Title: AMS02 Uninterruptible Power Supply
1AMS-02 Uninterruptible Power Supply
Alpha Magnetic Spectrometer NASA / DOE
Status Summary
T. J. Urban / ESCG
March 30, 2006
2AMS-02 Uninterruptible Power Supply Status Summary
Alpha Magnetic Spectrometer NASA / DOE
- Battery Delivery
- All Battery Management System (BMS) electronics
qualification and acceptance test data reviewed - In compliance with SOW Appendix C.
- Batteries and BMS were shipped the first week of
March. Scheduled delivery the week of April 3,
2006.
T. J. Urban / ESCG
2
March 30, 2006
3AMS-02 Uninterruptible Power Supply BMS PCA
Alpha Magnetic Spectrometer NASA / DOE
T. J. Urban / ESCG
3
March 30, 2006
4AMS-02 Uninterruptible Power Supply Five
Completed Batteries
Alpha Magnetic Spectrometer NASA / DOE
T. J. Urban / ESCG
4
March 30, 2006
5AMS-02 Uninterruptible Power Supply Status Summary
Alpha Magnetic Spectrometer NASA / DOE
- UPS SOW Revision B
- Current monitor during performance test (Section
4.1) will be deleted and 72 hour charge stand
test will be added (CSIST O.K.). - Removal of 6 hour duration over-voltage test.
Yardney CSIST OK - Other, agreed-to changes in Revision B.
- Redefine electrical interface battery safety
signal for overvoltage. This is acceptable to
CAB (CRISA). - Testing
- Update of UPS thermal acceptance testing based
upon latest integrated thermal analysis (test _at_
55C). - Addition of thermal cycle testing as flight
acceptance screening for Flight Model batteries
(actually UPSs). Mandated by SSP 41172 and
thermal engineering community.
T. J. Urban / ESCG
5
March 30, 2006
6AMS-02 Uninterruptible Power Supply Status Summary
Alpha Magnetic Spectrometer NASA / DOE
- Further UPS Actions
- Provide portable UPS tester CSIST to provide by
TBD (before Oct. 2006. Based upon Rev. B test
requirements, a portable battery tester will have
to be purchased in Taiwan (US10k 20K). - Locate UPS fasteners from ESCG Complete.
Fasteners to arrive the week of April 3, 2006. - Other On-going Activity
- JSC Safety Analysis Hazard Report no. 18 for
batteries has been prepared, and is in review. - JSC Battery Safety form is in work.
T. J. Urban / ESCG
6
March 30, 2006
7AMS-02 Uninterruptible Power Supply UPS EDU Piece
Parts / Providers
Alpha Magnetic Spectrometer NASA / DOE
T. J. Urban / ESCG
7
March 30, 2006