Spaceport Implications of Star Tram Concept - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

Spaceport Implications of Star Tram Concept

Description:

Security at the spaceport, facilities along the. launch system and ... for maglev launch systems and fuel (RLV) to flight service. Air lock chamber and final ... – PowerPoint PPT presentation

Number of Views:203
Avg rating:3.0/5.0
Slides: 26
Provided by: mikem77
Category:

less

Transcript and Presenter's Notes

Title: Spaceport Implications of Star Tram Concept


1
Spaceport Implications of Star Tram Concept
Requirements
  • Security at the spaceport, facilities along the
  • launch system and around the entire perimeter
  • of the launch tube and support system

2
Spaceport Implications of Star Tram Concept
Ground Flow Analysis
3
Star Tram Ground Flow Analysis
General
  • Facility organized to accommodate timely
  • and efficient vehicle recovery, processing
  • and launch through in-line and off-line
  • operations
  • In-line operations designate critical path
  • functions staged to optimize servicing time
  • of a flight vehicle as it moves through the
  • service facility from recovery to next-launch

4
Star Tram Ground Flow Analysis
General
  • Off-line operations provide services and
  • support in-line operations

5
Star Tram Ground Flow Analysis
Landing and Recovery Operations - RLV
  • Inspection and safing of returning vehicles
  • Off-load passengers and crew with
  • transport to terminal facilities
  • Passenger and crew
  • processing, security and
  • support facilities
  • Overnight accommodations
  • and amenities for passengers
  • and crew

6
Star Tram Ground Flow Analysis
Landing and Recovery Operations - RLV
  • Medical services and flight training facilities
  • Parking and multi-modal transportation
  • center

7
Star Tram Ground Flow Analysis
Flight Vehicle Processing Routine Service
Operations - RLV
  • Routine vehicle servicing bay for quick
  • turn-around to launch

8
Star Tram Ground Flow Analysis
Flight Vehicle Processing Routine Service
Operations - RLV
  • Integrated Vehicle Health Management
  • systems, schedules repairs and stages
  • parts

9
Star Tram Ground Flow Analysis
Flight Vehicle Processing Routine Service
Operations - RLV
  • Off-line maintenance depot for flight
  • vehicle receiving and check-out

10
Star Tram Ground Flow Analysis
Flight Vehicle Processing Routine Service
Operations - RLV
  • Parts receiving and distribution facility
  • tied to IVHM systems

11
Star Tram Ground Flow Analysis
Flight Vehicle Assembly Processing - HLM
  • Receiving, handling and warehousing
  • facilities for HLM payload modules,
  • aerodynamics fairings and propulsion
  • modules shipped to the site

12
Star Tram Ground Flow Analysis
Flight Vehicle Assembly Processing - HLM
  • Payload receiving, handling and
  • and processing facility to receive and
  • prepare payloads and pre-loaded HLM
  • modules

13
Star Tram Ground Flow Analysis
Flight Vehicle Assembly Processing - HLM
  • Assembly facility where payloads and
  • payload modules are integrated and
  • power modules and fairings are attached
  • in an assembly line process

14
Star Tram Ground Flow Analysis
Flight Vehicle Assembly Processing - HLM
  • Transport system to convey HLMs
  • through the assembly facility and to
  • launch position

15
Star Tram Ground Flow Analysis
Payload Processing Operations - RLV
  • Payload shipping/receiving and
  • processing facility to handle and
  • distribute payloads from off-site

16
Star Tram Ground Flow Analysis
Payload Processing Operations - RLV
  • Payload/container assembly and testing
  • lab for up-payloads

17
Star Tram Ground Flow Analysis
Payload Processing Operations - RLV
  • Payload integration and testing bay for
  • payload insertion into flight vehicle

18
Star Tram Ground Flow Analysis
Payload Processing Operations - RLV
  • Payload removal bay and isolation/
  • decontamination area to handle removal
  • of down-payloads from flight vehicle

19
Star Tram Ground Flow Analysis
Payload Processing Operations - RLV
  • Payload de-integration area to separate
  • payloads from containers and prepare
  • for shipping off-site

20
Star Tram Ground Flow Analysis
Pre-Launch/Launch Operations
  • Receive and load departing passengers
  • and crew - RLV
  • Receive assembled HLM
  • Flight support services
  • on-loads food and services
  • passenger/crew related
  • support systems - RLV

21
Star Tram Ground Flow Analysis
Pre-Launch/Launch Operations
  • Power generation facility with
  • co-generation capability provides power
  • for maglev launch systems and fuel (RLV)
  • to flight service
  • Air lock chamber and final
  • launch position at end of
  • evacuated launch tube

22
Star Tram Ground Flow Analysis
Pre-Launch/Launch Operations
  • Launch support systems for vehicle
  • monitoring and initiation of launch

23
Star Tram Ground Flow Analysis
Administrative Operations
  • Spaceport Management functions located
  • at various facilities throughout the Star
  • Tram complex
  • Administrative offices for Star Tram
  • operations and flight planning
  • Launch control, flight communications
  • and related launch operations

24
Star Tram Ground Flow Analysis
Administrative Operations
  • Rescue, firefighting and security
  • operations
  • Roads, grounds and facility maintenance
  • operations
  • Storage and distribution facilities

25
Conceptual Application Star Tram
Write a Comment
User Comments (0)
About PowerShow.com