Electric Industry Restructuring New Imperatives in a Competitive Environment - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Electric Industry Restructuring New Imperatives in a Competitive Environment

Description:

Increased power reliability/quality. Protects utility/customer equipment. Uninterruptible power supply to grid. LOS ALAMOS. FCL: Achievements ... – PowerPoint PPT presentation

Number of Views:34
Avg rating:3.0/5.0
Slides: 11
Provided by: MST46
Category:

less

Transcript and Presenter's Notes

Title: Electric Industry Restructuring New Imperatives in a Competitive Environment


1
Electric Industry RestructuringNew Imperatives
in a Competitive Environment
Increase Efficiency Improve power reliability and
quality Enhance Market Access Address
Environmental Concerns Optimize Siting Control
Costs
New Technologies Provide the Path to Success
LOS ALAMOS
2
Advantages of HTS to End Users
Higher power density cables and electrical
equipment
Much higher electrical currents
Unique properties of superconductors
New solutions to Customer needs
More efficient carrier of electricity
Lower operating costs
Significant environmental advantages
LOS ALAMOS
3
HTS Cable Multiplying Grid Capacity
  • User Benefits
  • Higher Power Capacity - 3-5 x Conventional
  • Smaller right of way - easier siting/retrofits
  • Avoided construction - cost savings
  • Lower voltage - substation elimination
  • More environmentally acceptable - no oil

LOS ALAMOS
4
Power Cable Retrofit
  • Higher power density, lower cooling requirement,
    oil free
  • Retrofit of 400' (120 m) of three3-phase copper
    underground cables with a single 3-phase HTS
    underground cable
  • Carries the same 2.4 kA total current at 24 kV
    (100 MVA) as the original copper cables and
    leaves 2/3 of conduit space available for future
    capacity
  • Located within the Frisbie Substation of Detroit
    Edison, Detroit, MI

Materials Science and Technology Division
Superconductivity
Technology Center
5
FCL Benefits
  • Compatible with existing protection devices
  • Maximum allowable current adjustable
  • Greater system flexibility - higher power
  • Defer transmission/distribution upgrades
  • Increased power reliability/quality
  • Protects utility/customer equipment
  • Uninterruptible power supply to grid

LOS ALAMOS
6
FCL Achievements
  • Under construction 17 kV, 45 kA, 765 MVA
  • Three phases
  • Handles 2 faults of 400 msec each, 15 s apart
  • Fault reduction of 80
  • Tested 2000 A normal and 9000 A fault
  • Insulation Breakdown 110 kV
  • Cryocooler operation

LOS ALAMOS
7
Fault Current Limiter on Site
Southern California Edison, Norwalk, CA Substation
8
Industrial Research Park Building 1 Under
Construction
Los Alamos
9
A 200 W excimer laser will be used in a
continuous tape coater in the research park
Industrial lasers being tested at the Lambda
Physik factory
10
High Temperature Superconductors
REVOLUTIONIZING THE WAY THE WORLD USES
ELECTRICITY
LOS ALAMOS
Write a Comment
User Comments (0)
About PowerShow.com