The Silicon Detector Design Study SiD Organization - PowerPoint PPT Presentation

About This Presentation
Title:

The Silicon Detector Design Study SiD Organization

Description:

Critical Questions for SiD Jim Brau. Simulation status Norman Graf ... Fwd trac. At least one representative of each R&D effort in each DS. Goal: ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 10
Provided by: harry178
Category:

less

Transcript and Presenter's Notes

Title: The Silicon Detector Design Study SiD Organization


1
The Silicon Detector Design StudySiD
Organization Status
SiD kick off meeting at ACFA-7 meeting Taipei,
Taiwan Nov 9-12, 2004
  • H.Weerts
  • Fermilab/Michigan State Univ.

2
SiD kick-off meeting agenda

  • Agenda
  • Intro Harry
    Weerts
  • Critical Questions for SiD Jim Brau
  • Simulation status Norman
    Graf
  • Goals/Organization Harry
    Weerts
  • Discussion/Interest? All
  • Other talks at ACFA-7 earlier today
  • The Sid Concept by John Jaros

3
Goals for SiD Design Study
  • Develop an integrated detector design
    well-matched to LC physics at .5 and 1 TeV,
    starting from the SiD Detector Concept.
  • Generate a realistic picture of detectors,
    supports,readout, and services for each
    subdetector technology.
  • Optimize overall detector physics performance for
    benchmark reactions, constrained by rational
    cost.
  • Define the RD needed to prove the design
    concept.
  • Estimate detector costs in time for the Machine
    CDR.
  • Write a CDR describing the design and its
    expected physics performance. Refine costs
    estimates in time for the Machine TDR.

4
Goals and time line--draft
Benchmarks physics ( agree with other
designs) Conceptual design ? CDR Cost estimate (
need guidelines standards) Show technical
feasibility of subsystems Define necessary RD
Goal
WWS
Fall 2004 Summer 2005
Hadr. Showers Algorithms
Design Studies agree on common assumptions Optimiz
e design Make design realistic ( necessary
support, etc.) Establish simulation ( common with
all others ?) Performance/Response to benchmark
processes
August 2005, Int. Lin. Coll. Wrkshp at Snowmass
Agree on strawman design Start final series of
benchmark and simulations Define work needed to
complete by end 2005
5
Detector RD efforts Design Studies
Vxd 4-5 SiLC TPC Jet Calice EM Calice HAD LC cal Cal Asia EM OR/ SLAC EM hybrid muon
SiD X X X X X X X X
LAD X X X X X X X X X X X
HUD X ? X X X X X X
Fwd trac Fwd cal Fwd Che DAQ gg BDIR
SiD X X X X
LAD X X ? X X
HUD X X ? X X
Nearly all detector RD efforts are represented
in the Design Studies (DS)
At least one representative of each RD effort in
each DS
Goal
6
Draft Organization of SiD
Obvious center of gravity in US, and at SLAC
Fermilab, however this IS a global effort and we
would like to see active participation from all
regions of the world.
Wan to reflect this in organization.
Suggestions welcome.
7
More Organization
There is a SiD website
www-sid.slac.stanford.edu
On this Web site you will find
Talks/presentations on SiD SiD Hypernews
discussion forum Sign up for interested parties
8
Meetings now future
Weekly/bi-weekly ( phone/video)
  • Tracking meetings every week on Friday morning
    now more emphasis on SiD tracker layout and
    design
  • Monthly solenoid meetings
  • Bi weekly calorimeter meetings will start in Dec.
    2004
  • Start other subsystem meetings soon

Subsystem leader meeting in Jan/Feb 2005
March 14-16 CALICE at NIU/FNAL
March 17, 2005 ( Day before LCWS2005 at
SLAC) One Day SiD Meeting
.. More to be defined
August ILCWS 2005 _at_ Snowmass
Big opportunity for SiD collaborative effort
9
Summary
Why are we here ?
Invite your participation in the SiD Design Study
We have a starting point for the SiD Design
Study, but the end result will depend very much
on input from participants all around the globe
over the next year and beyond
Write a Comment
User Comments (0)
About PowerShow.com