Enterprise Transformation through Lean Six Sigma
Deployment
F404 Case Study A Journey of Discovery
  • VADM Wally Massenburg, USN (Ret)
  • 1 May 2008

2
NAVAL AVIATION ENTERPRISE
Requirements/Risk Assessment CEO CHIEF EXECUTIVE
OFFICER
RIGHT FORCE . . .RIGHT READINESS . . . RIGHT
TIME . . .RIGHT COST . . .
Sponsors CFO CHIEF FINANCIAL OFFICER
Providers COO CHIEF OPERATING OFFICER
3
OPERATING AS AN ENTERPRISE
  • SINGLE PROCESS OWNER
  • SINGLE FLEET-DRIVEN METRIC AIRCRAFT UNITS
    READY FOR TASKING AT REDUCED COST (CONTINUES TO
    MATURE)
  • VALUES WHAT WE BELIEVE
  • FLEET READINESS
  • COST-WISE (LESS S)
  • TIME ON WING (LESS STUFF)
  • SPEED (LESS TIME IN MAINTENANCE)
  • PEOPLE (CONTINUOUS IMPROVEMENT)
  • THREE MAIN FOCUS AREAS
  • READINESS TODAY, TOMORROW, AND FUTURE
  • TOTAL FORCE READINESS (PEOPLE DIMENSION)
  • COST MANAGEMENT

4
THE INSPIRATION
AIRCRAFT
Where did the money go?
5
Basis for Process Improvement Lean Six Sigma
6
F404 I-Level Consolidation Metrics
7
F404 I-Level Consolidation Over-Arching Benefits
  • Eliminates I-1 training requirements
  • Aligns sea shore duty billet skill sets (I-3
    repairs mirrored at sea ashore)
  • Utilizes manpower more efficiently with civilian
    workforce
  • Creates local permanent resident experts with
    civilian workforce
  • Eliminates high turnover of mechanics
  • Reduces lost time due to inexperience
  • Reduces infant mortality removals (TOW)
  • Reduces production assembly variances
  • Increases projected reliability
  • Historically depot produced engines consistently
    had higher TOW than I-level sites
  • Depot MEFHBR 502 EFH FY00-05
  • Five major I-1 activities MEFHBR 398 EFH FY00-05
  • All options support CNOs military manpower
    reduction goals

8
(No Transcript)
9
FLEET-WIDE VISIBILITY
READINESS
FLIGHT HOUR PROGRAM
10
OVERARCHING READINESS AND SUSTAINMENT CONCEPT
  • Balance Capability and Availability _at_ Reduced
    Cost
  • (Fleet Driven Metric)
  • Supporting Metrics
  • Inventory (People and Stuff)
  • Reliability
  • Cycle Time Reduction
  • Total Cost (All Financial Stovepipes)
  • 10 Integrated Logistics Support Elements
  • (Where all the cost is borne)

11