Avoiding Pitfalls in WriteOn Installations - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Avoiding Pitfalls in WriteOn Installations

Description:

79% of all Write-On licenses installed are being actively ... Handwriting Game. Abbreviation List / Test. Mandatory Practice Sessions. Identify bad attitudes ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 16
Provided by: alexma3
Category:

less

Transcript and Presenter's Notes

Title: Avoiding Pitfalls in WriteOn Installations


1
Avoiding Pitfalls inWrite-On Installations
2
Write-On Track Record
  • 79 of all Write-On licenses installed are being
    actively used 3-6 months later
  • Survey Are you actively using your Write-On
    handhelds and are you happy with them? 79 say
    Yes!

3
Success Stories
  • Benefits of WO are realized
  • Servers fight over them
  • Wouldnt want to do my job with it
  • Im serving more customers
  • Drink sales increase
  • Errors decrease

4
Failures
  • Doesnt work
  • Technical problem
  • Lack of commitment
  • Dont have time
  • Management not all on board
  • One partner loves it, other doesnt
  • Owner loves it, manager doesnt

5
Qualify Prospects
  • Only for those who really want it
  • All decision makers must be on board
  • Meet GM shift managers
  • Identify WO Champion

6
Wireless / Network
  • Site Survey!
  • AP placement
  • Signal strength
  • Walls / Construction
  • Power
  • Test cables

7
Configuration / Setup
  • Abbreviations
  • Common Name
  • Meet with servers
  • Abbrev. Exceptions
  • Dedicated Server machine

8
Training
  • Everyone involved
  • Plenty of time
  • Handwriting Game
  • Abbreviation List / Test
  • Mandatory Practice Sessions
  • Identify bad attitudes

9
Followup
  • Issue Log
  • Tweak MI names/abbreviations
  • WiFi Site Survey during business

10
Morale
  • Get bugs out before go-live
  • One bad shift can damage confidence
  • Keep management informed and on board
  • Be there for them

11
Case Study 1
  • Father and daughter restaurant
  • Father convinced by WO benefits
  • Daughter didnt think it was a good idea
  • Daughter was the one managing day to day
    operations and supervising servers.

12
Case Study 2
  • System tested out great during installation and
    training
  • HHs worked great during day, through lunch rush.
  • Once dinner got going, all HHs had communications
    errors.
  • The problem?
  • APs connected to same circuit as lights on
    dimmer.

13
Case Study 3
  • Similar to last case Worked great during day
    and through beginning of dinner.
  • HHs had communications problems as soon as the
    band started to play
  • The problem?
  • APs on same circuit as band plugged amps into

14
Case Study 4
  • Husband and wife restaurant
  • Husband drove the WO project, training, shift
    management
  • Husband fell ill.
  • WO stopped being used.

15
QuestionsDiscussion
Write a Comment
User Comments (0)
About PowerShow.com