Title: MAC PI Industry
1The "DCS in a Box"
SIMATIC PCS 7 BOX
2Agenda
- Introduction Overview
- System Architectures
- More Details on the Industrial PC
- More Details on the Controller
- Packaging and Bundling
- Summary
- Questions Answers
3Trends in Process Automation
Controller
Controller
Controller
PC
Intelligent Field Devices
PC
1990
2000
2010
PC-based Process Automation Solutions are
becoming more prevalent
Distributed Architectures are required to meet
tomorrows business needs
4Trends in Process Automation...
Market Studies of DCS System Architecture by ARC
Number of Small Plants (x 1000)
According to ARC, business drivers are pushing
customers to install Small systems
5Trends in Process Automation...
Hardware Cost per Small Plant (x 1000)
The market demands a continuous reduction in the
cost of process automation system hardware
6To respond to these business drivers, Siemens has
introduced PCS 7 BOX The DCS in a Box
- Included in the Box
- Operator Interface
- Hardened Controller
- Fieldbus Connections
- Engineering Software
- MS-SQL-based Historian
- Field Device Management
- Batch Manager
Operator Interface Engineering Tools
Box PC
PROFIBUS
PCS 7 BOX is the first PC-based, integrated, DCS
controller on the market. It provides the ideal
solution to capitalize on the trends in automation
7Potential Advantages of a PC-based Solution
- Simple connection to the office world using
Industrial Ethernet and standard mechanisms such
as OPC - Low cost, integrated solution on a single
hardware platform - Simple connection to the web
- Simple integration of custom application
software (e.g. C programs or Visual Basic) - Use of standard MS Office Tools (eg. Excel)
- Uses widely used, standard Microsoft Windows
Operating Systems - High Computing Capacity
8Key Design Considerations for PC-based control in
Process Industries
Considerations
- High failure rate of PC hardware
- Complex Control Software
- Insufficient real-time performance of the
operating system - Dependence on constantly changing (and sometimes
unstable) Windows Operating systems
9Physical Dimensions of PCS 7 BOX
PCS 7 BOX approx 12 x 12 x 4, 14 lbs
Small footprint and light weight means it is easy
to mount in the field
10PCS 7 BOX is offered in two flavors
Software is Preinstalled on the PC
11PCS 7 BOX shares common hardware and software
with PCS 7, providing an unprecedented level of
scalability
Pilot Plant
Manufacturing plant
Multiple plants at a manufacturing site
Scalable from PCS 7 BOX...
...to a distributed system with client/ server
architecture ( 100,000 I/O)
Scalability in PCS 7 means that you can reuse
hardware and engineering elements as you expand
or modify your plant
12Three Possible System Architectures
Architecture
Application
- Standalone Operator Station / Controller
- Standalone Operator Station / Controller with
Integrated Engineering - Local Operator Station / Controller with
connection to PCS 7 system
- Economical Powerful Single Station with
DCS-style functionality - Single Station with DCS-style functionality and
Engineering Tools - Unit Controller (for Skid Mounted Equipment)
- Controller-to-Controller Communication
- Engineered from Central Workstation which is also
used for the DCS
1.
2.
3.
13Standalone Operator Station / Controller
Download Control, HMI Configuration
Configuration from a Remote (floating)
Engineering Station
14Standalone Operator Station / Controller with
Integrated Engineering
Configuration is done using the Integrated
Engineering capability
15Local Operator Station / Controller with
connection to PCS 7 Network
Single, Central Engr Station can be used to
configure PCS 7 Box and the PCS 7 Network
16More Details on the PC
17SIMATIC Box PC 620 high performance in a small
form factor
Designed for use in Industrial Environments
18SIMATIC Box PC 620 expandable to meet your
needs
19SIMATIC Box PC 620Technical specifications
Subject to technical changes/improvements without
prior notice.
20SIMATIC WinAC Slot CPU
- WinAC Slot CPU 416-2DP
- Same performance as an S7-400 Controller (416-2)
- Controller operation is independent of PC and
Windows 2000 (Continues to control through reboot
of the PC) - Built-in battery backup
- MPI and PROFIBUS DP interfaces onboard
- Built in 24 V power supply extension board
allows controller to be powered separately from
the PC
21SIMATIC WinAC Slot CPU
Memory Card (RAM/Flash)
MPI/DP Interface (external)
LED Stop/Run
Connector forbackup battery
Profibus-DP Interface
External Power Supply 24V
- 2MB Memory Expansion Card is provided standard
- Integrated Profibus Interface allows connection
to standard SIMATIC ET 200 I/O Subsystems
22CPU Panel
Buffer Battery Status LED
Mode Selection
Memory Reset
Status and Error Indicators of the CPU
23PCS 7 BOX Bill of Materials for Operator
Station / Controller
Included Standard Out of the Box
- SIMATIC Box PC 620, 24 VDC
- WinAC Slot CPU 416 V3.4 (built-in)
- Expansion Memory Card, 2 MB (built-in)
- WinAC Power Supply Extension Board (built-in)
- Backup Battery (built-in)
- SIMATIC PCS 7 OS Single Station runtime license
(250 PO / RT 8K) - OPC Client / OPC Server
- SIMATIC PCS 7 AS Library runtime license
24PCS 7 BOX Bill of Materials for Operator
Station / Controller with Integrated Engineering
Included Standard Out of the Box
- SIMATIC Box PC 620, 24 VDC
- WinAC Slot CPU 416 V3.4 (built-in)
- Expansion Memory Card, 2 MB (built-in)
- WinAC Power Supply Extension Board (built-in)
- Backup Battery (built-in)
- SIMATIC PCS 7 AS and OS Engineering / runtime
license (250 PO / RC 8K) - OPC Client / OPC Server
- SIMATIC PCS 7 AS Library runtime license
25Scalability Upgradability of PCS 7 BOX
Large Scale
Small Scale
Operator Station
250 Process Objects
2000 Process Objects
Controller
Operator Station
Controller
250 Process Objects
2000 Process Objects
Engineering Station
Standard Package (Default)
PID Controller
Motor
Analog Indicator
Any control element that has a corresponding
faceplate in the HMI
Process Object
26SIMATIC PCS 7 Box Optional Accessories
27PCS 7 BoxGoing Where No DCS Has Gone Before
- Benefits
- Provides DCS functionality in applications where
it was previously too expensive or too large - Reduces Integration Costs by making it easier
to integrate secondary processes and DCS
applications - Compact Footprint
- Supports applications requiring FDA Validation
- Scalable and Expandable
- Allows standardization of Control HMI Elements
between Skids and DCS
28PCS 7 BoxGoing Where No DCS Has Gone Before
- Applications
- OEMs to the Process Industry
- Skid Vendors (Smart Skids)
- Secondary Processing
- Pilot Plant Applications
- Stand-Alone or Networked Architectures
29Questions ?
Thanks for Listening !