Beam Requirements for PVDIS - PowerPoint PPT Presentation

About This Presentation
Title:

Beam Requirements for PVDIS

Description:

Seems ruled out by PC-off runs. Big asymmetries, small derivatives wrt beam parameters ... Test Run (2 shifts, Invasive !) Backgrounds. Explain next week ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 6
Provided by: rober489
Category:

less

Transcript and Presenter's Notes

Title: Beam Requirements for PVDIS


1
Beam Requirements for PVDIS
Property Value Run-Avg Hel. Correl. 1-Day Hel. Correl.
Energy 6 and 4.8 GeV dE/E lt 1 ppm lt 5 ppm
Current 100 uA 1 ppm 5 ppm
Position 0 (normal tolerance) 50 nm 250 nm
Angles 0 (normal tolerance) 50 nrad 250 nrad
Transv. Beam Polarization 0 Vert lt 20 Horiz. lt 120 ? same
X or Y
X or Y
Explain another time
2
HAPPEX-3 Fall 2009
Energy ?
150 nm
Diffs helicity-correlated diffs in microns.
0.005 um 5 nm
1 slug 1 period of half-wave plate state
24 hours
Sign corrected put in a sign flip
correlated to half-wave plate, to show the
effect of HCBA on combined sample.
3
Parity Quality Beam good enough for
PVDIS
Big asymmetries, small derivatives wrt beam
parameters
Marginal for PREX ( especially BPM12x
Energy )
  • Interception at Injector ?
  • Some reductions in diffs after work
    done at injector
  • e.g. after Sept 15 and Oct 15
    work
  • Largest Component of diffs flips sign with
    half-wave plate
  • Could be a Pockel Cell steering
    effect
  • Could be electronics pickup from
    Pockel Cell

? Seems ruled out by PC-off runs.
? Speculative hypothesis on next slide.
4
  • Speculative Cause of BPM12x (Energy)
    diffs
  • Electronics pickup from Pockel Cell ?
  • Very small, but amplified somehow
    when slits closed
  • Improved injector tune in last week
    seemed to fix it.

(K. Kumar)
? Can affect the beam, as during Happex-He.
? Turns into an Energy diff.
  • Strategy
  • Watch the slug plots during PVDIS
  • If not good enough, may revisit
    pickup issue injector transmission
    issue if PVDIS allows or requires.

5
PVDIS Run Plan
  • Down time Oct 28 Nov 4 ?
  • Swap detectors, cabling work,
    target work
  • Commissioning Nov 4 7
  • Establish good detectors, target
    boiling tests, Compton tests, Parity
    quality beam, BCM
    calibration, PVDIS DAQ.
  • Production to Dec 23

Take data on LD2 Periodic Auxiliary
Measurements Compton Issues
Moller, Q2 , Backgrounds
Transverse Polarization Test Run (2
shifts, Invasive !)
Explain next week
Backgrounds
Write a Comment
User Comments (0)
About PowerShow.com