Title: PRESENTATION%20TO%20THE%20SELECT%20COMMITTEE%20ON%20PUBLIC%20SERVICES
 1 PRESENTATION TO THE SELECT COMMITTEE ON PUBLIC 
SERVICES
- STRATEGIC PLANNING AND BUDGET PRESENTATION 
 - 07 May 2008
 
  2Context of the Presentation
- The departments strategic plan is premised on 
the Governments pledge in SONA to work together 
to realise the core aspiration of our people to 
attain a better life for all  - Consequently, in response to the Presidents call 
for business unusual the presentation attempts 
to sketch out the departments response and role 
towards the achievement of the Governments set 
out objectives.  
  3Format of the Presentation 
- The presentation will expose the Committee on the 
departments role on the roll-out of the Apex 
Priorities  - A high level Government policy issues relating to 
the interventions towards the transformation of 
the sectors falling under the departments 
responsibilities  - A high level discussion of the departments 
programmes in general  
  4Policy Unit
- Objectives of the Policy Unit 
 - To provide strategic leadership for sustainable 
growth, development and transformation of the 
property and construction industries  
  5Key Performance Areas 2008-2009
- In pursuance of DPWs mandate and broader 
government objectives, the Policy Unit will 
continue to -  - provide strategic leadership for the growth, 
development and transformation of the 
construction-  property industries  - regulate the construction-  property industries 
and related professions  - promote best practice in the management of state 
immovable assets through roll out of the 
implementation of Government Immovable Asset 
Management Act (GIAMA)  - contribute to the National Public Works 
Programmes and the Governments Programme of 
Action and  - undertake a series of research to determine 
points of policy intervention to promote growth, 
development and transformation of both sectors 
  6Transformation of the Property and Industry
- As contribution to the transformation of the 
property sector, the department will establish a 
Property Incubator model to create an enabling 
environment to promote sustainable emerging 
enterprises in all the property activities of the 
department  - Emerging enterprises, selected through a 
pre-approved criteria, to be in the Incubator 
Programme for a limited number of years  - Work opportunities to be provided through 
selective procurement process as well as 
supply-side support such as access to finance, 
training, mentorship, enterprise development, 
etc.  - Targets to be set taking into account the 
baseline.  - These property activities include Facilities 
Management, lease broking, leasing, disposals. 
  7Transformation of the Property and Industry contd
- Quick wins to be identified 
 -  - lease broking 
 -  - property services such as cleaning, garden 
services with specific focus to promote women- 
and youth-owned enterprises (ensuring job 
security and quality)  -  - disposal of under and or unutilised buildings 
and small pieces especially residential 
properties  -  - release of land for land reform and low cost 
housing etc.  - Department will target high levels of 
participation of emerging enterprises and 
individuals in these areas to get close to 
Cabinets target of 85. 
  8Transformation of the Construction and Industry
- Together with provincial departments of Public 
Works, the department will roll out the 
implementation of the National Contractor 
Development Programme (NCDP) supported by CIDB  -  - targeting emerging enterprises at all levels 
of the CIDP Register,-- support programmes to be 
structured in line with capacity requirements of 
the enterprises  - Strategic co-operation to be established with 
different public and private entities.  - Department will also roll-out the implementation 
of its Skills Development Strategy focusing on 
improvements through out the skills pipeline.  -  
 
  9Regulation of the property and construction 
industries
- Recognising the developments in the property and 
construction industries, the department will 
conduct extensive reviews in the following 
policies and legislation  -  - its White Papers and Public Works and 
Construction industry  -  - legislation establishing the State Enterprises 
reporting to Public Works  -  - Review of Expropriation Act and CBE and 
Professional Councils Legislation is underway.  - Conduct research on 
 -  - different pieces of legislation administered 
in different spheres of government that impact 
on property development  -  - different legislation administered in 
different spheres of government that regulate 
to construction industry.  -  Appropriate action to be taken depending on the 
outcome. 
  10Best practice and uniformity in state immovable 
asset management
- In driving the implementation of GIAMA throughout 
national and provincial government departments, 
the department will  -  - finalise development of and publicise 
comprehensive guidelines on GIAMA for users and 
custodians  -  - assist provincial custodians to ensure state 
of readiness for implementation by ensuring 
that  -  gt asset registers are updated to meet the NT 
minimum requirements  -  gt vesting of state land 
 -  gt adequate capacity is developed to implement 
GIAMA  -  gt development of uniform policies for property 
and asset management. 
  11Contribution to National Public Works Programme 
(NPWP) and job creation
- Department will conduct research to assess 
current government initiatives that contributed 
to the principles of NPWP with recommendations on 
appropriate interventions  - Appoint at least 10 interns during this current 
year.  
  12Research
- A Research Coordinating Committee will be 
established comprising all relevant units of the 
department to establish research agenda and 
coordinate all research.  - Based on this a series of research will be 
undertaken to determine areas of intervention by 
the department.  - Releasing of publications on critical economic 
information about the state of the industries 
  13EPWP
- Objectives of EPWP 
 - Contribute towards the eradication of poverty 
through the creation of temporal work 
opportunities, income generation, skills 
development and exit opportunities where it is 
possible.  
  14Key performance areas Strategic Review - 2008
- FOCUS AREA 1 ENHANCING EPWP INTERNAL CAPACITY 
AND PERFORMANCE  - Enhance internal EPWP capacity 
 - Positive EPWP public profile 
 - Improve EPWP reporting/verification/integrity 
 - EPWP performance evaluation and action plan to 
improve qualitative performance  -  
 - FOCUS AREA 2 ENHANCING DELIVERY OF THE EPWP 
 - Enhance Municipal EPWP delivery capacity 
 - Enhance Provincial EPWP delivery capacity 
 - Enhance National DPW EPWP delivery capacity as 
implementer  - FOCUS ARE 3 EXPANDING AND IMPROVING BENEFICIARY 
SELF SUFFICIENCY  - Expand and improve beneficiary training 
 - Facilitate the implementation of the exit 
strategy approach  - FOCUS AREA 4 DEVELOPING A LONG TERM STRATEGY OF 
THE EPWP  - Develop and secure agreement for the long term 
strategy of the EPWP  - Identification of new areas for expansion 
including Environmental Sector 
14 
 15KPA 1 Enhance internal EPWP capacity
Outcome Outputs
An efficient and effective nationwide institutional capacity is established that mobilises, supports, monitors and reports on the implementation of the EPWP Organisational development support provided to achieve reqd capacity review and adjust current structure Integrated management process established and maintained roles  responsibilities at Provincial level resolved  targets and protocols set 
KPA 2 Positive EPWP Public Profile KPA 2 Positive EPWP Public Profile
Positive perceptions of the EPWP potential beneficiaries and the general public Compliance against visibility requirements promoted Communications Campaign to profile successes implemented ongoing high quality documentation of beneficiaries Constructive critical debate around the EPWP promoted Beneficiary awareness increased Information on progress of the EPWP against target communicated widely to the public including the development of tools 
 16KPA 3 . Improve EPWP reporting/ verification/ 
integrity 
Outcome Outputs
Accurate, timeous and comprehensive information on EPWP activities and outcomes are available to EPWP decision makers and managers and for packaging to the public. Implementers receive timeous and appropriate reports and feedback on their EPWP performance Development and implementation of a web-based EPWP MIS Effective utilization of the EPWP MIS Ongoing verification programme 
 Efficiency, effectiveness and impact of the EPWP improved Review and adjust evaluation framework Specific evaluations requested and undertaken An analysis report produced into the duration of work opportunities, level of labour intensiveness and implications for training and person year targets. An analysis report produced on cost benefit of labour intensive approaches Sector and programme managers participate in a critical analysis of their data and establish strategic interventions to improve sector and provincial performance 
KPA 4 EPWP performance evaluation and action 
plan to improve qualitative performance  
 17Focus Area 2  Enhancing delivery of the EPWP 
KPA 5  Enhance Municipal EPWP delivery capacity 
Outcomes Outputs 
EPWP Municipal targets are met and/or exceeded specified target jobs, training, SME. EPWP contributes to improved service delivery at Municipal level. EPWP mainstreamed at Municipal level. Infrastructure technical support provided to 130 prioritized Municipalities Support provided to 30 Municipalities in addition to the 130 prioritized Municipalities Excellence recognised and rewarded Support for effective social facilitation provided New Venture Learnership and Cooperatives developed and supported Social Technical support provided to six metros and two district municipalities based on investigation Large infrastructure projects implemented EPWP Waste Management Initiative implemented Vukuphile Programme implemented 
 18Focus Area 2  Enhancing delivery of the EPWP 
KPA 6  Enhance provincial EPWP delivery capacity 
Outcomes Outputs 
EPWP Provincial targets are met and/or exceeded specified target jobs, training, SME. EPWP contributes to improved service delivery at Provincial level. EPWP mainstreamed at Provincial level. Support provided to the Early Childhood Development (ECD) programme Support provided to the Home Community Based Care (HCBC) programme Technical support provided to the Large infrastructure project Technical support provided to the Access Roads programme Vukuphile Programme implemented Provinces supported to identify accommodation for social sector facilities in DPW managed properties Support provided to Provinces on NYS roll out New Venture Learnership and cooperatives developed and supported Excellence recognized and rewarded Support for effective social facilitation provided Technical support to new provincial social programmes provided subject to provincial commitments 
 19 Focus Area 2  Enhancing delivery of the EPWP
KPA 7  Enhance National DPW EPWP delivery 
capacity as implementer 
Outcomes Outputs 
DPW demonstrates its commitment to lead and contribute to the achievement of EPWP National targets work opportunities, training, SME and improves service delivery through the EPWP. DPW mainstreams EPWP in targeted programmes DPW Capital and Building Maintenance Projects are implemented as EPWP projects National youth service NYS involved in DPWs building activities Social sector facilities accommodated in un-used DPW managed properties
Focus Area 3 Expanding and improving beneficiary self sufficiency Focus Area 3 Expanding and improving beneficiary self sufficiency
KPA 8 Expand and improve beneficiary training KPA 8 Expand and improve beneficiary training
Ability and confidence of beneficiaries to access work opportunities is enhanced DoL processes for accessing beneficiary training streamlined all processes including role of public body Prior training prioritized and implementation motivated SETA processes for accessing learnerships and skills programmes accredited training streamlined Training content is adjusted to prioritize technical skills. Training provider capacity is enhanced Capacity of public bodies to manage and facilitate training is enhanced. 
 20Focus Area 3 Expanding and improving beneficiary 
self sufficiency  
KPA 9  Facilitate the implementation of the 
exit strategy approach 
Outcomes Outputs 
Broad based understanding obtained amongst stakeholders and implementers on the role of the EPWP in respect of beneficiaries accessing sustainable exit opportunities. Specific exit plans are developed for EPWP supported SMEs/NYS A practical, implementable and sustainable exit framework is developed by sector for the EPWP
Focus Area 4 Developing a long term strategy for EPWP Focus Area 4 Developing a long term strategy for EPWP
Long term EPWP programme design formulated and approved Finalise Mid term Review Complete Strategic Review Formulate Concept report Formulate detailed report 
KPA 10  Develop and secure agreement for the 
long term strategy of the EPWP  
 21 Focus Area 4  Expanding and developing a long 
term strategy of the EPWP
KPA 11  Identification of new areas for 
expansion 
Outcomes Outputs 
New areas identified and scoped Environmental sector review and other inputs are analysed and converted into an expansion plan for the sector Health Systems Trust social sector report and other inputs are analysed and converted into an expansion plan for the sector Jobs for Growth programme reviewed and EPWP expansion plan formulated An evaluation of Infrastructure services backlogs undertaken and EPWP expansion opportunities identified An evaluation of the 2010 transport programme undertaken and EPWP expansion opportunities identified 
 22ASSET MANAGEMENT
- Objectives of Asset Management 
 - Units specific purpose is to ensure that 
immovable asset owned and/or utilised for 
delivering various government services yields 
functional, economic and social benefits to the 
State for improved service delivery 
  23Key Performance Areas2008 -2009
- Provide efficient and effective Asset Management 
 - Implementing GIAMA-contribution to poverty 
alleviation and job creation, improving service 
delivery, complying with corporate governance 
requirements  - Promoting BEE and contributing to the 
transformation of the construction and property 
industries  - Supporting Expanding Public Works Programme 
 - Accelerated and Shared Growth Initiative and 
(ASGISA) Joint Initiative for Priority Skills 
Acquisition (JIPSA)  - Implementation plan for the Turnaround Strategy
 
  24National Infrastructure Maintenance Strategy
- Cabinet has recognized the importance of 
infrastructure maintenance within government and 
the role that effective maintenance will play in 
support of ASGISA.  - To this end cabinet has approved the National 
Infrastructure Maintenance Strategy (NIMS) and 
the Department of Public Works has been tasked 
with leading the implementation of the programme 
to deliver on the strategy.  - Implementation of the strategy requires 
significant coordination within government, in 
order to ensure that all the organs of state plan 
effectively for and implement maintenance of 
their strategic infrastructure.  - Infrastructure, in the form of public buildings, 
roads, water and sewerage systems, electricity 
and other services, supports quality of life and 
is the foundation of a healthy economy.  - NIMS is going to be formally launched before June 
2008 
  25Asset Management Plans and GIAMA Implementation
- Are assessed in relation to their performance, 
suitability, condition and the effect of the 
condition on service delivery ability and  - Assets are decommissioned in line with assessment 
recommendations.  - Asset management has completed the first set of 
User Immovable Asset Management Plans (UAMPs) and 
embarked on the second phase.  - Guidelines for the Custodian Immovable Asset 
Management Plans (CAMPs) will be completed by 30 
July 2008 and the actual CAMP will be in place 
during the 2008/09 fiscal year.  
  26Access for People with Disabilities (AMs APEX 
Priority 1)
- Government has an obligation to make its 
buildings and facilities accessible to all its 
citizens, including people with disabilities.  - The following categories of people are affected, 
include but not limited to physically disabled 
(minor to quadriplegia), ambulatory problems 
(from temporary to problems due to age  
infirmity), blind and partially sighted, hearing 
impaired, speech impaired, intellectually 
challenged and minors and the aged.  - Although an amount of R 63 million was to be 
prioritised from the maintenance budget, it has 
since been resolved that the operations branch 
make access for people with disabilities 
mandatory in all new buildings specifications.  - The old buildings will have to be prioritised 
from respective client departments capital 
budget.  
  27Rehabilitation of Unutilised State Buildings 
(AMs APEX Priority 2)
- With a view of enhancing the value of State 
immovable assets and improving service delivery 
to clients, the department will embark on the 
rehabilitation of State-buildings primarily for 
use by government departments.  - Priority will be given to properties that are 
strategically located to support the functions of 
the client departments.  - Also, the properties that would stimulate 
economic development in all regions in the 
country will be given a priority.  - An amount of R 233 million is required for 
2008/09, of which R 90 million from the Trading 
account augmentation has already been set aside.  
  28Energy Efficiency Code
- The Energy Code of conduct will, in essence, 
stand as a commitment between the Department of 
Public Works and its users to support specific 
objectives of the National Energy Efficiency 
Strategy as far as they relate to the buildings 
and facilities which are used by the DPW itself 
as well as those that are under its 
custodianship.  - Hence, in January 2008, the National Electricity 
Response Team comprising relevant national 
government departments, metropolitan 
municipalities and their agencies, Eskom and 
relevant regulatory bodies in order to align 
themselves with the goals set for improving 
energy efficiency and conserving power.  - To this end, the department of Public Works has 
established short, medium and long term 
interventions to be implemented with a major 
element of this intervention as the commitment of 
the Government immovable assets users and DPW 
lessors to implement initiatives that improves 
energy efficiency. 
  29Prioritisation of Capital and Maintenance
- The department annually embarks on prioritisation 
of maintenance and capital budgets with a view to 
compile an annual implementation programme.  - The department is currently developing policy and 
strategy for maintenance to facilitate 
development of maintenance planning for every 
fiscal year.  - Summarised below is the short-term prioritization 
criteria  - Statutory compliance with respect to the 
following legislation OHSA, PFMA, PPPFA, other 
Land, Environmental and Safety Legislation 
Security measures e.g. prevention of escapes and 
safe-keeping of firearms.  - MTEF Prioritisation has an added criteria viz. 
EPWP, Project consolidate, ASGISA, APEX  
  30Border Control Operational Co-ordination 
Committee (BCOCC)
- The BCOCC portfolio aims to integrate, 
coordinate, plan and programme manage all 
physical infrastructure and ICT developments on 
land, air, sea and the rail ports of entry (the 
Border-line) on behalf of numerous departments 
(like SAPS, SARS, Home Affairs, Agriculture, 
Health and NIA).  - DPW has been mandated to chair the BCOCC 
Infrastructure Committee.  - Budget allocations for the 2008/2009 stand at 
R478 820 000. 2010 Infrastructure Projects (Ports 
of Entry) include Lebombo Port of Entry 
Redevelopment (RSA / Mozambique), Golela Port of 
Entry Redevelopment (RSA / Swaziland) and 
Skilpadshek Port of Entry Redevelopment (RSA / 
Botswana)  
  31Asset Register Enhancement
- A more co-coordinated approach is implemented to 
accelerate improvement of the asset register.  - The asset register enhancement project in 
2005/06, was put in place in order to improve 
data integrity of the departments asset 
register, service delivery and to facilitate 
asset and property management in the department.  - Phases 1 and 2 entail the collection, research 
and verification of property information as well 
as the capturing of new and missing verified  - Continuous identification of assets yet to be 
accounted for.  - The interoperability of Information Systems (PMIS 
and WCS)  
  32Condition Surveys
- The unit has embarked on the Condition Audits of 
the State owned properties that would establish 
the status quo for each building and facility has 
to be as well as all those buildings that are 
found, (via the status quo reports) to be in need 
of upgrade.  - Funds and manpower are being procured for 
investment to effect the required improvements.  - The completion of this exercise is expected to be 
31 March 2009.  
  33Valuations
- The department is also researching affordable 
system for property valuations that comply with 
accounting standards, in particular GAAP in a 
Trading account environment.  - Valuation standards and methodology which 
encompasses three valuation templates, namely 
depreciated replacement cost, income 
capitalisation and comparative sales method, have 
been submitted for approval by the National 
Treasury.  - This unit is on track with the completion of all 
residential portfolio and 30 remaining assets.  - For 2008/07, this is being done in-house as the 
budget allocation kicks off in the fiscal year 
2009/10 with R 30 million.  
  34Client Value Proposition (CVP)
- During 2007/08 DPW signed 90 of the MOUs with 
respective client departments  - Once the signing of all SLAs is complete, the 
Department will develop Client Value Propositions 
(CVPs) for all clients.  - CVPs will be constructed after finalisation of 
SLA where service delivery standards will be 
articulated and other products and services, that 
the department offers, will be clearly defined.  - It has to be noted however, that the capacity 
within KAM will need to be enhanced in order to 
handle the sophisticated expectations of the CVP. 
  
  35Budget Allocation 2008/9
Expenditure Item 2007/08 2008/09
Compensation of Employees (excluding EPWP) 731 567 781 482
Property Management - Accommodation Charge 276 965 286 180
Trading Entity transfer 476 000 528 000
Infrastructure (Capital Works) 863 044 1031 208
Municipal Rates 836 570 889 325
EPWP - Compensation of Employees 28 000 30 000
 - Operating allocation 56 612 94 709
Transfer Payments to CIDB 49 891 41 891
Transfer payments to CBE 23 939 26 286
Transfer Payments to Agreement Board 7 613 8 070
Auxiliary Services 23 380 25 853
Administration (excluding EPWP) 385 883 398 398
Total 3 759 464 4 141 402 
 36Other Departments
CAPITAL Allocation 2008/09 Total
Agriculture 20,942,896.00
Arts  Culture 187,582,787.00
Correctional Services 670,000,000.00
Defence 111,656,223.00
Home Affairs 37,628,846.00
Justice 513,311,811.00
Labour 46,000,000.00
Land Affairs 2,212,063.00
SAPS 650,000,000.00
  2,239,334,626.00 
 37BUDGET ALLOCATION SUMMARY
Programme Adjusted Medium Term Expenditure Estimate Medium Term Expenditure Estimate Medium Term Expenditure Estimate
R thousand Appropriation      
  2007/08 2008/09 2009/10 2010/11
1. Administration 647 360 687 317 767 116 843 181
2. Provision of Land 2 898 280 3 195 491 3 698 985 3 968 982
 and Accommodation        
3. National Public Works 189 444 232 741 276 586 319 952
 Programme        
4. Auxilliary and Associated 24 380 25 853 27 306 28 944
 Services        
 TOTAL 3 759 464 4 141 402 4 769 993 5 161 059 
 38PROGRAMME 1. ADMINISTRATION
- Over the MTEF period the budget of the 
Administration programme rises by an average of 
9.2 mainly as a result of the departments 
relocation costs as well as additional 
allocations for accommodation costs. 
  39PROGRAMME 2. PROVISION OF LAND AND ACCOMMODATION
- Over the MTEF period the budget of the programme 
rises by an average of 11 as a result of growth 
in the allocations for  -  -Provincial Property Rates 
 -  -Asset Management Projects 
 -  -Augmentation of the PMTE 
 
  40PROGRAMME 3. NATIONAL PUBLIC WORKS PROGRAMME
- The budget of programme 3 grows by an average of 
19.1 over the MTEF period owing mainly to 
sizeable increases in the budget of the Expanded 
Public Works Programme, which grows by  -  - R30 million 2008/09 
 -  - R 50 million 2009/10 
 -  - R 80 million 2010/11 
 
  41PROGRAMME 4.AUXILIARY AND ASSOCIATED SERVICES
- This programme sees a modest increase of 5.9 
mainly to cater for inflation. From  -  - R25.9 million in 2008/09 to 
 -  - R28.9 million in 2010/11
 
  42ECONOMIC CLASSIFICATION
Economic Classification Adjusted Medium Term Expenditure Estimate Medium Term Expenditure Estimate Medium Term Expenditure Estimate
R thousand Appropriation      
  2007/08 2008/09 2009/10 2010/11
Current Payments 1 467 180 1 580 315 1 840 049 2 004 403
Transfers and Subsidies 1 412 142 1 512 706 1 705 970 1 848 190
Payments to Capital Assets 880 142 1 048 381 1 223 974 1 308 466
TOTAL 3 759 464 4 141 402 4 769 993 5 161 059 
 43ECONOMIC CLASSIFICATION
- In the 2008/09-2010/11 MTEF period the budget of 
the department sees the biggest growth in Capital 
expenditure in line with the broader government 
programme of the intensification of 
infrastructure development.  - Analysed by economic classification the budget 
grows as follows  -  - 11  Current Payments 
 -  - 9 Transfers and Subsidies 
 -  - 14  Payments for Capital Assets 
 
  44MAJOR INFRASTRUCTURE ALLOCATIONS
- The following amounts have been allocated for 
both DPW and the Border Control Operational 
Co-ordinating Committee (BCOCCs) infrastructure 
budgets over the MTEF period  - R1 billion 2008/09 
 - R1.2 billion 2009/10 
 - R1.3 billion 2010/11 
 -  BCOCC funds are utilised to improve border post 
facilities in part to facilitate preparations for 
the 2009 FIFA Confederations Cup and the 2010 
FIFA World Cup. 
  45MAJOR INFRASTRUCTURE ALLOCATIONS
- A number of assets will be acquired/upgraded for 
the Re kgabisa Tshwane project which aims to keep 
national government head offices within the inner 
city of Pretoria. These assets include the  - HG de Wit Building (R66 million) 
 - Old TPA Building for DFA (R250 million) 
 - Agrivaal Building for GCIS (R200 million) 
 -  Around R1 billion will be spent on the 
upgrading, maintenance and improvement of 
immovable assets of the state. 
  46The End