Implementation of Flexible Mechanisms and EU ETS in Romania - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Implementation of Flexible Mechanisms and EU ETS in Romania

Description:

History. UNFCCC signed in 1992 at Rio Earth Summit. ratified in 1994 by Law 24 ... National Administration for Meteorology IPCC WG 1&2, impacts, National Comm. ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 13
Provided by: vla143
Category:

less

Transcript and Presenter's Notes

Title: Implementation of Flexible Mechanisms and EU ETS in Romania


1
Implementation of Flexible Mechanisms and EU ETS
in Romania
  • Mr. Vlad Trusca, UNFCCC National Focal Point
  • Ministry of Environment and Water Management
  •  SB 22 Side Event on JI, GIS and EU ETS in CEE
    Countries
  • - 25 May 2005 -

2
Overview
  • Institutional Arrangements
  • JI Co-operation and Projects
  • Priority Areas for Projects
  • Eligibility Criteria
  • Green Investment Scheme
  • EU ETS
  • Future Activities

3
History
  • UNFCCC signed in 1992 at Rio Earth Summit
  • ratified in 1994 by Law 24
  • Kyoto Protocol signed in 1999
  • ratified in 2001 by Law 3
  • Romania first Annex I country to ratify the
    Kyoto Protocol
  • Target 8 reduction of GHG emissions
  • Base year 1989
  • European Union Member State from 2007

4
Institutional Arrangements
  • Ministry of Environment and Water Management
    (MEWM) National Focal Point
  • Nat. Env. Prot. Agency GHG Inv., EU ETS
  • National RD Institute for Environmental
    Protection GHG Inventory, National Comm.
  • National Administration for Meteorology IPCC WG
    12, impacts, National Comm.
  • National Commission for Climate Change (NCCC)
    inter-ministerial consultative body coordinated
    by MEWM (Joint Implementation)

5
Romanias GHG Inventory
6
JI International Co-operation
  • MoU with Switzerland - 1999
  • MoU with the Netherlands - 2000
  • MoU with Norway - 2001
  • MoU with Austria - 2002
  • MoU with Denmark - 2003
  • MoU with Sweden - 2003
  • MoU with France - 2004
  • Host Country Agreement with the WBs Prototype
    Carbon Fund - 2003

7
JI Projects in Romania
8
Priority Areas for Projects (JIGIS)
  • Energy efficiency
  • Rehabilitation of district heating systems
  • Construction of co-generation installations
  • Recuperation of CH4 from urban waste landfills
  • Fuel switching in energy productive installations
  • Construction (or rehabilitation) of energy
    production installations (especially
    hydroelectric, geothermal, wind, solar, biogas or
    biomass)
  • Reducing GHGs emissions in agriculture
  • Afforestation and/or reforestation of land

9
Eligibility Criteria JI-track I IET
  • Party to the Kyoto Protocol
  • Assigned amount calculated (Art. 3, para. 7,8)
  • National system for estimating anthropogenic
    emissions by sources and anthropogenic removals
    by sinks of all GHGs (Art. 5, para. 1)
  • National registry (Art. 7, para. 4)
  • Most recent required inventory submitted annually
    (Art. 5, para. 2 and Art. 7, para. 1)
  • Supplementary information on assigned amount
    (Art. 7, para. 1), and any additions to, and
    subtractions from, assigned amount

10
Green Investment Scheme
  • Optional instrument securing the environmental
    benefits of the AAUs sales through IET
  • Bilateral agreements
  • Flexibility in activities and project eligibility
    (greening should be defined)
  • Bulgarian GIS Study relevant (one approach)
  • Less stringent greening not another JI type
    of mechanism
  • Contacts with potential buyers
  • Design of GIS in the NAPCC expected this year

11
EU ETS
  • Preparing the full transposition of the EU ETS
    and linking Directive
  • Establishing the institutional and procedural
    arrangements
  • Informing the future participants from the energy
    and industry sectors
  • Drafting the Ist and IInd NAP by mid 2006
  • Introducing a monitoring system
  • Setting up de ETS emissions registry
  • NEPA preparing the inventory of installations and
    starting the collection of emissions data

12
Future Activities
  • Adopting the National Strategy for Climate Change
    and preparing the National Action Plan on Climate
    Change
  • Increasing the institutional capacity
  • Preparing the methodology for JI-track I
  • Preparing the Ist and IInd NAP
  • Developing one or more GIS
  • Possible new co-operation with Japan, Canada, and
    Italy regarding JI and GIS
  • Thank you
Write a Comment
User Comments (0)
About PowerShow.com