Title: Beam Requirements for PVDIS
1Beam Requirements for PVDIS
Property Value Run-Avg Hel. Correl. 1-Day Hel. Correl.
Energy 6 and 4.8 GeV dE/E lt 1 ppm lt 5 ppm
Current 100 uA 1 ppm 5 ppm
Position 0 (normal tolerance) 50 nm 250 nm
Angles 0 (normal tolerance) 50 nrad 250 nrad
Transv. Beam Polarization 0 Vert lt 20 Horiz. lt 120 ? same
X or Y
X or Y
Explain another time
2HAPPEX-3 Fall 2009
Energy ?
150 nm
Diffs helicity-correlated diffs in microns.
0.005 um 5 nm
1 slug 1 period of half-wave plate state
24 hours
Sign corrected put in a sign flip
correlated to half-wave plate, to show the
effect of HCBA on combined sample.
3 Parity Quality Beam good enough for
PVDIS
Big asymmetries, small derivatives wrt beam
parameters
Marginal for PREX ( especially BPM12x
Energy )
- Interception at Injector ?
- Some reductions in diffs after work
done at injector - e.g. after Sept 15 and Oct 15
work - Largest Component of diffs flips sign with
half-wave plate - Could be a Pockel Cell steering
effect - Could be electronics pickup from
Pockel Cell
? Seems ruled out by PC-off runs.
? Speculative hypothesis on next slide.
4- Speculative Cause of BPM12x (Energy)
diffs - Electronics pickup from Pockel Cell ?
- Very small, but amplified somehow
when slits closed - Improved injector tune in last week
seemed to fix it.
(K. Kumar)
? Can affect the beam, as during Happex-He.
? Turns into an Energy diff.
- Strategy
- Watch the slug plots during PVDIS
- If not good enough, may revisit
pickup issue injector transmission
issue if PVDIS allows or requires.
5PVDIS Run Plan
- Down time Oct 28 Nov 4 ?
- Swap detectors, cabling work,
target work - Commissioning Nov 4 7
- Establish good detectors, target
boiling tests, Compton tests, Parity
quality beam, BCM
calibration, PVDIS DAQ. - Production to Dec 23
Take data on LD2 Periodic Auxiliary
Measurements Compton Issues
Moller, Q2 , Backgrounds
Transverse Polarization Test Run (2
shifts, Invasive !)
Explain next week
Backgrounds