Title: BT Access Network Facilities


1
BT Access Network Facilities Costs for Major
Items
2
Agenda
  • Co-location
  • Set-up
  • Ongoing cost
  • Tie Cables
  • Metallic Path Facilities
  • Conclusion

3
Co-location Room Build
  • Assessed on case ny case basis
  • Itemised quotes based on contractors estimate
  • Ranges for Typical items
  • Ventilation/Cooling 5k - 20k
  • Minor Equipment 8k - 20k
  • Planning 2k - 5k
  • Access Control 5k - 10k
  • Doors 2k - 5k
  • Flooring and building 200 - 500 per square
    metre.
  • Cable Runway 10k - 25k
  • Possible Range for 10 m? 30k - 100k

4
Co-location Ongoing costs (1)
  • Annual Maintenance Costs
  • Building by building basis, may be regional.
  • General maintenance of building fabric
  • Surcharge on Internal Tie Cable
  • Maintenance of dedicated space
  • Estimated Range 10- 20 per sq m pa.

5
Co-location Ongoing costs (2)
  • Licence Fee
  • Space utilisation contribution to building
    rates
  • Building by building basis, may be regional
  • Light Industrial or Alternative use
  • Typical Estimated ranges per m? per annum
  • London and the South East 50 to 200
  • Wales and the Midlands 20 to 200
  • North England and Scotland 20 to 150
  • Northern Ireland 20 to 50

6
Co-location Ongoing Costs (3)
  • Basic Power Consumption
  • metered
  • per KWh consumed
  • Regional
  • Will not exceed local power company tariffs
  • Stand-by Power will be extra
  • based on designed load

7
Tie Cables
  • Internal Tie Cable (per 100 pairs)
  • Average costs on average length
  • Connection used to recover of systems set-up
    costs
  • Estimated Approximate costs
  • Set-up 4000 Ongoing 200 pa.
  • External Tie Cable
  • Labour materials cost dependent on cable
    distance
  • For 1000 pair, estimated cost per 100m
  • Set-up 9,000 Ongoing 800 pa

8
Metallic Path Facility
  • Determined by Oftel
  • LRIC Mark-up
  • Ongoing Costs
  • Set-up costs for Transfer/Take-over
  • Line Test
  • Cost per fault report occasion
  • Maintenance Adjustment?

9
Metallic Path Fcility (2)
  • New Pair Set-up Costs
  • Parity with BT Broadband policy
  • Bottom-up costs
  • 4 standard costs
  • From Stock Minor network intervention Major
    network intervention Small network build.

10
Conclusion
  • Indicative costs only
  • Not all cost items covered - eg. BT Egress, Full
    Survey cost, Site visits.
  • Major Cost elements only
  • Oftel paper Expected Mid-May