Title: West LA College
1West LA College Math Science Building Sustainabl
e Design Process
HOK Sustainable Design
2Sustainable Design Process
- Integrated Design Team
- Project Planning
- LEED Approach
3Integrated Design Team
- Architect HOK Architects
- Lab Planning AHSC McLellan Copenhagen
- MEP Engineers TMAD Engineers
- Structural Eng. Risha Engineering Group
- Landscape Ahbe Landscape Architects
- Civil Engineers Psomas
- Cost Estimating Davis Langdon
4Project Planning
- Project Facts
- Site Area 1.3 Ac.
- Math Science Building Housing Multiple
Departments Faculty Offices - Mathematics
- Life Sciences
- Physical Sciences
- Dental Hygiene
- Planetarium
- Shared Lecture Halls
- Building Area - 90,000 GSF
- 30,000,000 Construction Budget
- Expected Completion 1st Quarter 2007
5Project Planning
- Planning Strategy
- Efficient Floor Plan
- Lab Module Coordinated with Structural Module
- Lab Wing Separated from Office Wing
- Lower Floor to Floor for Offices
- Separate Mechanical Systems
- Building Orientation
- Narrow Floorplates
- Daylighting Strategy
6Baldwin Hills Entry Plaza
Campus Green
7Site Plan
8Ground Level
Level 2
Shared Lecture/Lab with Planetarium
Life Sciences Department Faculty Offices
Level 1
Level 3
Level 4
Shared Lecture / Mathematics Department
Dental Hygiene Department
Life Sciences Physical Sciences Department
Physical Sciences Department
9View from the East Through the Plaza Bridge
Connection
10View from the North Lab / Lecture Building
11View from the South Lab / Lecture Office Wing
12LEED Approach - Scorecard
- Sustainable Sites 9 Points (14)
- Water Efficiency 2 Points (5)
- Energy Atmosphere 8 Points (17)
- Materials Resources 5 Points (13)
- Indoor Environmental Quality 11 Points (15)
- Innovation Design Process 4 Point (5)
- Total 39 Points (69)
- LEED Silver Certification 33 38 Points
13LEED Approach
- Sustainable Sites 9 Points
- Common Points
- Alternative Transportation, Bicycle Storage
Changing Rooms - Alternative Transportation, Parking Capacity
- Stormwater Management, Rate or Quantity
- Stormwater Management, Treatment
- Landscape Ext. Design to Reduce Heat Islands,
Non-Roof - Light Pollution Reduction
CAMPUS PLAN
- Project Points
- Site Selection
- Alternative Transportation, Public Transportation
Access - Landscape Ext. Design to Reduce Heat Islands,
Roof - Light Pollution Reduction
COOL ROOF
HIGH CUT-OFF LIGHTING
14LEED Approach
- Sustainable Sites 9 Points
- Common Points
- Alternative Transportation, Bicycle Storage
Changing Rooms - Alternative Transportation, Parking Capacity
- Stormwater Management, Rate or Quantity
- Stormwater Management, Treatment
- Landscape Ext. Design to Reduce Heat Islands,
Non-Roof - Light Pollution Reduction
- Project Points
- Site Selection
- Alternative Transportation, Public Transportation
Access - Landscape Ext. Design to Reduce Heat Islands,
Roof - Light Pollution Reduction
STORMWATER MANAGEMENT
15LEED Approach
- Water Efficiency 2 Points
- Common Points
- Water Efficient Landscaping, Reduce by 50
HIGH EFFICIENCY IRRIGATION
- Project Points
- Water Use Reduction, 20 Reduction
- Low Flow Fixtures
LANDSCAPE PLAN
16LEED Approach
- Water Efficiency 2 Points
- Common Points
- Water Efficient Landscaping, Reduce by 50
LOW FLOW FIXTURES
- Project Points
- Water Use Reduction, 20 Reduction
- Low Flow Fixtures
NO FLUSH URINALS
17LEED Approach
- Energy Atmosphere 8 Points
- Common Points
- Renewable Energy, 5
- Renewable Energy, 10
PHOTOVOLTAIC ARRAY
- Project Points
- Optimize Energy Performance 30 Above T-24 (4
Points) - Additional commissioning
- Ozone Depletion
HIGH EFFICIENCY EQUIPMENT
HIGH EFFICIENCY LIGHTING
18LEED Approach
- HIGH EFFICIENCY MEASURES
- Exceed T-24 by 20
- High Performance Envelope
- Low-e Glass
- High Daylight Factor
- Economical Insulation
- Energy Atmosphere 8 Points
- Common Points
- Renewable Energy, 5
- Renewable Energy, 10
- High Efficiency Mechanical System
- Low Kw/Ton Chillers
- VFD Fans Pumps
- Premium Efficiency Motors
- Occupancy Sensors
- High Efficiency Boilers
- High Efficiency Lighting System
- Effective Building System Controls
- DDC Controls
- Occupancy Daylighting
- Lighting Sensors
- Demand Control Ventilation
- Variable Exhaust System on
- Fume Hoods
- Project Points
- Optimize Energy Performance 30 Above T-24 (4
Points) - Additional commissioning
- Ozone Depletion
19LEED Approach
- Materials Resources 5 Points
- Project Points
- Construction Waste Management, Divert 50
- Construction Waste Management, Divert 75
- Recycled Content, Specify 25
- Recycled Content, Specify 50
- Local/Regional Materials, 20 Manufactured
Locally
CONSTRUCTION WASTE
RECYCLED MATERIALS
BIO BASED MATERIALS
20LEED Approach
- Indoor Environmental Quality 11 Points
- Project Points
- Carbon Dioxide Monitoring
- Construction IAQ Management Plan, During
Construction - Construction IAQ Management Plan, Before
Occupancy - Low Emitting Materials (4 Points)
- Adhesives
- Paints
- Carpet
- Composite Wood
- Indoor Chemical Pollutant Source Control
- Thermal Comfort, Comply with ASHRAE 55-1992
- Daylight and Views, Daylight 75 of Spaces
- Daylight and Views, Daylight 90 of Spaces
21LEED Approach
- Innovation Design Process 4 Points
- Project Points
- Educational Demonstration Facility
- Green Cleaning Housekeeping
- Fume Hood Commissioning
- LEED Accredited Professional
- 6 LEED APs on the Design Team
22West Los Angeles College Math Science Building