Title: UK Beam Delivery System Project Overview
1UK Beam Delivery System Project Overview
Philip Burrows Queen Mary, University of London
- Linear Collider
- Accelerator Beam Delivery Collaboration
- (LC-ABD)
2 Brief LC-ABD history
- UK Govt. desire to strengthen research base new
funds - PPARC CCLRC strategic investment in accel.
science - Summer 2003 PPARC call for proposals
- PPARC peer review October 2003
- Final programme approved January 2004
- 9.2M PPARC 1.5M CCLRC (c. 20M)
- Programme duration 1 April 2004 31 March 2007
- All 23 new posts filled within first year
- 18 Ph.D. students attracted
- Major contributor to ELAN (2004) and Eurotev
(2005)
3LC-ABD Collaboration
- Birmingham Bristol
- Cambridge Dundee (was Abertay)
- Durham Lancaster
- Liverpool Manchester
- Oxford Queen Mary
- Royal Holloway University College London
- Daresbury Lab. Rutherford-Appleton Lab.
- Grahame Blair (PI), Philip Burrows (PM)
- Proposal 41 physicists (faculty, staff, research
associates) technical staff graduate students
- 23 new posts
4Summary of new research posts
5 LC-ABD Ph.D. students
- WP1 Carter, Mercer, Swinson
- WP2 Blakemore, Carter, Deacon, Malysheva,
Malton, Qureshi, Poirier, Price - WP3 Dale, Green, Moss
- WP4 Clarke, Gournaris, Malton, Molloy, Swinson
- WP5 Mercer, Scott, Shales
- Total of 18 students
6 LC-ABD Objectives
- Contribute significantly to ILC/BDS RD programme
- Collaborate with international partners (GDE,
Eurotev) - Build up UK infrastructure expertise in accel.
science - Train new recruits in accelerator physics
- Position UK for major contributions to ILC
engineering - build phases
7Project Overview
- Lattice design and beam simulations
(Angal-Kalinin) - Advanced beam diagnostics (Blair)
- Alignment and survey (Reichold)
- Final focus luminosity stabilisation and
spectrometry (Burrows) - e undulator, crab cavity system,
wakefields/collimators (Poole) - Underpinning infrastructure support (CCLRC)
- vacuum, RF, magnets, diagnostics, control,
electronics, DAQ - (SRS, ISIS, Diamond, ERLP accelerators)
8Project Management Structure
PPARC OSC
MAC
G. Blair (Principal Investigator) P. Burrows
(Project Manager)
WP2 G. Blair
WP1 D. Angal Kalinin
WP3 A. Reichold
WP4 P. Burrows
WP5 M. Poole
Task 1.1 D. Angal Kalinin
Task 5.1 J. Clarke
Task 4.1 P. Burrows
Task 2.1 G. Blair
Task 3.1 A. Reichold
Task 4.2 D. Miller
Task 5.2 A. Dexter
Task 1.2 J.Jones/G.White
Task 2.2 G.Doucas/A.Gillespie
Task 5.3 N. Watson
Task 2.3 I. Bailey
9Integration with Eurotev
Eurotev contrib. staff mo. 1322
Eurotev new staff mo. 361
staff months (2) 336 467 330 331 354 ------ 181
8
UK funding (kEuro) (1) 2583 3525 2219 2703 3772 2
50 15052
Work package Lattice design simulation Advanced
beam diagnostics Alignment and
stabilisation Lumi stabilisation/spectrometry Tech
nology Miscellaneous Total
1) Staff (ex. faculty, students) equipment
travel 2) All staff except graduate students
10Eurotev Project Organisation
11Training
- CERN Accel. School, USPAS
- Hands-on running beam at DESY, KEK, SLAC
- PAC03, EPAC04, PAC05, IEEE
- LCWS, MDI, BDIR, ILC workshops
- Adams and Cockcroft Institutes graduate lecture
series - Lancaster/Strathclyde Universities M.Sc. course
in RF
12Strategic Developments
- SLAC End Station A programme
- KEK ATF/ATF2 programme
- Beam dumps
13LC-ABD ESA Experimental Programme
- E166 polarised positron system tests
- Collimator wakefield tests (T480)
- Prototype energy spectrometer tests (T474)
- Feedback BPM tests in EM background environment
- Bunch length diagnostics Smith-Purcell
Electro-optic - (VXD EM interference tests)
14LC-ABD ATF/(ATF2) Experimental Programme
- Laserwire system
- Intra-train FB system (FONT) ring-extraction
FF - Alignment system (StaFF Eurotev)
- Cavity BPM tests (for energy spectrometry)
- Lattice design, BPM design, tuning knobs,
stability, operations - Contributions beyond currently approved programme
will require new funding gt 1/4/07
15What are we asking from you?
- Honest constructive feedback on how were
doing - Scope balance of current programme
- Level of achievement impact to date
- Strategic advice for remainder of current project
in context of BCD RDR - Strengthen any existing areas or collaborations?
- Take on new tasks? (eg. beam dumps)
- Guidance for ILC TDR phase 2007 - 2009
- Next proposal to UK funding agencies 1st half
2006 - ATF2, ESA