Performance Measures Used in the DFW Region - PowerPoint PPT Presentation

About This Presentation
Title:

Performance Measures Used in the DFW Region

Description:

North Central Texas Council of Governments. Relationship of Vehicle Density to Vehicle Speed ... North Central Texas Council of Governments ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 17
Provided by: nbet
Learn more at: https://www.ampo.org
Category:

less

Transcript and Presenter's Notes

Title: Performance Measures Used in the DFW Region


1
Performance Measures Used in the DFW Region How
to Track and Report the M O Investment and
Results
  • AMPO Management and Operations Work Group
  • September 28-29, 2006

2
Performance Measures Examples
  • Regional
  • Modeled and Observed
  • Freeway
  • Corridor
  • Observed
  • Freeway and Arterial

3
Congestion A Growing Problem
4
Blob Maps Parameters
  • Percentage of Roadways Congested (LOS D, E or F)
  • Model Output
  • 0 to 30 Percent, not Congested
  • 30 to 60 Percent, Moderately Congested
  • Above 60 Percent, Severely Congested

5
(No Transcript)
6
Congestion Map Parameters
  • Observed Data
  • Moderate or Intermittent Congestion (30 50 mph
    or 45 60 pcplpm)
  • Severe Congestion (lt30 mph or gt 60 pcplpm)

7
(No Transcript)
8
(No Transcript)
9
Relationship of Vehicle Density to Vehicle Speed
High
Speed of Vehicles
Low
Low
High
Density of Vehicles
10
(No Transcript)
11
(No Transcript)
12
Thoroughfare Assessment Program
  • Data Collection
  • System Analysis (including emission calculations,
    NCTCOG)
  • Recommend Improvements (timing plans and low-cost
    capital improvements)
  • Implementation and Fine-Tuning
  • After Assessment
  • Documentation of Results

13
Thoroughfare Assessment Program Performance
Measures
  • Travel Time Modeled/Observed
  • Delay Modeled/Observed
  • Number of Stops - Modeled/Observed
  • Average Speed Modeled/Observed
  • Emissions (VOC and NOx) Modeled/ Post-Processed

14
(No Transcript)
15
Truck Lane Pilot Study
  • Observed ITS Data
  • Speed, Volume and Lane Occupancy
  • Average Speed by Direction by Phase
  • Percent Change in Volumes by Phase
  • Average Speed by Lane by Phase

16
Next Steps for DFW
  • Continue to Develop Inventory of P.M.
  • Develop Regional Standard P.M.
  • Continue to Track and Gather Data
  • Develop a Regular Reporting Schedule
  • Document Benefits of Projects
Write a Comment
User Comments (0)
About PowerShow.com