Start Presentation - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Start Presentation

Description:

Following 11th September 2001 reaction by US government ... Simultaneous ETD check-in (Southwest Airlines) 100% ETD post ticketing, Solution 2 ... – PowerPoint PPT presentation

Number of Views:19
Avg rating:3.0/5.0
Slides: 11
Provided by: BillH78
Category:

less

Transcript and Presenter's Notes

Title: Start Presentation


1
Start Presentation
2
Helping our customers increase the
efficiency,capacity and safety of the global
aviation industry through the provision of
integrated simulation, decision support and
scheduling solutions
The role of Simulation in installation of
Explosive Detection Systems
A Boeing Company
Auckland June 03
3
The Task
  • Following 11th September 2001 reaction by US
    government introduce 100 screening across
    the country
  • Tender developed and released for bid early
    2002
  • Requirement - install combination of EDS and
    ETD stations at 438 US airports
  • Engineering, architectural, airport consultants
    and construction firms required for the
    exercise
  • Boeing awarded contract to oversee the
    effective installation of machines into
    airports

Auckland June 03
3
4
Issues to be Addressed
  • Model airport using data from architects
    planners
  • Identify modelling resources and conduct
    training
  • What number, location, and combination of
    machines?
  • What space is required for machines and people?
  • What protocol to best process people and bags?
  • What queue and procedure setup for maximum
    efficiency?
  • Passenger flow pattern optimization
  • Baggage room processing procedures
  • Passenger and baggage matching
  • Passenger and baggage tracking from check-in to
    loading

Auckland June 03
4
5
Beginning TSA project
  • Create template models for various security
    protocols to
  • determine most workable combinations
  • 100 ETD pre-ticketing
  • 100 ETD post ticketing, Solution 1
  • 100 ETD post ticketing, Solution 2
  • Simultaneous ETD check-in (Southwest Airlines)
  • EDS/ETD hybrid post-ticketing
  • 100 EDS post ticketing

Auckland June 03
5
6
Simulation was used to
  • Model an entire airport terminal environment
    or just discrete areas
  • Assist managers and designers by predicting
    delays or problems
  • for nearly any aspect of passenger and
    baggage processing
  • Associate every passenger and every bag with a
    specific flight,
  • provide a description and security processing
    record
  • Determine processing systems capacity limits,
    hardware and
  • staffing requirements, over any time period
    of interest
  • Reduce risk and offer cost avoidance
    opportunities by analyzing
  • proposed changes and what-if scenarios

Auckland June 03
6
7
Lessons Learnt
  • Early planning avoid undue inconvenience
  • Modelling and simulation is key
  • Recognised PaxSims comprehensive planning
    capability
  • and visualisation features very valuable for
    decision-making
  • Critical - Communication from outset with
    stakeholders

Auckland June 03
7
8
Preston Simulation and Scheduling Products
A Boeing Company
Auckland June 03
8
9
Summary
Optimized resource allocation based on to
strategic planning data
Implement operational plan with greater confidence
Optimize
Implement
Simulate
what if
Simulate based on resource allocation and planned
schedule
Analyse using further what ifs to overcome
operational constraints
A Boeing Company
9
Auckland June 03
10
Helping our customers increase the efficiency,
capacity and safety of the global aviation
industry through the provision of integrated
simulation, decision support and scheduling
solutions
www.preston.net
Managing Tomorrow Today
Write a Comment
User Comments (0)
About PowerShow.com