EO1 Launch Site Activities Range Safety Interface - PowerPoint PPT Presentation

1 / 5
About This Presentation
Title:

EO1 Launch Site Activities Range Safety Interface

Description:

Two air ride vans, possibly the same carrier. All flight hardware and GSE ... Baselined maximum tip-off of 3 degrees per second ... – PowerPoint PPT presentation

Number of Views:52
Avg rating:3.0/5.0
Slides: 6
Provided by: MMc60
Category:

less

Transcript and Presenter's Notes

Title: EO1 Launch Site Activities Range Safety Interface


1
EO-1 Launch Site ActivitiesRange Safety Interface
  • EWR 127-1 Tailoring Completed September 1997
  • Preliminary MSPSP Submittals December 1997 and
    October 1998
  • System Safety Program Plan Completed October 1998
    - Rev. A, January 1999
  • Signature Copy MSPSP Submittals in progress now,
    to be completed by July 1999
  • Hazardous Procedures are progressing, Schedule
    requires Range submittal by the end of July 1999

2
EO-1 Launch Site ActivitiesRange Documentation
  • Program Introduction / Statement of Capability
    Completed April 30, 1998
  • Program Requirements Document Draft Released
    March 22, 1999 (UDS Format, Prepared by NASA
    KSC/VAFB)
  • Launch Site Support Plan - Preliminary Issue
    Released June 1999 (NASA KSC/VAFB)
  • Operational Requirements in preparation by NASA
    KSC/VAFB
  • Launch Site Activities Plan - Preliminary
    Release, June 1999 (Swales Document)

3
EO-1 Launch Site ActivitiesTransportation to VAFB
  • GSFC Transportation Branch providing extensive
    support
  • GSFC to VAFB will be identical to SAI to GSFC
    Trip (except farther)
  • Two air ride vans, possibly the same carrier
  • All flight hardware and GSE
  • Crates and packing materials and practices
  • S/C shipping environment characterized
  • Vibration isolation system validated

4
EO-1 Launch Site Activities
5
EO-1 Launch Vehicle InterfaceIssues -Tip Off
Rates
  • Baselined maximum tip-off of 3 degrees per second
  • Initially achieved 3 deg/s by reducing separation
    spring rates
  • Addition of Hyperion drives stowed C.G. further
    in the spacecraft -y direction, which is the
    major contribution to tip-off rates
  • Preliminary Separation analysis indicate a
    nominal tip-off rate of approximately 4 deg/s,
    3s rate of 5 deg/s.
  • Corrective action to be taken
  • Verify Solar Array Deployable at 5 deg/s
  • Verify detumble capability of ACS with initial
    rate of 5 deg/s