Cross Border Surveillance Actions for the Low Voltage Directive - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

Cross Border Surveillance Actions for the Low Voltage Directive

Description:

... body is needed to organize and manage cross border projects ... New cross border market surveillance projects for in preparation: Christmas lighting chains ... – PowerPoint PPT presentation

Number of Views:111
Avg rating:3.0/5.0
Slides: 20
Provided by: janwillem3
Category:

less

Transcript and Presenter's Notes

Title: Cross Border Surveillance Actions for the Low Voltage Directive


1
Cross Border Surveillance Actions for the Low
Voltage Directive
  • Luminaires 2006
  • Multiple Outlet Extension Cords 2007

2
  • 2006 Joint Action Luminaires
  • First large scale joint market surveillance
    project for the LVD
  • Organized by LVD ADCO
  • Project management the Netherlands
  • Participants 15

3
  • Project design considerations
  • Tests should be easy to perform and cheap
  • Tests should concern safety relevant requirements
  • All participants responsible for their own tests
  • According to phased time frame
  • Sampling at EU importers and manufacturers
  • Time frame until 31 December 2006
  • Reporting before 1 March 2007

4
  • Project organization
  • Original proposal the Netherlands
  • Task Force
  • Further specification and design
  • Final selection of standard requirements and
    tests
  • Specification of information exchange
  • Sampling criteria
  • Classification of shortcomings
  • Etc.
  • Finalization of project description
  • Compilation of guide for inspectors, labs and
    participants
  • Design of excel sheets for information exchange
  • Reporting

5
  • Preliminary Results
  • 14 of 15 participants submitted results one
    participant did not one member state who was not
    a participant did
  • A total of 225 luminaires was investigated
  • 160 products were not in compliance
  • Further analysis (classification of deficiencies,
    source of products, etc) is pending

6
  • Preliminary lessons and observations
  • Working methods of authorities differ
    considerably this makes it hard to
  • Establish random sampling
  • Sample and inspect at EU-importers and
    manufacturers
  • Establish definite time frames for sampling,
    inspecting and testing
  • Information exchange systems to facilitate joint
    MS leave to be desired
  • In practice hardly any use was made of the
    possibility to check which samples were taken by
    other authorities

7
  • Preliminary lessons and observations
  • Variations in weighing the seriousness of
    specific shortcomings
  • Lack of dedicated human resources for
    development, management and reporting is a
    problem
  • Evaluation questionnaire for participants

8
  • 2007 Joint action Multiple Outlet Cord Extension
    sets
  • 21 participants
  • Supported by DG-Sanco
  • Original project proposal Austria
  • Applicant Authority The Netherlands
  • Support from and coordination with E.MAR.S

9
  • Why?
  • Inexpensive products, that are frequently not in
    compliance
  • Possibly fire hazard
  • Risk of electric shock

10
  • Complicated
  • Appliance as a whole under LVD plugs and
    sockets under national regulations
  • Different socket systems -gt different (national)
    standards
  • More complicated and expensive tests
  • Subcontracting of tests to NoBos
  • Project application

11
  • Project application Grant Agreement
  • 15 participants in application
  • Difficult to find formal applicant
  • Difficult to obtain all data required
  • Final document 121 pages
  • Total amount 356831,97

12
  • Task Force
  • Expertise to cover all systems
  • Further specification and design
  • Final selection of standard requirements and
    tests for all systems!!!!
  • Specification of information exchange
  • Sampling criteria
  • Etc.
  • Finalization of project description
  • Available in French, German and English
  • Design of excel sheets for information exchange
  • Reporting

13
  • Project description
  • Market orientation
  • Identification of EU importers and manufacturers
  • Understanding the market
  • Sampling and compliance with administrative
    requirements
  • Quasi random sampling
  • Technical investigations
  • Which requirements
  • Classification of shortcomings (GPSD, Nordic
    system)
  • Reporting information exchange

14
  • Technical investigations
  • Shape and markings
  • Properties of the materials used
  • Fire resistance, resistance to aging, etc
  • Construction requirements
  • Protection against shock, cord anchorage, etc
  • Operating performance
  • Temperature rise, withdrawal forces, etc
  • Connection cord
  • Cross section of wires, construction, etc
  • GPSD aspects

15
(No Transcript)
16
(No Transcript)
17
  • Good Practices in Cross border MS
  • Sampling and inspection at EU importers and
    manufacturers?
  • Time framing?
  • Use of Common Labs for all tests?
  • Round robin testing?
  • Uniformity in measures taken?
  • Uniform reporting?

18
  • Thesis
  • When developed, cross border market surveillance
    allows more and better surveillance for the same
    buck
  • Cross Border surveillance should concentrate on
    first EU importers and manufacturers to be
    efficient (everyone cleans his own house)
  • A professional body is needed to organize and
    manage cross border projects

19
  • Outlook 2008
  • New cross border market surveillance projects for
    in preparation
  • Christmas lighting chains
  • residual current devices
Write a Comment
User Comments (0)
About PowerShow.com