Timber Harvest Planning
  • Course Learning Objective
  • Be able to describe the harvest planning
    process including different levels (or types) of
    harvest plans, and harvest planning objectives
    related to sustainable forest resource
    management.
  • Be able to complete a paper based tactical
    harvesting and road plan.

2
Timber Harvest Planning
  • Topics
  • The harvest planning environment..different
    types
  • of harvest plans
  • Harvest planning criteria/objectives
  • Decision making framework for matching
    harvesting
  • systems to the site
  • Introduction/overview of the Oregon Forest
    Practice
  • regulations
  • Steps in completing a harvesting plan
  • Lab
  • Yarding distance terminology and calculations
  • Road grade layout road numbering systems
  • Harvest planning class exercise/discussion
  • Harvest planning group project (begin)
  • Week 10 Lecture Topic Loading and
    Transportation

3
The Planning Environment Different Types of
Harvest Plans
4
An Example of a Tactical Plan
5
An Example of an Operational Plan
6
Harvest Planning Criteria/Objectives
  1. The harvest system selected must be physically
    capable of accomplishing the silvicultural and
    other resource management objectives (including
    safe operating practices).
  2. The harvest system selected must be economically
    efficient and feasible.
  3. The harvest system selected must meet
    environmental requirements.
  4. The harvest system selected must be socially
    acceptable (including forest practice regulations
    and best management practices).

7
Decision Making Framework
Tree size, Ground slope, Yarding distance, Soil
Water protection
8
(No Transcript)
9
(No Transcript)
10
Harvest Planning and Implementation Flowchart
11
Harvest Planning Steps
  1. Review the specific forest resource goals and
    objectives for the planning project (feasibility
    safety, economics, environmental, and social).
  2. Specify the constraints that limit the choice of
    logging, road and transportation alternatives.
  3. Gather the necessary information to develop the
    harvest plan.
  4. Plan the field reconnaissance (if appropriate
    operational planning)
  5. Complete a first draft harvest plan that shows
    areas for different logging methods, road and
    landing locations, and areas that require special
    protection. Often there are several alternative
    plans.
  6. Choose one plan to pursue with further analysis
    and design.
  7. Prepare the final harvest plan (maps, written
    explanations and harvesting requirements) for
    review by forest resource managers.
  8. Complete a cost analysis of the proposed
    harvesting and obtain contractor bids (if
    appropriate operational planning).