Air and Noise Pollution - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Air and Noise Pollution

Description:

TRIKE Fund as seed money for: (i) purchase of new/more efficient engines, (ii) ... 45,000 (30%) of TRIKE Fund has been loaned out, with 100% repayment rate ... – PowerPoint PPT presentation

Number of Views:101
Avg rating:3.0/5.0
Slides: 15
Provided by: OIS573
Category:
Tags: air | noise | pollution | trike

less

Transcript and Presenter's Notes

Title: Air and Noise Pollution


1
Air and Noise Pollution Reduction Strategies
for Tricycle Sub-Sector in Puerto
Princesa City
2
Background
  • Assessment of tricycle sub-sector in Puerto
    (April Aug 2004)
  • Prioritization of strategies (Oct 2004)
  • Additional assistance for
  • pilot testing of strategies
  • (April 2005)
  • LOA signing (Sept 2005)

3
Project Objectives
  • Reduce environmental and health hazards by
    reducing air and noise pollution from tricycles
    without impairing the drivers / operators
    income levels by
  • Promoting the use of more efficient tricycle
    engines and sound operation practices
  • Developing livelihood entrepreneurial skills of
    tricycle drivers/operators and
  • Strengthening local capacities on CAA enforcement

4
Project Components(1)
  • Preventive maintenance (clean-up) trainings to at
    least 400 tricycle drivers/operators
  • Vocational course on Motorcycle Servicing to at
    least 25 tricycle drivers/operators to be
    certified engine mechanics
  • TRIKE Fund as seed money for (i) purchase of
    new/more efficient engines, (ii) investment on
    alternative livelihood, and (iii) construction of
    service centers/refilling stations

5
Project Components(2)
  • Livelihood development trainings for at least 100
    tricycle drivers/operators
  • Effective ambient air quality management database
    system
  • Roadside monitoring and apprehension
  • Dissemination of lessons learned

6
Approaches Preventive Maintenance
  • Selection of participating tricycle drivers/
    operators, equally distributed among TODA
    population
  • 3-hr demonstration
  • and hands-on training
  • Distribution of manuals on
  • 2-stroke and 4-stroke
  • engines

7
Approaches Engine Mechanics
  • Selection of participating tricycle drivers/
    operators, each signed LOA with respective TODA
  • 3-month vocational course program
  • Certification as engine mechanics

8
Approaches TRIKE Fund
  • Selection of an MFI to administer and manage the
    Fund
  • 120,000 from ADB and 30,000 from CGPP
  • Special interest rates and repayment packages
    compared to typical MFI loans
  • Turn-over to CGPP upon Project completion

9
Approaches Livelihood Training
  • Partnership with national and local livelihood
    development agencies for technical training
  • Provision of soft loans for investments in
    alternative livelihood activities
  • Partnership with local industries associations
    for product marketing

10
Approaches Ambient Air Quality
  • Partnership with laboratories specializing in air
    pollution assessment
  • Training for City ENRO
  • personnel in installation,
  • operation and maintenance
  • of air sampler
  • Results of air sampling analysis used to
    establish monitoring data

11
Approaches Roadside Apprehension
  • Selection of City ENRO officers as deputies
  • Demonstration and
  • hands-on training on
  • the use of gas analyzer
  • and noise meter
  • Actual roadside monitoring
  • Updating of fines and penalties
  • Actual roadside apprehension

12
Approaches Lessons Learned
  • Documentation of Project activities
  • Formulation of policy advocacies for the adoption
    of national framework for tricycle transport
    development
  • Participation to national and international fora
  • Local and national seminars

13
Accomplishments 1st year (1)
  • About 480 tricycle drivers/operators trained to
    do regular preventive maintenance now training
    fellow TODA members
  • Adoption of a TODA-wide Resolution in conducting
    regular engine clean-up
  • 25 certified engine mechanics
  • 45,000 (30) of TRIKE Fund has been loaned out,
    with 100 repayment rate

14
Accomplishments 1st year (2)
  • Livelihood trainings to at least 70 tricycle
    drivers/operators have been conducted
  • At least 3 CENRO personnel have been deputized as
    CAA enforcers
  • Actual roadside monitoring have been conducted
    for 1 month
Write a Comment
User Comments (0)
About PowerShow.com