-K2
K1 gauge blocks
K2 long gauge blocks
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
Jun 2000
NMIA (Dr. N. Brown)
May 2002
June 2004
May 2006 Published
- 12 Participants
- Final results was published in May 22 of 2006
K3 angle standards
K4 diameter standards
K5 1-D CMM artifacts
K6 2-D CMM artifacts
7Key Comparisons APMP.L-K3
K1 gauge blocks
K2 long gauge blocks
K3 angle standards
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
May 2005
NMISA (Ms. L. Mostert)
- 12 participants
- Last 3 labs in the pipeline NIM, SSRC-NSCL and
NMIJ
K4 diameter standards
K5 1-D CMM artifacts
K6 2-D CMM artifacts
8Key Comparisons APMP.L-K4
K1 gauge blocks
K2 long gauge blocks
K3 angle standards
K4 diameter standards
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
CMS (Dr. J. Lee)
- Standards supplied by NMIJ
- 14 participants
- Scheduled to start in early 2008. Pilot lab is
currently checking on the roundness, straightness
and parallelism of the standards
K6 2-D CMM artifacts
9Key Comparisons APMP.L-K5
K1 gauge blocks
K2 long gauge blocks
K3 angle standards
K4 diameter standards
K5 1-D CMM artifacts
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
Dec 2005
KRISS (Dr. T.B. EOM)
- 13 participants (PTB had withdrawn as service is
no longer provided)
K6 2-D CMM artifacts
10Key Comparisons APMP.L-K6
K1 gauge blocks
K2 long gauge blocks
K3 angle standards
K4 diameter standards
K5 1-D CMM artifacts
K6 2-D CMM artifacts
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
Apr 2006
NMIJ (Dr. T. Takatsuji)
- Schedule was delayed by 4 mths and expected to
finish in Feb 2008 - Details available in http//www.nmij.jp/dms-std/a
pmplk6.html
11Key Comparisons APMP.L-K11
K11 633 nm He-Ne laser
Initiating
Planning
Circulating
Reporting
Publishing
Preparation
Draft A
Draft B
Survey
Pilot
Starting
Ending
Final
NIM (Dr. S. Gao)
- 8 participants
- Final results were published in Aug 17 of 2007
K1.1 Follow up comparison for gauge blocks
12Supplementary Comparisons
Bi-lateral Comparison
- PTB-NMIJ/AIST bi-lateral comparison
- Measurements on pitch standards and completed
- Report approved and posted as APMP.L-S2
Multi-lateral Comparison
(Pilot study, not registered)
- NMIJ, CMS, KRISS, and Finland multi-lateral
comparison - Measurements on EDM
- measurements were completed in Sep 2006
Registering the Result
- For comparison result to be recorded
- Technical protocol to be approved by TCL chair
- APMP-G2 guideline for conducting comparisons is
followed
13Inter-RMO Comparison
Status and Discussion
- Line Scale EURAMET Key Comparison(EURAMET.L-K7)
- Piloted by MIRS of Slovenia (Dr. Bojan Acko)
- Accept participants from outside EURAMET
- 31 participating laboratories
- Surface Roughness- APMP Key Comparison(APMP.L-K8)
- Piloted by NMIA of Australia (Mr. Andrew Baker)
- Accept participants from outside APMP
- 17 laboratories expressed interests
- Protocol was discussed at the last TCL meeting
in India
14CMCs TCL Review Board Members
CMC Review Process Intra-Regional
Intra-Regional Review
TCL Chair/ Vice Chair
CMCs QS
APMP NMIs
TCL Chair
Review Board
CMCs Preparation
CMC Submission
Assign Reviewers
Carry out Reviews
Register for Inter-regional Review
- QS should be ready with CMCs
- CMC claims
- QS information
- (on APMP web)
CMC Review Process Inter-Regional
CMC Review Status
TCL QS Review
15CMCs TCL Review Board Members
CMC Review Process Intra-Regional
CMC Review Process Inter-Regional
- A CMC Review Platform was created for helping to
coordinate Inter-RMO review processes
CMC Review Status
TCL QS Review
16CMCs Review Status
CMC Review Process
CMCs Review Status
Submission to TCL for intra-regional review
Current status of TCL CMCs
- CMCs of NPLI (APMP.L.3.2006), clarifying
inter-RMO review comments - CMCs of KIM-LIPI (APMP.L.4.2006), submitted for
inter-RMO review - CMCs (7) of NMISA (ZA), processing for APMP
inter-RMO review
Submission to TCL for inter-regional review
- EUROMET.L.4.2006 Completed
TCL QS Review
17Other Topics
- Participated in CCL/CCL-WGDM/CCL-CCTF meetings at
BIPM from 10-14 Sep 2007 - TCL meeting/workshop to be held from 2930 Oct
2007 prior to the 23rd GA - - TCL/TCTF joint workshop on optical
frequency metrology - - TCL workshop on CMM metrology
- Website for TCL activities
- URL http//www.nml.org.tw/apmptcl/
- Password for the downloads apmptcl2004