Title: Landfill Gas To Energy Case Studies
1Landfill Gas To Energy Case Studies
2Landfill Gas To EnergyThe Not So Glamorous Green
Energy
- The largest provider of landfill gas to energy
generates enough electricity to serve 1,000,000
homes - Replaces over 7 million barrels of oil per year
- Makes up over half of the Biomass and waste to
energy piece of the pie
3Breakdown of Global Energy Demand
4Growth in LFGE Will Continue
- Within 6 years hundreds of more facilities are
planned and will be built in the US - Total generating capacity will exceed 1000
megawatts from all providers in the next several
years
5Caterpillar is the Basic Building Block of our
Design
- 3516 gas Engine
- low energy fuel
- 800 kW
- 3520 gas engine
- Low energy fuel
- 1600kw
6We Built Upon Cats Typical Line Up
7Case Study Projects
- Elk River Municipal Utilities at the Elk River
Landfill, Minnesota, - Fitchburg/Westminster Landfill in Massachusetts,
- 5-Oaks Landfill in Taylorville Illinois,
- Closed landfill in New Milford Connecticut
8Case Study Projects
9ERMU Gas-to-Energy Facility
- Elk River Municipal Utilities was last of the 1st
generation and first of the second generation
facilities. - Learning Center Addition
10Typical First Generation Layout
- Air intakes on roof
- Exhaust out back
- Minimize down time
- Open up access to engine for maintenance
- Add bridge crane
11Open Up Piping on Top for Maintenance
12Learning Center Provides Access to Public and
alternative energy
13Other 1st Generation Features
14New layout maximizes expansion capability
- Multiple wings allow phased expansion
- Common infrastructure in Center builds in
redundancy
15Fuel skid location Class I Div. 2
16Five Oaks Facility
- Equipment off of roof
- Flare greater distance from building
- Heat recovery for greenhouse
- Fuel skid outside
17Jacket water heat recovery used for
nursery/garden center
18Exterior fuel skid location reduces capital cost
19 3516 Fuel inlet requires dual feed
20Crankcase ventilation is critical to engine life
21Jacket water and after cooler connections require
special Cat Flanges
22Mixed flow intake fans reduce exterior noise
23Fitchburg Site
- Utilizes 3520 platform
- Gas treatment prior to combustion
24Engine and piping configuration is different from
3516 platform
25Fuel Train is single 6 SS feed
26Sulfa treat removes S prior to combustion
27Stack heights Set by air permit
28Support systems minimize fluid change outs
29Additional support systems for maintenance
- Larger tanks for
- 8-engine plants
30Retrofit at a closed facility
- Power generation is still profitable
- Turbines and support equipment removed and reused
- Many amenities excluded
31Concrete and steel reused as much as possible
32? QUESTIONS ?