Title: Installation


1

Installation Access Control
GySgt
Hunziker L.J.
Security Division, HQMC

2
Overview
  • Goals and Objectives
  • Requirements
  • Policy
  • Main Issues
  • Significant Changes


3
Goals and Objectives
  • Release Physical Security Policy
  • MCO 5530.14A/NAVMC 5530.14
  • Update IG Checklist
  • Publish a Holistic, Enterprise Access Control
    Policy
  • Implement Additional Training Program
  • Installations Access Control/ Gate Designs
  • Complete Flight Line Security Concept Upgrades
    at Six Installations

4
Where Are We Now?
  • Installations have inadequate Entry Control
    Facilities. Most sites have issues with
  • Design
  • Placement
  • Encroachment
  • Base Population Increase
  • Lack of Infrastructure
  • Throughput
  • Security
  • Age

5
Access Control
  • Success Enterprise solution for all Marine
    Corps installations
  • Key Requirements
  • Expedite entry of Authorized Personnel
  • CAC, Teslin, DBIDS Card Members
  • Commonly Accepted Third Card (DBIDS)
  • Contractor/ Visitor Vetting
  • Wants/ Warrants
  • Terrorist Watch List
  • FBI
  • DEERS Rapids
  • Pedophile/ Sex Offender Registry
  • COPS/ CLEOC/ SFIMS

6
Installation Access Control
  • Primary Requirement is to Provide Secure,
    Streamlined Access for
  • Military, Civilian and Contractor Support
    Personnel
  • Regular Vendors, Suppliers and Service Providers
  • Visitors

7
Access Control System Requirements
  • Streamline access for authorized personnel by
    verifying and validating identity
  • Triage personnel who are not preauthorized via
    available DoD and Federal databases according to
    base policy
  • Increased gate throughput
  • Adequate operational availability reliability
    of access system
  • Reduced level of manual intervention
  • User friendly
  • Accommodate visiting personnel/vehicles
  • Automatically receive/verify commercial delivery
  • Secure data entry, storage, and retrieval
  • Modular and scalable

8
Combined Effort
  • HQMC
  • Security Division
  • C4
  • Installations and Logistics
  • Programs and Resources
  • Bases and Stations
  • Provost Marshal Office Physical Security,
    Accident
  • Investigation
  • G3 Ops ATOs, Future Plans
  • G5 - Public Works, ROICC
  • G6 Communications

9
Combined Effort
  • Plan for Future Technology (technology insertion
    will be a phased approach)
  • Provide Infrastructure for technology
    (equipment)
  • Power
  • Connectivity (voice and data)
  • Space for equipment
  • Empty conduit with pull wire for current and
    future equipment installations
  • Consideration for technology insertion in layout
    and traffic studies

10
Access Control Policy
  • Common Access Card (CAC) designated by policy
  • as the Primary Access Control Token
  • HSPD-12
  • FIPS-201
  • DoDD 8190.3
  • DoD 5200.8-R
  • MARADMIN 056/07 AND MARADMIN 612/07
  • COTS Systems and Products

11
Access Control Policy
  • Naval Message 020946Z OCT 07
  • Primary Token
  • Mandatory Compliancy (MCESS), Others Must Plan
    to Migrate
  • Access Control Policy Requirement Message
    (NORTHCOM)
  • 051717Z Dec 07
  • Interim Access Control Guidance (PS)
  • Visitors and Contractors
  • Draft (Comments - Due 15 Feb 08)
  • Access Control Requirements Document
  • Draft (Pending Release)

12
Future Vision
  • Clear and Definitive Policy
  • Services
  • DoD
  • Enterprise Solution
  • Funding
  • Program Management

13
Main Issues - Funding

14
Other Factors/ Influences
  • Increase in Force Protection Conditions Creates
    Traffic and Security Nightmares
  • BRAC
  • Joint Basing
  • 202k Increase
  • DoN/ NORTHCOM/ Service/ DoD

15
Significant Changes
  • Electronic Security System Information
    Management System (ESSIMS)
  • Full Project Management Database
  • Regionalize/ Consolidated Dispatch Centers
  • E-911
  • NERMS
  • CERS
  • Flight Line Security Enhancements
  • Ground Based Radars
  • ULRTI, LRTI, MRTI
  • E-TASS

16
Points of Contact
  • Mr James M. Cain Program Manager
  • Comm (703) 695-7203 DSN 225-7203
  • Email james.m.cain1_at_usmc.mil
  • GySgt Lance J. Hunziker Physical Security Chief
  • Comm (703) 692-4333 DSN 222-4333
  • E-mail lance.j.hunziker_at_usmc.mil
  • SSgt Tamara N. Garrett - Physical Security
    Specialist
  • Comm (703) 692-4272 DSN 225-4272
  • E-mail tamara.n.garrett_at_usmc.mil
  • Mr. C. A. Tony Pierce Physical Security
    Specialist
  • Comm (703) 695-7202 DSN 225-7202
  • Email charles.a.pierce1.ctr_at_usmc.mil
  • Mr. LeRon Lawrence Physical Security Specialist
  • Email leron.lawrence_at_usmc.mil

17
QUESTIONS