Title: EVALINK Progress report DSNA


1
EVALINK Progress report DSNA
  • 10th October 2007

2
EVALINK planning
Tests with external partners (Airbus, EEC
Brétigny)
Tests with external partners (Airbus, EEC
Brétigny)
Tests with data-link flights, transfers with MUAC
3
Last steps before starting date
  • Site Acceptance Test well under way
  • Tests between Reims and Airbus, EEC, MUAC
  • Training
  • ARINC-to-SITA interconnection would help a lot

4
EVALINK in Reims ACC
  • French CPDLC 2008 experiment 7th of January to
    28th of March
  • Live trials fully in line with LINK 2000
  • DLIC, ACM, ACL, AMC
  • ATN and VDL mode 2
  • FANS accommodation offered during the trials
  • CPDLC above FL 345 and, depending on traffic
    load, above FL 270
  • Two Controller Working Positions
  • Dedicated HMI on a TID with a third controller

5
Here
6
EVALINK/HMI FL messages
7
EVALINK/HMI ACM messages
Next sector pre-selected from the Flight plan
Only two steps 1 Select FRQ field 2 Send
Contact
8
Objectives of DSNA
  • To evaluate LINK 2000 services with controllers
    and pilots
  • To run Air Server developed with Thales in an
    operational context
  • To test a full ATN / VDL2 connexion
  • To involve both technical and operational staff
    of Reims ACC

9
Interest to Link 2000
  • First geographical extension of CPDLC beyond
    Maastricht airspace
  • First inter-centre CPDLC transfers as Reims is
    adjacent to MUAC
  • Validation of full SITA-ARINC internetworking

10
The more CPDLC aircraft, the better !
11
All Airlines are welcome
  • We hope that all Airlines already exchanging
    CPDLC with MUAC will contribute to EVALINK

12
EVALINK is (almost) here
  • From 7th January to 28th of March 2008
  • With FANS accommodation
  • Sectors concerned in Reims ACC
  • Contiguous to Maastricht MUAC
  • UR-XR-KR-HR / UN-XN-KN-HN
  • Point of contact frederic.lecat_at_aviation-civile.
    gouv.fr

To summarize, we are waiting for