DIRECTORATE GENERAL OF SYSTEMS DATA MANAGEMENT
www.icegate.gov.in www.cbec.gov.in 2 Contents
ATP
Roles
Process and Support
Product Testing
2 21-Jan-14 3 ATP and Roles
ATP (Acceptance test process) This process involves series of standard agreed tests to establish the following with respect to the LAN infrastructure deployed at CBEC offices
Verification of BoM
Installation Quality Checks
Functionality Check of the equipment installed
LAN connectivity and integration with WAN, (if installed)
4 Roles
HP Hewlett-Packard is the Lead Service Provider implementing the CBEC LAN Project
PwC PricewaterhouseCoopers is the Project Manager for the project and would carry out the Acceptance Test process. PwC/their outsourced representatives from CMS would be visiting all sites to conduct the tests.
Lead Nodal Officer ( in charge of the building) is expected to facilitate the acceptance process and sign off on the Acceptance document immediately after completion. He would coordinate with other co-located CBEC offices to facilitate ATP on scheduled dates.
5 Process and Support
Prior information would be provided to lead Nodal Officer ( 3 days in advance) regarding scheduling of ATP. Changes in the proposed dates may be minimised to enable overall adherence to project schedule .
ATP would be carried out by PWC and HP representative in presence of Lead Nodal Officer or his nominee (s) ( since adherence to schedule is necessary).
The team visiting for ATP from PWC and HP would brief the lead nodal officer / nominee (s) about processes, documentation and steps.
Any queries or clarification by CBEC officer during ATP process would be answered by local PWC and HP teams .Other queries may be escalated immediately to central teams of M/s PWC/ HP.
ATP activities may take one day or more ( according to the size of the location). Local assistance would be requested accordingly.
6 Process and Support contd.
During ATP operations of various products would be demonstrated and on-site training provided by HP.
IT in-charge of the building should also be part of the process. If possible electrical in-charge may also be included.
Lead Nodal officer needs to sign-off on the test results and ATP documents. Any minor observations may be noted at time of sign off on the ATP document itself.
A copy of ATP report would be provided to Nodal officer for his reference and records.
7 General Instructions regarding Product Testing ( Details as per ATP document)
Thin Client
Check for Physical damage, if any and record .
Switch ON the thin client
Enter User Name and Password provided by HP Personnel
Check for application access e.g. ACES.
Printing through Network laser/line Printer and/or directly connected printer (deskjet)
Check for physical damage, if any and record
Switch ON the Printer
Create a test page in Open office installed in Thin Client
Fire a Print out on the Printer configured
8 Product Testing contd.
Scanner
Check for Physical damage, if any and record
Switch ON the Scanner
Take any document scan and save the document
Open the document to verify if the scanning was performed properly
Print Server
Check for physical damage if any and record.
Switch on the server
Check general functionality
Simultaneously Fire Printouts from more than one Thin Client to test the functionality of Print Queue.
9 Product Testing contd.
Power Equipment
Different sets of acceptance process has been formulated for sites
With DG and UPS
With UPS only
The appropriate test process is to be chosen and conducted.
The test process is designed to establish the following
Out put voltage of DG and UPS at various stages.
UPS Battery backup time of 15 minutes.
Un-interrupted power supply change over.
Auto start/shut down of DG in case of power failure.
Manual start/shut down of DG.
10 Contact Details of Central Teams
HP
Landline 011- 26877966 for the ATP and training period
PowerShow.com is a leading presentation sharing website. It has millions of presentations already uploaded and available with 1,000s more being uploaded by its users every day. Whatever your area of interest, here you’ll be able to find and view presentations you’ll love and possibly download. And, best of all, it is completely free and easy to use.
You might even have a presentation you’d like to share with others. If so, just upload it to PowerShow.com. We’ll convert it to an HTML5 slideshow that includes all the media types you’ve already added: audio, video, music, pictures, animations and transition effects. Then you can share it with your target audience as well as PowerShow.com’s millions of monthly visitors. And, again, it’s all free.
About the Developers
PowerShow.com is brought to you by CrystalGraphics, the award-winning developer and market-leading publisher of rich-media enhancement products for presentations. Our product offerings include millions of PowerPoint templates, diagrams, animated 3D characters and more.