Title: NHS Standard Contracts Implementation Workshops 20082009
1NHS Standard ContractsImplementation Workshops
2008/2009
2NHS Standard ContractsWelcome to your
Implementation Workshop
3The SHA perspective on Commissioning Requirements
4System Management (Market Management/ Development)
- Improve commissioning leading to enhanced
provider - performance and better patient outcomes by
applying the system - levers of choice, better procurement and
contracting, competition - and corporate transactions (mergers, acquisitions
or joint - ventures).
5Roles and Responsibilities for System Management
6The Department of Healths role
With SHAs Co-design of system rules
- DH sets the rules of the system,
- via its responsibilities for
- Setting standards
- Allocating resources and setting prices
- The political interface
- Whole system oversight
- Cross-government and external co-ordination
7The SHAs role
With DH Co-design of system rules
- SHAs oversee and assure the system
- via their responsibilities for
- Leadership of the health economy
- Strategy and market structure
- Sanctioning variability
- Ensuring proper arrangements for PCT direct
provision - Performance management/accountability of PCTs
- Whole system performance
- Strategic communication
- Developing PCT capability
With PCTs Managing failure and market disputes
8The PCTs role
With SHAs Managing failure and market disputes
- PCTs build the system,
- via their responsibilities for
- Designing local incentives and drivers
- Driving quality in provision
- Contracting procurement
- Market development
- Delivering the choice offer
- Patient, public and market information
- Alignment with local partnerships
- Local sensitivity
With input from Patients Taxpayers
9The Providers role
- Providers
- deliver front-line care
- compete in the market
- innovate
- develop relationships with system managers and
- other providers
10South Central Approach
- Improving outcomes for patients is our primary
objective. -
- There are many mechanisms for achieving this
including market management. - In South Central we want to see a market that is
responsive to patient needs with diversity of
provision across all sectors. - We expect patients to be enabled to exercise
choice. - We expect there to be a vigorous programme of
contract specification and management based
around care pathways, with competition a major
factor. - We expect PCTs to focus on becoming world class
commissioners with relationships with providers
conducted through contracts. - Our expectation is that PCTs will functionally
collaborate to achieve these objectives.
11South Central Programme
- A joint programme between SHA and PCTs focused on
- Training and development (PCT leads group)
- Strategic development (Health Market Analysis)
- Guidance (dispute resolution, market guide,
provider separation) - Collaborative work (contract specification and
development) - Products (procurement portal)
- Assurance
12Our work on market developmentStrategic
Sourcing the method guides the selection of the
most appropriate change levers for each specific
case we are using this for Health Market
Analysis
12
13Contract Provider Improvement Project
Root Cause Analysis
South Central Hard Close Framework
Senior Comm. Deal Managers
Team Baseline Core training
Provider Operating Model
Contract Schedules Service Specs.
- single analysis providing a baseline for
targeting and, where appropriate, prioritisation
of contract negotiations
- Lay the foundation for strengthening 09 / 10
contract negotiations
- core training in provider management good
practice fundamentals negotiating
action-based-learning sessions for good practice
negotiation strategy development, negotiation
tactics and positioning. - Qual. review of approaches and skills to identify
progress as result of interventions of the
project (to include further recommendations for
the future).
- Support for PCTs on acute 08/09 negotiating
strategy development, advice and coaching during
negotiations and up skilling for PCT contracting
teams actions in addressing over performing
contracts utilising local and South Central
contract rules plus the single root cause
analysis (supporting negotiation strategies). - 08/09 benefits will likely be incremental
- Primary benefits 09/10 negotiations where
identified contractual and service issues will be
more addressable.
- A tangible and real model design on how best to
organise ourselves to deliver an area of common
priority such as the recent Stroke Rehab HMA fast
track and manage our acute providers
14Our work on contract development
- Community Contact
- Development of KPIs, Quality Outcome measures
for 4 key services - Health Visitors,
- District Nurses,
- Stroke Rehabilitation,
- Walk-in-Centres
- Draft service Specifications for the 4 services
- MH Contract inclusion of key measures from
Clinical Network
15- Acute Contract- there are lessons to be learnt
from the Acute Contract in terms of performance
management and strengthening of schedules
especially - Discharge protocols
- Delivery of 18 week Referral to Treatment to
include non consultant care - Patient Booking and referrals to include the
non availability of slots - Quality standards to include CQIUN
- Clinical Quality Performance Indicators and
Consequences - Performance Indicators and Consequence
- Information reporting for national and local
requirements - Serious Untoward Incidents and Safety Alert
Broadcasting System reporting - Reporting,
- Information Management
- Contract Challenges around Outpatient and
Inpatient activity - And where appropriate these need to be applied to
Community and Mental Health Contracts
16- Please note that all information regarding
Community and MH contract development is
published on a SharePoint site that can be access
via an N3 connection - If you would like to be added to the site to
access the information - Please contact
- Hilary.clark_at_southcentral.nhs.uk
17The NHS Contract for 2009
- The Policy in Context
- Jim Lusby
- DH Contract Development Lead
18The NHS is changing because the world is changing
The cost of new drugs is increasing
Quarter more over 85s by 2015
- Lucentis and Macugen
- NICE will rule this year on two treatments to
prevent blindness in people with AMD - These new drugs could cost the NHS between 60m
and 180m a year.
Rising consumer expectations
Diseases of modern lifestyles
19There has been unprecedented investment
By 2008 NHS investment will have trebled, but
20Weve established a comprehensive reform
programme
Better care Better patient experience Better
value for money
Choice Commissioning (demand-side reforms)
21History of Commissioning
- NHS has commissioned for over a decade, but
- Command control delivery model has
consistently reinforced the provider line - Commissioners have lacked robust levers
- Not all available levers have been used
- Inadequate regulatory regime bail out
- Low investment in developing commissioners
- Highly variable fragmented practice
- Lack of legitimacy (linked to voice patient
/public engagement) - Very limited range of providers
22Re-launching Commissioning
- Commissioning Framework (July 06)
- Practice-Based Commissioning Guidance (November
06) - Interim New NHS Contract (December 06)
- Care and Resource Utilisation demand management
(December 06) - Commissioning Framework for Health, Care
Well-being (March 07) - A Vision for World Class Commissioning (Planned
for December 07)
23Approach to Contracting
- The need for a NHS contract was introduced with
in the Commissioning Framework, July 2006 - It has the main tool for achieving accountability
and improving performance in a system with more
autonomous providers - It is legally-binding for NHSFTs, the IS and
Third Sector - Recognises need for greater focus on services
provided away from acute hospitals
24Learning from the Acute Contract
- The interim contract was generally well-received
- Co-ordinating commissioner arrangements are
broadly right - The contract is a useful as a framework across
the NHS to support consistent behaviours - Each set of parties felt that the risk was
unfairly weighted against them - Very few participants were able to describe
accurately the levers and sanctions in the
interim contract - In a number of cases mandatory elements of the
contract were deleted during negotiations
25Learning from the Acute Contract
- There was not enough time to prepare and
implement properly - Greater clarity is need on what is mandatory and
what is negotiable - The roles of the SHA, PCT, Co-ordinating
Commissioner and associates need to be clearly
described - The Co-ordinator / Associate role needs to be
developed around a binding standard consortium
agreement, supported by clear and consistent
guidance - The legal language needs to be simplified and
explained - The implementation arrangements and guidance need
to be significantly improved
26Current Status
- Contracts for Mental Health and Learning
Disabilities, Ambulance Services, Community
Services are due for publication in the autumn. - Some elements remain to be concluded and we are
continuing to seek stakeholder views - Todays presentations on the contracts structure
and controls represent current thinking and
proposals - Further implementation support events will be
scheduled after the publication
27NHS Standard Contract
28Context
- CSR07 average 4 real terms growth over three
years, compared to 1.9 for total public
expenditure - Three Departmental Strategic Objectives
Promoting Better Health Well-Being For All
(PSA) Ensuring Better Care For All (PSA) Better
Value For All - Contribution on six PSAs led by other Departments
29Four Strands
- Priorities Freeing up the front line while
maintaining a focus on the issues of most concern
to the public. - Enablers Developing world class commissioning
and using reform levers to help transform
services. - Financial regime A framework that fully
supports reform goals and incentivises
improvements in services and choice. - Business processes A business-like and
transparent approach to planning and management
of risk
30Process and Stakeholders
- DH process up and running, led by David Flory and
overseen by the NHS Management Board - Stakeholders will be fully engaged Monitor,
Healthcare Commission, NHS Confederation etc - Important links with Department of Communities
and Local Government (LAAs)
31Priorities
- Will need to take account of
- PSAs
- Existing commitments
- LAAs
- Direction of travel
32Priorities
- Aim will remain the creation of greater local
freedom for PCTs to respond to local need and
expectations, coupled with clear accountability
and continued focus on national priorities. - Increasing focus on outcomes
- Better Health For All Life expectancy,
inequalities, smoking, mental health, independent
living - Better Care For All 18 weeks, HAIs, access,
LTCs, maternity choice, patient satisfaction
33Enablers
- Incentives and levers
- Compliance and assurance programme
- Public and patient empowerment
- Workforce
- New models of care/NHS Next Stage Review
- IMT
- CQUIN
34Financial Regime
- Confirmation of PCT allocations
- Expectations on efficiency drivers Better Value
Strategic Objective - Clarification of other planning assumptions
35Business Processes
- Need for increasingly business-like and
transparent approach to planning. - Better alignment of NHS and LA planning
processes. - Clarification of the roles and responsibilities
of each part of the system. - Timetable for local plans to be agreed and
confirmed.
36CQUIN
- Update on Commissioning for Quality and
Innovation - 10.20 - 10.50
Simone Bayes Siobhan Jones
Simone.Bayes_at_dh.gsi.gov.uk
Siobhan.Jones_at_dh.gsi.gov.uk 020 7210 5445
020 7210 5995
37We want to make quality and innovation part of
the commissioner-provider discussion everywhere
- The Next Stage Review set out visions for high
quality services and new measures to enable and
support the NHS to increase quality - There are many good local and regional quality
improvement initiatives in the NHS - In some places, these already bring quality
improvement and innovation into commissioning
discussions. However, we know this good practice
is inconsistent - Several places in UK and internationally are
successfully using incentives to improve quality
we want to make it easier it do this in the NHS
- A new national framework aims to support and
embed a cultural shift by making quality and
innovation part of the commissioner-provider
discussion everywhere - This will be a developmental process which will
embed quality as a priority for organisations and
their Boards, so there are real improvements in
quality of care for patients in the long term
38Development of the CQUIN payment framework has
been based on the four principles of NSR
implementation
- The emerging principles of CQUIN have been
developed through discussions with NHS colleagues
on their experience - The development and agreement of local CQUIN
schemes will depend on commissioners and
providers working together to drive quality
improvement and innovation, supported by SHAs - This is a developmental journey. Nationally and
locally we should learn lessons from the first
year to inform future development
CO-PRODUCTION
- Local CQUIN schemes will need to be developed
with clinicians and use clinically meaningful
indicators as demonstrated by similar schemes
already running successfully eg in the North West
LOCAL CLINICAL ENGAGEMENT
- The framework has explicitly been designed to
allow good existing work to continue and develop,
and with as much flexibility as possible, within
a few broad national parameters, where NHS
colleagues have advised they are needed
SUBSIDIARITY
- The CQUIN payment framework will help embed
quality as the organising principle, bringing it
into commissioning and contracts - It aims to reinforce the Quality Framework and
will help PCTs demonstrate their World Class
Commissioning competencies
ALIGNING SYSTEM ARCHITECTURE
39A CQUIN payment framework will be just one part
of a comprehensive approach to quality and
innovation
Approach to deliver high quality care throughout
the NHS
Define
Measure
Publish
Reward
Improve
Regulate
Innovate
Changing the way standards are created and set by
expanding NICE so it selects the best standards
available, or fills the gaps, and runs a new NHS
Evidence service
- Quality Metrics across service line (Patient
experience and patient related outcomes) - Clinical dashboards for teams
- Initial metrics being developed for the 2009/10
NHS Operating Framework
- All providers of NHS services will publish
Quality Accounts from April 2010 - Comparat-ive information on NHS choice
- New Commission-ing for Quality and Innovation
(CQUIN) payment framework - Multi-year tariff projections, tariff for mental
health
- Strong role for regulation by the Care Quality
Commission. Annual report to Parliament - Regulation to be extended to primary care for
first time, in time extended to dental practices
- Stronger clinical engagement in commissioning
- Medical Director Clinical Advisory Board at
every SHA - Quality Observatory in every region
- National Quality Board
- Best Practice Tariffs programme from 2010/11
- SHAs to promote innovation, new fund, and prizes
- Health Innovation Education Clusters
- Academic Health Science Centres
40The Darzi review said a proportion of provider
income will be made conditional on quality and
innovation
Health communities will develop local schemes
within broad parameters set out in a national
Commissioning for Quality and Innovation (CQUIN)
payment framework
LOCAL ROLE
REGIONAL ROLE
- Given their market management and assurance role,
SHAs may have a role in supporting PCTs in
setting fair and transparent goals. - When established, Quality Observatories may help
support PCTs in developing local schemes. - Any disputes between PCTs and providers would be
resolved through existing resolution processes in
place for contracts.
- Local CQUIN schemes will be developed by the lead
PCT for each provider taking into account views
of Associate PCTs. - Lead PCTs will identify local priorities and
agree with the provider appropriate goals as part
of contract negotiations. - The lead PCT will need to clarify the roles and
responsibilities locally, and consider who they
may wish to involve in developing their local
scheme e.g. patients.
NATIONAL ROLE
- DH sets the framework for local flexibility to
ensure transparent mechanisms - Support learning on a developmental journey eg
optional exemplar scheme(s)
41PCTs should choose the indicators for CQUIN in
discussion with providers
- AREAS OF QUALITY
- The national CQUIN framework will align with the
Quality Framework, focusing on three elements of
quality - safety,
- effectiveness (including clinical outcomes and
PROMs), - user experience
- Local CQUIN schemes should reflect these three
areas and also recognise innovation. -
Innovation
- CHOOSING INDICATORS AND GOALS LOCALLY
- Where nationally standardised definitions exist
PCTs should use these (levels 1-3). - If national definitions do not exist, PCTs may
choose to experiment and develop new indicators
in agreement with providers (level 4). - Goals should be stretching but realistic
1
42Income will depend on quality - rather than
paying more for quality. The amount affected is
likely to grow
- Uplifts in contract value will be calculated to
create funds for CQUIN at PCT level improvement
will be integral to what PCTs pay for - The size of the incentive will be decided
nationally - probably around 1-4 of contract
value, based on the limited international
evidence - We expect it will start small perhaps 0.5 or 1
in the first year. As people become familiar with
the scheme, the percentage will increase,
building on the feedback from experience and the
evaluation
SIZE OF INCENTIVE
OPTION OF ADDITIONAL MONEY
- Allowing provision for additional money could
help make CQUIN a stronger incentive and allow
reward for very challenging goals - PCTs would decide whether to offer additional
money, and how much
- A payment schedule will need to be agreed
locally. - PCTs could pay some or all of the CQUIN money in
anticipation of most goals being met, as they
should be realistic as well as challenging. This
will ease cash flow and support good
relationships. If goals are not achieved, later
payments could be stopped or adjusted later. The
timing of final adjustments will be affected by
how fast reliable data is available
FREQUENCY OF PAYMENT
43How will local CQUIN schemes work in practice?
There will be a number of steps in developing the
local schemes. Several of these will take place
simultaneously, as part of the contract
negotiations.
- Develop a local scheme
- Agree local roles, responsibilities and who to
involve - Commissioner and provider agree priority areas to
improve, indicators and realistic improvement
goals - Agree overall scheme and how payment will reflect
the indicators
- Monitor and manage scheme
- Make payments
- Review progress against goals
- Make sensible assessment of performance and
reconcile payment - Review the scheme
Publish scheme
44We have engaged with a range of NHS and
independent sector colleagues. Clear principles
are emerging
The Commissioning for Quality and Innovation
(CQUIN) payment framework will make a proportion
of a providers contract value conditional on
local quality improvement and innovation goals
- PCTs should agree local schemes with all
providers on national contracts. Goals in local
CQUIN schemes should be stretching but realistic
and draw from established indicators - Initially, PCTs may wish to focus more on
incentivising improvement in data collection on
quality. From the second year, PCTs should start
to consider including quality goals in their
local scheme, focusing on improvement over time - Local CQUIN schemes can be used to support
existing quality improvement initiatives and
innovation, and show World Class Commissioning
competencies - Local CQUIN schemes should be published showing
both the achievement against previous goals, and
the promised goals for the forthcoming year - It should apply to all service types covered by
national contracts - High Quality Care for All made clear this would
begin from 2009/10
45The CQUIN framework should apply to all service
types covered by national contracts
- The principle that a providers income should
reflect quality should not be limited to just one
sector. The CQUIN payment framework will apply
to services covered by national contract i.e.
acute, community, mental health and ambulance
services. - Following feedback from the NHS, we now think
that introducing CQUIN in all sectors at the same
time may stretch PCT commissioning capability and
capacity too far. Therefore, we suggest that
CQUIN is mandatory for acute in 2009/10, and
optional for community, mental health and
ambulance services. - In primary care, there are existing incentive
schemes, in particular the Quality and Outcomes
Framework for GPs, which we do not want to
duplicate.
- Concerns raised
- This will be hard for PCTs to do
- Phase changes dont require people to do
everything at once and first, get new contracts
right - Large number of providers if do for all sectors
simultaneously do PCTs have capacity to agree
schemes with all from scratch? - For many areas of quality, data and information
systems are less developed than in acute
2009/10 Mandatory Acute Optional Ambulance,
Community Mental health
2010/11 Mandatory Acute, Ambulance, Community
Mental health
DO YOU AGREE?
46We want your help answering some practical
questions about how the CQUIN payment framework
will work
- Who will drive the scheme locally?
- How do you encourage discussions on quality
improvement now? How will you use CQUIN to
complement this - What do you see as the SHA role?
- What would you want DH to do to support the use
of CQUIN? - What benefits do you think CQUIN will bring?
- What risks and barriers do you foresee? How can
they be managed? - Who will be involved in PCTs in developing and
implementing local CQUIN schemes? - Should CQUIN be optional or mandatory for mental
health services in 2009/10? - Please tell us if you already have local
financial incentives on quality
47Coffee Break
48NHS Standard Contract
- Aims and Principles of Contracting
49What is the Contract?
- The NHS Standard Contract, will cover agreements
between PCTs and providers for the delivery of
NHS Funded Care - Is legally binding
- It has a default duration of 3 years. Guidance
will be issued to enable shorter or longer
contract periods. - The contract will recognise and allow for
Partnership Commissioning (under S75 NHS Act 2006
and S10 Children Act 2004 - Providers can be Foundation Trusts, NHS Trusts,
Care Trusts, Independent Sector and Third Sector.
50Key Principles of a legal contract in the NHS
- Legally Binding
- Fair and equitable
- Encourage a partnership
- Practical Future-proof
- Embrace policy
- Provide for remedy before penalty
- Mandate in order to maintain NHS principles
- Allow as much local agreement as is practical
- Keep as simple as possible
51Why stand-alone standard NHS TCs?
- To supports NHS principles, values and standards
and the NHS Constitution - To provide a consistent minimum fair playing
field and prevent some contracts being unfair
compared with others - To simplify and focus the contract negotiation
- To avoid nationally-required generic changes
having to be executed through multiple contract
changes - To remove the bulky legal and boiler plate
elements from the procurement
52Who will use the new Contract
- The Contract will apply to agreements from
2009-10 as follows - All NHS Trusts and Care Trusts
- Foundation Trusts
- New FTs and existing FTs whose contracts expire
in March 09, are required to adopt the new
Contract for 2009/10 onwards. - FTs with contracts which extend beyond March 09
may adopt the new Contract or retain their
existing contracts until the required notice
period passes. - Independent Sector and Third Sector Providers
- The contract is designed for use by IS and Third
Sector providers whose contracts expire at the
end of 2008/09.
53Contract RelationshipsStakeholder Principles
- The contract should
- Reflect vision, long term planning and change
- Recognise the community interest
- Provide clarity on commitments that need to made
to stakeholders - Clarify and define respective roles and
responsibilities - Recognise that open information is required from
both parties to manage the contract - Underpin a relationship between equals
- Understand mutual dependency and benefit of the
parties in aiming for a partnership approach - Support co-operation and collaborative behaviours
that benefit both parties and cement the positive
relationship between them. - Be based on terms that are deliverable in practice
54Contract RelationshipsExpected behaviours
- Find and support win-win solutions
- Achieve appropriate risk sharing, and sharing of
any benefits that are realised by mutual effort - Maintain mature, regular dialogue within a
professional code of conduct - Ensure flexibility where there are genuine
problems in delivery - Provide incentives as well as penalties
- Recognise investment required to achieve
requirements over a reasonable time period - Support providers to change their service offer
over time in relation to changes brought about
through patient choices - Maintain honesty and transparency across both
parties and with patients and the public
55Main Features Heads of Terms
- Standard terms and clauses the boiler plate
- Activity planning and review
- National v Locally-agreed quality standards
- Local Developmental Quality Standards
- Requirements on information flows and provision /
Data Quality Improvement Plans - Bi lateral and Multi Lateral Contracts will be
available to Commissioners - Dispute resolution arrangements
- Contractual Control mechanisms
56Structure of the Contract
57Draft Standard NHS Terms and Conditions
- Definitions and Interpretation
- NHS Principles and Values and Constitution
- Services Environment, Vehicles and Equipment
- Emergency preparedness, Business Continuity Plan,
Duty of Partnership - Prices where PbR applies and Payment
- Representatives
- Consent
- Complaints
- Staffing and Employment issues
- Emergencies Urgent Care
- Death of a Patient
- Reporting, Analysing Learning from Patient
Safety Incidents - Quality
- Transfer and Discharge Obligations
- Governance and Transaction Audit
- Patient Health Records
- Confidential Information
- NHS Branding and Promotion
- Pastoral and Spiritual care
- Discrimination
- Dispute Resolution Procedure
- Monitoring
- Performance mechanisms (including mechanisms for
retention of payments) - Suspension and Termination (including partial)
and Consequences - Remedies
- Inducements to Purchase
- Variations
- Representations and Warranties
- Notices
- Force Majeure and Major Incidents
- NHS Counter Fraud and Security Management
- Third Party Rights
- Waiver
- Assignment and Sub Contracting
- Exclusion of Partnership
- Non-solicitation
- Costs and Expenses
- Governing Law and Jurisdiction
Click to edit Master title style
Click to edit Master title style
Click to edit Master subtitle style
Click to edit Master subtitle style
58Structure of the Contract
59Draft must-have elements for local negotiation
- Consortium agreement between Co-ordinating
Commissioner and Associates - Pricing local agreement of non PbR
- Activity Plan and Review,
- Care pathways and Capacity review
- Commencement and Duration, and Contract Review
- Information flows and reporting provisions
- Service specifications and requirements
- Service Improvement/Development
- Clinical Networks and Screening Programmes
- Serious Untoward Incident and Patient Safety
Incident Reporting - Service Targets/indicators
- Information Audit
- Demand Management requirements including prior
approval and utilisation management - Termination clauses local elements
- Quality Standards Nationally required and
consortium level - Retention of payments thresholds / ranges
- Performance - indicators, thresholds / ranges
60Structure of the Contract
61Elements Entirely for local agreement
- Examples might include
-
- Additions to specific service care pathways
- Local care/treatment protocols
- Performance and quality incentive schemes
- Locally agreed additional Quality Standards
- Locally identified additional information
requirements
62NHS Standard Contract
63Key Clauses
- Clause 2
- Commencement, Duration, Transition
- Sets the contract term
- 3 years is default
- DH will provide guidance where longer or shorter
contracts may be appropriate - SHA will approve all contract lengths that are
not 3 years - Clause 4 Schedule 2 (Service Specification)
- Services
- Obliges the Provider to supply Services
- Service Specifications (Sch2,Pt1 for local
definition) - Activity Plans (Sch3,Pt1, annex1 standard
format, locally completed) - Quality Standards (Sch3,Pt4A Pt4B some
mandated, some local) - The Law
64Key Clauses
- Clause 7
- Prices Payment
- Obliges the Commissioners to pay for the Services
provided - At the agreed price at tariff and non-tariff
items - Details payment terms
- 1/12th of the Annual Contract Value on 15th each
month - (This is only obligatory if the Provider has
issued a valid statement of account) - Within 30 calendar days of receipt of invoice for
NCA - Within the terms of the Compact (applies in the
main to small third sector organisations) - Reconciliation of payment rules.
- What to do in the event of a dispute
65Key Clauses
- Clause 8
- Review
- Obliges the Commissioner and Provider to review
the contract including - The Activity Plan
- The Annual Contract Value
- Operating Framework requirements
- The locally agreed Schedules
- Performance (including notices)
- Compliance with Quality, Clinical Governance
Demand Management - Complaints, incidents and SUIs
- Information
- Sets out the requirement to plan the following
years activity together
66Key Clauses
- Clause 16
- Quality
- Specifies the standards to which Services must be
performed - The Law
- Good Clinical Practice
- Good Healthcare Practice
- Clinical quality development plans
- Standards and recommendations of other bodies and
reports (Standards for Health/National Minimum
Standards, SUI reports, NICE) - Obliges the Provider to have regard for any DH
guidance - Requires the publication of an annual clinical
quality review (this will become this Quality
Accounts)
67Key Clauses
- Clause 28
- Dispute Resolution
- Describes the Parties rights and obligations
when in dispute - The obligation to try and resolve internally
- Escalation to the SHA / Monitor if agreed
- Escalation to CEDR
- CEDR mediates the dispute in line with Schedule 9
Dispute Resolution Procedure - If after 20 operational days agreement is not
reached, agreement will be by Independent Binding
Pendulum Adjudication - The Parties still retain their rights to
terminate the contract with 12 months notice
(subject to Mandated and Essential Service
obligations) - NOTE Disputes between PCTs and NHS Trusts will
be arbitrated by the SHA, not CEDR
68Key Clauses
- Clause 29
- Information Requirements
- Describes the Data Quality Improvement Plan
- Links to Schedule 5 which details the
Information requirements - Sets out the consequences of not supplying
information - The commissioner must demand the information
formally, in writing and stating that retention
will occur if information is not supplied - The Provider will have 5 days to comply
- If the Commissioner(s) actions have caused the
failure the Provider cannot be held accountable
69Key Clauses
- Clause 32
- Performance
- Describes the performance management
system/process - Provides for remedy before penalty
- Exception Report (to Board, Regulators, SHA) may
be the biggest consequence
70Key Clauses
- Clause 33
- Clinical Quality Review
- Describes the clinical review process
- Links to Schedule 3 Part 4A
- Clinical Quality Performance Indicators sets out
- The indicators (some mandated, some for local
agreement) - Thresholds
- Consequences and
- measurement methodology for Nationally mandated
and locally agreed - Aims to expose, investigate and rectify
- Penalties are only for failure to implement a
rectification plan (regardless of whether it
rectifies the breach) - Is a closed-loop control system for continuous
improvement
71Key Clauses
- Clauses 34 35
- Suspension Termination
- Allow the Co-ordinating Commissioner to suspend,
terminate or partially suspend of terminate. - The partial element is of a Service or a part
of a Service - Allows for restoration of suspended services
- Allows for parties to terminate just because they
want to (only after year one and with 12 months
notice) - If a Provider is in breach of contract it has 60
days from notification to remedy before it is a
termination event - The Provider will be obliged to continue
Mandatory Goods and Services and Essential
Services
72Partnership Arrangements
- Key new section in the contracts
- Arises from S75 NHS Act 2006 and S10 Children Act
2004 - Trigger clauses will be put in place to cover
the commissioning partnerships and separate
trigger will be put in to cover provider
partnerships. These will act as a sign post to
the Partnerships Schedule - New Schedule (written but under review) drives
the process - Both Provider and Commissioner S75/S10 agreements
to be documented within the contract (Sch 11) - If there is not a commissioner or provider
partnership the provisions of the contract
referencing the arrangement will not apply
73Controls and levers in the contract
- A contract enables parties to agree rules and
sets out the methods for dealing with and the
consequences of failure. - Parties can resolve issues without resorting to
the contract but the contract sets the boundaries
in a clear and agreed form. - If a party breaches a contract where there are no
levers then the other party has only two choices
ignore the breach or terminate. - Where services, especially clinical services, are
concerned there are contract targets which
dictate the level of service that is to be
provided. The contract levers allow this to be
monitored and for appropriate corrective measures
to be agreed. - Where failure occurs defined consequences act as
a reasonable deterrent where termination my be
unreasonable or impossible.
74Purpose of Controls
- Clinical
- To improve performance
- To engender continuous improvement
- To mitigate failure to implement agreed change
(not failure to hit targets) - Non-Clinical
- To mitigate poor performance
- To provide risk, not certainty of penalty
- To increase commissioner control over spend
- Performance priority
- To underpin delivery of key national policies and
targets - To ensure consistency and fairness
- Termination
- To ensure Patients and the NHS is protected from
poor contractors
75Summary
- Contract controls provide a framework for
improvement - Consequences are based on a failure to act or
implement agreed action plans and not the breach
itself - Most indicators (clinical or otherwise) will be
for local agreement - Some consequences will be for local agreement
DH will provide guidance - The control mechanisms protect both parties
- Risk to organisational reputation may be a
significant consequence both to the organisation
(in the eyes of the patients/service users) and
the individual officers (professionally) - The regimes are constructed in a spirit of
co-operation not penalisation - Termination remains the ultimate sanction
76Preparatory Steps (within the contract)
- There are a number of things that you can do now,
in advance of the publication of the full
contract - Governance
- Quality requirements
- Pricing structure
- Service Specification
- Activity and Volumes
- Information requirements (want, need, actually
get)
77Preparatory Steps (outside the contract)
- There are a number of things that you may need to
address out side the strict confines of the
contract which will help - Partnership arrangements
- Organisational fitness/competencies
- Information requirements (want, need, actually
get) - Forthcoming plans (service developments or
commissioning needs - Build on your relationships
78 79 80NHS Standard Contract
- Afternoon Breakout Groups
- 13.30 - 14.45
81SHA Contract workshopsNHS Standard Contract for
Community ServicesCraig Porter
82Primary and community care strategykey themes
- Not a national blueprint
- Setting a clear vision
- and creating the right environment for leading
local change
Shaping services around individuals
Promoting healthy lives
Continuously improvingquality of care
Clinical leadership
World class commissioning
Patient power and choice
83Primary Community Strategy clinical service
improvement areas
- Services for Staying Healthy
- Services for Children and families
- Acute care Services in the community
- Services for Long Term Conditions
- Services for Rehabilitation
- End of Life Care
84(No Transcript)
85Working Group Membership
- NHS Confederation Primary Care/FT Network/IS
Network - 3rd sector umbrella organisations
- SHAs
- PCT Commissioners Providers
- DH reps
- Social Enterprise providers
86Scope of community services contract
2
1
4
3
Out-Patient care
In-Patient Care
Community drop-in
Domiciliary Care
Includes Rehabilitative and palliative care in
community hospitals, hospices, nursing or
residential homes
Includes therapy services such as physiotherapy
and podiatry as well as district nurse clinics
diagnostics.
Includes specialist services such as family
planning health visiting
Includes home visits by district nursing,
occupational therapy, community midwifery and
health visiting.
Community Services
87Aims, Strategic Links and Potential Barriers of
Community Services Contract
Strategic Links
Aims
Potential Barriers
Next Stage Review including Primary Community
Services Strategy System Management 3rd
sector SE Programme Wider programme re.
community services development Links to CQC re
standard setting, monitoring and response to
failure.
Wide scope of coverage Cross-departmental
approach for Section 75 agreements Joint
approach to be agreed with DCSF re. childrens
services, Legal agreements already in place with
non-NHS bodies may delay implementation Current
lack of standards/ targets in relation to quality
and activity Community MDS not in place, metrics
not yet available for majority of services
Flexibly support innovative commissioning
approaches Improve care outcomes, Catalyst to
maximise quality and productivity Support both
joint commissioning pathway based
care Develop benchmarking.
88Potential Contract Routes for Community Services
(1 of 2)
Commissioner
Option 1
Benefit Reflects most common current practice
with commissioner contracting on an
organisational basis with each provider therefore
easy to implement
Option 2
Commissioner
Lead provider for geographical area
Benefit Could reflect PBC or local approach with
Local Authority with one provider accountable to
commissioner
89Potential Contract Routes for Community Services
(2 of 2)
Option 3
Commissioner
Benefit Commissioner / provider split is
maintained, and commissioner retains full control
of commissioning care
Strong Commissioning
SINGLE CARE PATHWAY
Commissioner
Benefit One provider retains clinical and
financial responsibility for the patient, as well
as accountability to the commissioner
Option 4
Lead provider
SINGLE CARE PATHWAY
90Structure of the Contract
91Key Features
- Service specification template
- To be used for providers of all sectors
- 3 year duration as a norm
- Bi-lateral or multi-lateral basis
- Care pathways, lead providers
- Partnership arrangements
- Incorporates 18 weeks/PBR etc where applicable
- Flexible payment arrangements where appropriate
-
92Testing
- At least 2 contractual relationships tested in
each SHA - 3 phase,10 week test period
- Flexible focus
- Section 75, Care Trusts, 3rd Sector, IS
- Open consultation
93Learning from Testing
- Generally positive
- Grants or contracts?
- Which contract?
- Internal providers
- Capacity capability of both parties
- Maturity of relationships
- Surplus
- Terminology to embrace integrated health social
care
94Stakeholder Principles
- The contract should
- Reflect vision, long term planning and change
- Recognise the community interest
- Provide clarity on commitments that need to made
to stakeholders - Clarify and define respective roles and
responsibilities - Recognise that open information is required from
both parties to manage the contract - Underpin a relationship between equals
- Understand mutual dependency and benefit of the
parties in aiming for a partnership approach - Support co-operation and collaborative behaviours
that benefit both parties and cement the positive
relationship between them. - Be based on terms that are deliverable in practice
95Service Specification Template
- Aim provide shared understanding of contracted
service - NOT an operational policy
- Aims, population served, fit within whole
system - Local prices performance measures
- Additional specified measures for block contract
prices - Guidance via template re. service specific issues
e.g. Children, end of life care, community
hospitals
96Quality Performance
- Applicable national targets
- Patient experience
- Unplanned admissions
- Reducing inequalities
- Improving productivity
- Waiting times
- Assessment care planning
- Care management
- Outcomes
- Activity monitoring
- Costs prices
- Continual service improvement
97Moving to outcomes
98What we mean by currency
Fee for individual service
Per period - eg year of care
Per patient pathway
Per case diagnostic/ procedure
Per day
Block budget/ grant
Per head - capitation
There are pros and cons to any point along this
spectrum
ENTIRELY AGGREGATED
ENTIRELY ATOMISED
What does it look like?
For what is it used?
99How currencies are developed
100Who does what by when?
- Department of Health
- Nov 08 currency and pricing framework published
- Dec 08 Core MDS identified for approval
- April 10 small number of national currencies
developed ready for implementation - April 09 Evaluation of PbR for community
services begins - NHS
- Dec 08 local currency and pricing development
begins - April 09 limited implementation of currencies
and prices (PbR) - April 10 adoption of nationally developed
currencies (pricing local?) - April 11 widespread implementation of locally
developed currencies and prices
101Contact Details
- Tracy.cannell_at_dh.gsi.gov.uk
- Craig.porter_at_dh.gsi.gov.uk
- Contract web page
- http//www.dh.gov.uk/en/Managingyourorganisation/C
ommissioning/Systemmanagement/DH_085048
102 103New NHS Contract For 2008 and beyond
- Closing remarks and
- Planning for the next workshop
104New NHS Contract For 2008 and beyond
- Thank you for attending
- Please hand in your badge at the event desk for
recycling