The System Study - PowerPoint PPT Presentation

About This Presentation
Title:

The System Study

Description:

Consolidate files with similar names. Not too much detail at this time. ERD ... Minimize use of color. Use highlighting (15%) Processes. Eliminate if don't alter data ... – PowerPoint PPT presentation

Number of Views:11
Avg rating:3.0/5.0
Slides: 21
Provided by: JeannieM
Learn more at: https://www.csus.edu
Category:
Tags: color | names | study | system

less

Transcript and Presenter's Notes

Title: The System Study


1
The System Study
  • Dr. Merle P. Martin
  • CSU Sacramento

2
Agenda
  • Waterfall Model
  • Preliminary Design Checklists
  • The System Study
  • Go / No-go Decision
  • The FHC Presentation

3
Waterfall Model
  • Development process not
    really serial
  • May redo steps
  • Waterfall model of Systems Analysis
  • Figure 9-9

4
Preliminary Design Checklists
  • Pages 303-307
  • Output
  • Input
  • Files
  • Interactive screens
  • Processes

5
Output
  • Make report look good
  • Include only fields needed
  • 80-position format
  • Print layout form (Figure 9-1)

6
Input
  • Easy to use
  • Concise (only required fields)
  • Aesthetically pleasing
  • Machine-readable

7
Files
  • Consolidate files with similar names
  • Not too much detail at this time
  • ERD
  • Data-element-to-file table (Figure 9-5)

8
Interactive Screens
  • Well-balanced (e.g., spacing)
  • Not cluttered (20 rule)
  • Minimize use of color
  • Use highlighting (15)

9
Processes
  • Eliminate if dont alter data
  • Consolidate similar processes
  • Make serial processes parallel
  • e.g., multiple form copies
  • Decouple processes
  • place data store between

10
The System Study
  • Problem Statement
  • Existing System Documentation
  • project may be delayed
  • Problem Correction Alternatives
  • Recommended Solutions
  • Documentation
  • in appendices

11
Go / No-go Decision
  • Possibilities
  • Rework
  • Scrap
  • Delay
  • Proceed with SDLC
  • Figure 9-9, page 314

12
FHC System Proposal
  • Foundation Health Corporation
    existing systems
  • PROMIS memberships and renewals
  • PROGRES price quotes
  • QCARE medical claims / other customer service

13
Proposal
  • Replace PROMIS and PROGRES with new
    system
  • Link to QCARE
  • Two phases
  • New system is Foundation Rating and Enrollment
    System (FARE)

14
Todays Systems
Premium Accounting
PROGRESS Other Quoting Systems
Quote Disks
PROMIS
Spreadsheets
Q/Care IBM Mainframe
Underwriting Spreadsheets
Sales
Under- writing
15
FARE Phase 1 (Eliminate PROGRESS)
Premium Accounting
New Premium Accounting Interface
Q/Care DB2 IBM Mainframe
FARE
Sales
Under- writing
16
FARE Phase 2 (Eliminate PROMIS)
Premium Accounting
Renewal Process
New Premium Accounting Interface
Q/Care DB2 IBM Mainframe
FARE
Sales
Under- writing
17
FARE Objectives
  • Multi-state, multi- product
    rating system
  • Step to paperless process
  • Manage work flows
  • Integrate info sources
  • FHC common look for proposals
  • Utilize existing technology
  • Enterprise-level database

18
FARE Cost / Benefit
  • Cost reductions
  • Revenue enhancements
  • Alternatives
  • reengineer current system
  • in-house design new system
  • off-the-shelf product
  • culture eliminated outsourcing design
  • Tangible / Intangible matrix

19
Benefits Grid
  • Tangible Intangible
  • Improve Profitability Cross-Selling
    Opportunities
  • of New Business
  • Improved Member Retention
  • More Less Paperwork and
  • Revenue
    Administration Costs / Higher System
    Availability
  • Increase in Prospecting
  • of New Business
  • Elimination of Duplicate Accurate Rating
    (Single-Rating
  • Data Entry Engine Concept)
  • Less Costs Multiple Proposals / Improved
    Audit Process
  • Improved Communication
  • Improved Speed of Turnaround
  • Rekeying of Proposals in Word

20
Concepts to Remember
  • Preliminary Design checklists
  • System Study contents
  • Go / No-go decision
Write a Comment
User Comments (0)
About PowerShow.com